Federal Register / Vol. 72, No.

221 / Friday, November 16, 2007 / Notices 64607

powerhouse to an interconnection point p. Proposed Scope of Studies Under agency’s comments must also be sent to
with an existing transmission line; and Permit: A preliminary permit, if issued, the Applicant’s representatives.
(5) appurtenant facilities. The proposed does not authorize construction. The
Kimberly D. Bose,
Montgomery Locks & Dam Project term of the proposed preliminary permit
would have an average annual Secretary.
would be 36 months. The work
generation of 220 gigawatt-hours. proposed under the preliminary permit [FR Doc. E7–22399 Filed 11–15–07; 8:45 am]
l. This filing is available for review at BILLING CODE 6717–01–P
would include economic analysis,
the Commission in the Public Reference preparation of preliminary engineering
Room or may be viewed on the plans, and a study of environmental
Commission’s Web site at http:// DEPARTMENT OF ENERGY
impacts. Based on the results of these
www.ferc.gov using the ‘‘eLibrary’’ link. studies, the Applicant would decide Federal Energy Regulatory
Enter the docket number excluding the whether to proceed with the preparation Commission
last three digits in the docket number of a development application to
field to access the document. For construct and operate the project. [Project No. 12894–000]
assistance, call toll-free 1–866–208–
q. Comments, Protests, or Motions to BPUS Generation Development, LLC;
3676 or e-mail
Intervene: Anyone may submit Notice of Application Accepted for
FERCONLINESUPPORT@FERC.GOV.
For TTY, call (202) 502–8659. A copy is comments, a protest, or a motion to Filing and Soliciting Motions To
also available for inspection and intervene in accordance with the Intervene, Protests, and Comments
reproduction at the address in item h requirements of Rules of Practice and
November 8, 2007.
above. Procedure, 18 CFR 385.210, 385.211,
385.214. In determining the appropriate Take notice that the following
m. Competing Preliminary Permit: hydroelectric application has been filed
Anyone desiring to file a competing action to take, the Commission will
consider all protests or other comments with the Commission and is available
application for preliminary permit for a for public inspection:
proposed project must submit the filed, but only those who file a motion
to intervene in accordance with the a. Type of Application: Preliminary
competing application itself, or a notice Permit.
of intent to file such an application, to Commission’s Rules may become a
b. Project No.: 12894–000.
the Commission on or before the party to the proceeding. Any comments,
c. Date filed: July 30, 2007.
specified comment date for the protests, or motions to intervene must d. Applicant: BPUS Generation
particular application (see 18 CFR 4.36). be received on or before the specified Development, LLC.
Submission of a timely notice of intent comment date for the particular e. Name of Project: Opekiska Lock &
allows an interested person to file the application. Dam Hydroelectric Project.
competing preliminary permit r. Filing and Service of Responsive f. Location: Monongahela River in
application no later than 30 days after Documents: Any filings must bear in all Monongalia County, West Virginia. It
the specified comment date for the capital letters the title ‘‘COMMENTS’’, would use the U.S. Army Corps of
particular application. A competing ‘‘NOTICE OF INTENT TO FILE Engineers’ Opekiska Lock & Dam.
preliminary permit application must COMPETING APPLICATION’’, g. Filed Pursuant to: Federal Power
conform with 18 CFR 4.30 and 4.36. ‘‘COMPETING APPLICATION’’, Act, 16 U.S.C. 791(a)–825(r).
n. Competing Development ‘‘PROTEST’’, and ‘‘MOTION TO h. Applicant Contact: Mr. Jeffrey M.
Application: Any qualified development INTERVENE’’, as applicable, and the Auser, P.E., BPUS Generation
applicant desiring to file a competing Project Number of the particular Development, LLC, 225 Greenfield
development application must submit to application to which the filing refers. Parkway, Suite 201, Liverpool, NY
the Commission, on or before a Any of the above-named documents 13088, (315) 413–2700.
specified comment date for the must be filed by providing the original i. FERC Contact: Robert Bell, (202)
particular application, either a and the number of copies provided by 502–4126.
competing development application or a the Commission’s regulations to: The j. Deadline for filing comments,
notice of intent to file such an Secretary, Federal Energy Regulatory protests, and motions to intervene: 60
application. Submission of a timely Commission, 888 First Street, NE., days from the issuance date of this
notice of intent to file a development Washington, DC 20426. An additional notice.
application allows an interested person copy must be sent to Director, Division All documents (original and eight
to file the competing application no of Hydropower Administration and copies) should be filed with: Kimberly
later than 120 days after the specified Compliance, Federal Energy Regulatory D. Bose, Secretary, Federal Energy
comment date for the particular Regulatory Commission, 888 First
Commission, at the above-mentioned
application. A competing license Street, NE., Washington, DC 20426.
address. A copy of any notice of intent,
application must conform with 18 CFR Comments, protests, and interventions
competing application or motion to
4.30 and 4.36. may be filed electronically via the
intervene must also be served upon each
o. Notice of Intent: A notice of intent Internet in lieu of paper; see 18 CFR
representative of the Applicant
must specify the exact name, business 385.2001(a)(1)(iii) and the instructions
specified in the particular application.
address, and telephone number of the on the Commission’s web site under the
prospective applicant, and must include s. Agency Comments: Federal, State, ‘‘e-Filing’’ link. The Commission
an unequivocal statement of intent to and local agencies are invited to file strongly encourages electronic filings.
submit, if such an application may be comments on the described application. Please include the project number (P–
mstockstill on PROD1PC66 with NOTICES

filed, either a preliminary permit A copy of the application may be 12893–000) on any comments or
application or a development obtained by agencies directly from the motions filed.
application (specify which type of Applicant. If an agency does not file The Commission’s Rules of Practice
application). A notice of intent must be comments within the time specified for and Procedure require all intervenors
served on the applicant(s) named in this filing comments, it will be presumed to filing documents with the Commission
public notice. have no comments. One copy of an to serve a copy of that document on

VerDate Aug<31>2005 21:48 Nov 15, 2007 Jkt 214001 PO 00000 Frm 00034 Fmt 4703 Sfmt 4703 E:\FR\FM\16NON1.SGM 16NON1
64608 Federal Register / Vol. 72, No. 221 / Friday, November 16, 2007 / Notices

each person in the official service list notice of intent to file such an Washington, DC 20426. An additional
for the project. Further, if an intervenor application. Submission of a timely copy must be sent to Director, Division
files comments or documents with the notice of intent to file a development of Hydropower Administration and
Commission relating to the merits of an application allows an interested person Compliance, Federal Energy Regulatory
issue that may affect the responsibilities to file the competing application no Commission, at the above-mentioned
of a particular resource agency, they later than 120 days after the specified address. A copy of any notice of intent,
must also serve a copy of the document comment date for the particular competing application or motion to
on that resource agency. application. A competing license intervene must also be served upon each
k. Description of Project: The application must conform with 18 CFR representative of the Applicant
proposed project using the U.S. Army 4.30 and 4.36. specified in the particular application.
Corps of Engineers’ Opekiska Lock & o. Notice of Intent: A notice of intent s. Agency Comments: Federal, State,
Dam and operated in a run-of-river must specify the exact name, business and local agencies are invited to file
mode would consist of: (1) A new 45- address, and telephone number of the comments on the described application.
foot long, 160-foot wide, 60-foot high prospective applicant, and must include A copy of the application may be
concrete powerhouse; (2) a new intake an unequivocal statement of intent to obtained by agencies directly from the
channel and tailrace channel on the submit, if such an application may be Applicant. If an agency does not file
west side of the river opposite the lock filed, either a preliminary permit comments within the time specified for
structure; (3) one turbine/generator unit application or a development filing comments, it will be presumed to
with an installed capacity of 10 application (specify which type of have no comments. One copy of an
megawatts; (4) a new 4,900-foot long application). A notice of intent must be agency’s comments must also be sent to
above ground transmission line served on the applicant(s) named in this the Applicant’s representatives.
extending from the switchyard near the public notice.
powerhouse to an interconnection point p. Proposed Scope of Studies Under Kimberly D. Bose,
with an existing transmission line Permit: A preliminary permit, if issued, Secretary.
northwest of the powerhouse; and (5) does not authorize construction. The [FR Doc. E7–22400 Filed 11–15–07; 8:45 am]
appurtenant facilities. The proposed term of the proposed preliminary permit BILLING CODE 6717–01–P
Opekiska Lock & Dam Project would would be 36 months. The work
have an average annual generation of 42 proposed under the preliminary permit
gigawatt-hours. would include economic analysis, DEPARTMENT OF ENERGY
l. This filing is available for review at preparation of preliminary engineering
the Commission in the Public Reference plans, and a study of environmental Federal Energy Regulatory
Room or may be viewed on the impacts. Based on the results of these Commission
Commission’s Web site at http:// studies, the Applicant would decide [Project No. 12895–000]
www.ferc.gov using the ‘‘eLibrary’’ link. whether to proceed with the preparation
Enter the docket number excluding the of a development application to BPUS Generation Development, LLC;
last three digits in the docket number construct and operate the project. Notice of Application Accepted for
field to access the document. For q. Comments, Protests, or Motions to Filing and Soliciting Motions To
assistance, call toll-free 1–866–208– Intervene: Anyone may submit Intervene, Protests, and Comments
3676 or e-mail comments, a protest, or a motion to
FERCONLINESUPPORT@FERC.GOV. intervene in accordance with the November 8, 2007.
For TTY, call (202) 502–8659. A copy is requirements of Rules of Practice and Take notice that the following
also available for inspection and Procedure, 18 CFR 385.210, 385.211, hydroelectric application has been filed
reproduction at the address in item h 385.214. In determining the appropriate with the Commission and is available
above. action to take, the Commission will for public inspection:
m. Competing Preliminary Permit: consider all protests or other comments a. Type of Application: Preliminary
Anyone desiring to file a competing filed, but only those who file a motion Permit.
application for preliminary permit for a to intervene in accordance with the b. Project No.: 12895–000.
proposed project must submit the Commission’s Rules may become a c. Date filed: July 30, 2007.
competing application itself, or a notice party to the proceeding. Any comments, d. Applicant: BPUS Generation
of intent to file such an application, to protests, or motions to intervene must Development, LLC.
the Commission on or before the be received on or before the specified e. Name of Project: Mississippi Lock
specified comment date for the comment date for the particular & Dam No. 13 Hydroelectric Project.
particular application (see 18 CFR 4.36). application. f. Location: Mississippi River in
Submission of a timely notice of intent r. Filing and Service of Responsive Clinton County, Iowa. It would use the
allows an interested person to file the Documents: Any filings must bear in all U.S. Army Corps of Engineers’
competing preliminary permit capital letters the title ‘‘COMMENTS’’, Mississippi Lock & Dam No. 13.
application no later than 30 days after ‘‘NOTICE OF INTENT TO FILE g. Filed Pursuant to: Federal Power
the specified comment date for the COMPETING APPLICATION’’, Act, 16 U.S.C. 791(a)–825(r).
particular application. A competing ‘‘COMPETING APPLICATION’’, h. Applicant Contact: Mr. Jeffrey M.
preliminary permit application must ‘‘PROTEST’’, and ‘‘MOTION TO Auser, P.E., BPUS Generation
conform with 18 CFR 4.30 and 4.36. INTERVENE’’, as applicable, and the Development, LLC, 225 Greenfield
n. Competing Development Project Number of the particular Parkway, Suite 201, Liverpool, NY
Application: Any qualified development application to which the filing refers. 13088, (315) 413–2700.
mstockstill on PROD1PC66 with NOTICES

applicant desiring to file a competing Any of the above-named documents i. FERC Contact: Robert Bell, (202)
development application must submit to must be filed by providing the original 502–4126.
the Commission, on or before a and the number of copies provided by j. Deadline for filing comments,
specified comment date for the the Commission’s regulations to: The protests, and motions to intervene: 60
particular application, either a Secretary, Federal Energy Regulatory days from the issuance date of this
competing development application or a Commission, 888 First Street, NE., notice.

VerDate Aug<31>2005 21:48 Nov 15, 2007 Jkt 214001 PO 00000 Frm 00035 Fmt 4703 Sfmt 4703 E:\FR\FM\16NON1.SGM 16NON1