You are on page 1of 1

Federal Register / Vol. 72, No.

213 / Monday, November 5, 2007 / Notices 62465

Persons unable to file electronically A copy of the EA is attached to a McMinnvile, Oregon; and Thursday,
should submit an original and 14 copies Commission order titled ‘‘Order November 15 in Forest Grove, Oregon.
of the intervention or protest to the Amending License,’’ issued October 29, Further details on how to submit
Federal Energy Regulatory Commission, 2007, and is available for review in the comments and additional details of the
888 First St. NE., Washington, DC Commission’s Public Reference Room. public scoping meetings are provided in
20426. A copy of the EA may also be viewed the Public Participation section of this
The filings in the above proceedings on the Commission’s Web site at notice.
are accessible in the Commission’s http://www.ferc.gov using the The FERC will be the lead federal
eLibrary system by clicking on the ‘‘eLibrary’’ link. Enter the docket agency in the preparation of an EIS that
appropriate link in the above list. They number (P–2233) in the docket number will satisfy the requirements of the
are also available for review in the field to access the document. For National Environmental Policy Act
Commission’s Public Reference Room in assistance, contact FERC Online (NEPA) and will be used by the FERC
Washington, DC. There is an Support at to consider the environmental impacts
eSubscription link on the Web site that FERCOnlineSupport@ferc.gov or toll- that could result if the Commission
enables subscribers to receive e-mail free at 1–866–208–3676, or for TTY, issues PGT a Certificate of Public
notification when a document is added (202) 502–8659. Convenience and Necessity under
to a subscribed docket(s). For assistance section 7 of the Natural Gas Act.
Kimberly D. Bose, This NOI is being sent to Federal,
with any FERC Online service, please e-
Secretary. State, and local government agencies;
mail FERCOnlineSupport@ferc.gov. or
[FR Doc. E7–21660 Filed 11–2–07; 8:45 am] elected officials; affected landowners;
call (866) 208–3676 (toll free). For TTY,
call (202) 502–8659. BILLING CODE 6717–01–P environmental and public interest
groups; Indian tribes and regional
Nathaniel J. Davis, Jr., Native American organizations;
Acting Deputy Secretary. DEPARTMENT OF ENERGY commentors and other interested
[FR Doc. E7–21650 Filed 11–2–07; 8:45 am] parties; and local libraries and
Federal Energy Regulatory newspapers. We encourage government
BILLING CODE 6717–01–P
Commission representatives to notify their
[Docket No. PF07–13–000] constituents of this planned project and
DEPARTMENT OF ENERGY encourage them to comment on their
Palomar Gas Transmission, LLC; areas of concern.
Federal Energy Regulatory Notice of Intent To Prepare an If you are a landowner receiving this
Commission Environmental Impact Statement for notice, you may be contacted by a PGT
[Project No. 2233–066 Oregon]
the Proposed Palomar Gas representative about the acquisition of
Transmission Project; Request for an easement to construct, operate, and
Portland General Electric Company; Comments on Environmental Issues maintain the proposed facilities. The
Notice of Availability of Environmental and Notice of Public Meetings pipeline would seek to negotiate a
Assessment October 29, 2007.
mutually acceptable agreement.
However, if the project is approved by
October 29, 2007. The Federal Energy Regulatory
Commission (FERC or Commission) is the FERC, that approval conveys with it
An environmental assessment (EA) is the right of eminent domain. Therefore,
available for public review. The EA was in the process of preparing an
environmental impact statement (EIS) if easement negotiations fail to produce
prepared for an application filed by an agreement, the pipeline company
Portland General Electric Company on the environmental impacts of the
Palomar Gas Transmission Project could initiate condemnation
(licensee) on December 29, 2006, and proceedings in accordance with state
supplemented on February 26, 2007, involving the construction and
operation of a new underground natural law.
requesting Commission approval of an A fact sheet prepared by the FERC
amendment of license to increase the gas pipeline proposed by Palomar Gas
Transmission, LLC (PGT). This Notice of entitled ‘‘An Interstate Natural Gas
height of temporary flashboards on the Facility on My Land? What Do I Need
concrete dam along the crest of Intent (NOI) explains the scoping
process that will be used to gather input To Know?’’ is available for viewing on
Willamette Falls from 2.0 feet to 3.5 feet, the FERC Internet Web site (http://
in addition to other modifications, at the from the public and interested agencies
on the project. Your input will help www.ferc.gov/for-citizens/citizen-
Willamette Falls Hydroelectric Project. guides.asp). This fact sheet addresses a
determine which issues will be
The project is located on the Willamette number of typically asked questions,
evaluated in the EIS. Please note that
River near the cities of West Linn and including the use of eminent domain
the scoping period for this project will
Oregon City in Clackamas County, and how to participate in FERC’s
close on November 28, 2007.
Oregon. The project does not occupy Comments on the project may be proceedings.
any federal lands. submitted in written form or verbally. In
The EA evaluates the environmental Summary of the Proposed Project
lieu of or in addition to sending written
impacts that would result from PGT has announced its proposal to
comments, we1 also invite you to attend
approving the licensee’s proposed construct and operate a new natural gas
the public scoping meetings that have
increase in flashboard height and pipeline and associated structures with
been scheduled in the project area. The
installation of temporary adult lamprey a bi-directional flow capacity of 1.4
meetings are scheduled for Monday,
passage structures. The EA finds that billion cubic feet per day. The project
November 12 in Maupin, Oregon;
approval of the amendment application, would be located in northwest Oregon
Tuesday, November 13 in Molalla,
ycherry on PRODPC74 with NOTICES

combined with Commission and consist of a 211-mile-long, 36-inch-


Oregon; Wednesday, November 14 in
modifications, would not constitute a diameter pipeline running from near
major federal action significantly 1 ‘‘We,’’ ‘‘us,’’ and ‘‘our’’ refer to the Shaniko, Wasco County, Oregon to near
affecting the quality of the human environmental staff of the FERC’s Office of Energy Wauna, Clatsop County, Oregon. The
environment. Projects. pipeline would travel across Wasco,

VerDate Aug<31>2005 15:04 Nov 02, 2007 Jkt 214001 PO 00000 Frm 00038 Fmt 4703 Sfmt 4703 E:\FR\FM\05NON1.SGM 05NON1