Common Applications

LAB-3: Creating Surface Style Rule


Objective
After This Lab Students will be able to Create surface style rules.
Surface style rules combine filters with surface styles and apply them to selected
aspects of objects.
Lecture: Instructor Needs to explain creation of surface style rules.
1

Set your workspace to show U01

Select Format , Surface Style Rules

Click New to define a new surface style rule.

Key in All Piping , under rule name

Under the Filter pulldown, select More

Under Catalog filters, expand Default Filters, SP3D Object Filters, Object Types
and select Piping(select Piping filter not the folder)

Select Yellow for the style.

36 SmartPlant 3D Common Applications Labs

Common Applications
8

Under Aspects uncheck everything except Simple Physical. Ok

To apply the rule, select the All Piping rule in the style rules library and Add it
to the workspace using the Add button.

10 Click Ok to apply the rule


11 Using same method, create a new rule called All Structural objects.

SmartPlant 3D Common Applications Labs 37

Common Applications
12 Under Catalog filters, expand Default Filters, SP3D Object Filters, Object Types
and select Structure filter (Do not Select Structure folder)
13 Select Green as the Style to be applied and click OK to create the rule
14 Add this rule to the workspace and click OK.

15 Select Format Surface Style Rule.


16 Select Both Rules from Right side and Remove.
17 Ok on the form

38 SmartPlant 3D Common Applications Labs

Common Applications

LAB-4: Work Break Down Structure


Objective
After This Lab Students will be able to assign Work Break Down item to existing
objects
Lecture: Instructor Needs to explain WBS. Assigning WBS using claim option and/or
using WBS tab on WSE
1

Set your workspace to show U02

Select Tools, Select by Filter

Under Catalog filters, expand Default Filters, SP3D Object Filters, Object Types
and select Structure

System will highlight all Structure objects from U02

From Active WBS, select Project 1 (Select more, and then select Project 1)
Note: If Project 1 is not in the list, select the database option at the top of the form

SmartPlant 3D Common Applications Labs 39

Common Applications

Go To Project and select Claim

This will assign Project 1 to all Selected Objects

While all Structural objects are selected, go to Project and select assign to WBS

Open Project 1 and select Contract 2

10 Ok on the form
11 Review the properties of few Structural objects to make sure they have WBS
assigned (on relationship Tab).

40 SmartPlant 3D Common Applications Labs