60832 Federal Register / Vol. 72, No.

207 / Friday, October 26, 2007 / Notices

Any person desiring to intervene or to the Commission’s Rules of Practice and Protests will be considered by the
protest this filing must file in Procedure (18 CFR 385.211, 385.214). Commission in determining the
accordance with Rules 211 and 214 of Protests will be considered by the appropriate action to be taken, but will
the Commission’s Rules of Practice and Commission in determining the not serve to make protestants parties to
Procedure (18 CFR 385.211, 385.214). appropriate action to be taken, but will the proceeding. Any person wishing to
Protests will be considered by the not serve to make protestants parties to become a party must file a notice of
Commission in determining the the proceeding. Any person wishing to intervention or motion to intervene, as
appropriate action to be taken, but will become a party must file a notice of appropriate. Such notices, motions, or
not serve to make protestants parties to intervention or motion to intervene, as protests must be filed on or before the
the proceeding. Any person wishing to appropriate. Such notices, motions, or comment date. On or before the
become a party must file a notice of protests must be filed on or before the comment date, it is not necessary to
intervention or motion to intervene, as comment date. Anyone filing a motion serve motions to intervene or protests
appropriate. Such notices, motions, or to intervene or protest must serve a copy on persons other than the Applicant.
protests must be filed on or before the of that document on the Applicant and The Commission encourages
comment date. On or before the all the parties in this proceeding. electronic submission of protests and
comment date, it is not necessary to The Commission encourages interventions in lieu of paper using the
serve motions to intervene or protests electronic submission of protests and ‘‘eFiling’’ link at http://www.ferc.gov.
on persons other than the Applicant. interventions in lieu of paper using the Persons unable to file electronically
The Commission encourages ‘‘eFiling’’ link at http://www.ferc.gov. should submit an original and 14 copies
electronic submission of protests and Persons unable to file electronically of the protest or intervention to the
interventions in lieu of paper using the should submit an original and 14 copies Federal Energy Regulatory Commission,
‘‘eFiling’’ link at http://www.ferc.gov. of the protest or intervention to the 888 First Street, NE., Washington, DC
Persons unable to file electronically Federal Energy Regulatory Commission, 20426.
should submit an original and 14 copies 888 First Street, NE., Washington, DC This filing is accessible on-line at
of the protest or intervention to the 20426. http://www.ferc.gov, using the
Federal Energy Regulatory Commission, This filing is accessible on-line at ‘‘eLibrary’’ link and is available for
888 First Street, NE., Washington, DC http://www.ferc.gov, using the review in the Commission’s Public
20426. ‘‘eLibrary’’ link and is available for Reference Room in Washington, DC.
This filing is accessible on-line at review in the Commission’s Public There is an ‘‘eSubscription’’ link on the
http://www.ferc.gov, using the Reference Room in Washington, DC. Web site that enables subscribers to
‘‘eLibrary’’ link and is available for There is an ‘‘eSubscription’’ link on the receive e-mail notification when a
review in the Commission’s Public Web site that enables subscribers to document is added to a subscribed
Reference Room in Washington, DC. receive e-mail notification when a docket(s). For assistance with any FERC
There is an ‘‘eSubscription’’ link on the document is added to a subscribed Online service, please e-mail
Web site that enables subscribers to docket(s). For assistance with any FERC FERCOnlineSupport@ferc.gov, or call
receive e-mail notification when a Online service, please e-mail (866) 208–3676 (toll free). For TTY, call
document is added to a subscribed FERCOnlineSupport@ferc.gov, or call (202) 502–8659.
docket(s). For assistance with any FERC (866) 208–3676 (toll free). For TTY, call Comment Date: 5 p.m. Eastern Time
Online service, please e-mail (202) 502–8659. on November 2, 2007.
FERCOnlineSupport@ferc.gov, or call Comment Date: 5 p.m. Eastern Time
Kimberly D. Bose,
(866) 208–3676 (toll free). For TTY, call on November 14, 2007.
(202) 502–8659. Secretary.
Kimberly D. Bose, [FR Doc. E7–21153 Filed 10–25–07; 8:45 am]
Comment Date: 5 p.m. Eastern Time
on October 31, 2007. Secretary. BILLING CODE 6717–01–P
[FR Doc. E7–21155 Filed 10–25–07; 8:45 am]
Kimberly D. Bose, BILLING CODE 6717–01–P
Secretary. DEPARTMENT OF ENERGY
[FR Doc. E7–21154 Filed 10–25–07; 8:45 am]
BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory
Commission
Federal Energy Regulatory
[Docket No. CP08–6–000 and Docket No.
DEPARTMENT OF ENERGY Commission PF07–4–000]
[Docket No. EL08–4–000]
Federal Energy Regulatory Midcontinent Express Pipeline LLC;
Commission Entergy Gulf States, Inc.; Notice of Notice of Application
[Docket No. ID–4025–001] Filing
October 23, 2007.
Brown, D. Tim; Notice of Filing October 18, 2007. Take notice that on October 9, 2007,
Take notice that on October 12, 2007, and supplemented on October 19, 2007,
October 18, 2007. Entergy Gulf States, Inc., on behalf of Midcontinent Express Pipeline LLC
Take notice that on October 15, 2007, Gulf States Louisiana, L.L.C. and (Midcontinent), 747 East 22nd Street,
Tim D. Brown filed an application for Entergy Texas, Inc., filed a petition for Lombard, Illinois 60148, filed an
approval to hold interlocking positions, declaratory order regarding payment of abbreviated application pursuant to
pursuant to section 45.8 of the dividends from paid-in capital. section 7(c) of the Natural Gas Act
rmajette on PROD1PC64 with NOTICES

Commission’s regulation, 18 CFR 45.8 Any person desiring to intervene or to (NGA) and Part 157 of the Commission’s
(2007). protest this filing must file in regulations, for a certificate of public
Any person desiring to intervene or to accordance with Rules 211 and 214 of convenience and necessity to construct
protest this filing must file in the Commission’s Rules of Practice and and operate a new 502-mile natural gas
accordance with Rules 211 and 214 of Procedure (18 CFR 385.211, 385.214). pipeline system from southeastern

VerDate Aug<31>2005 15:23 Oct 25, 2007 Jkt 214001 PO 00000 Frm 00037 Fmt 4703 Sfmt 4703 E:\FR\FM\26OCN1.SGM 26OCN1
Federal Register / Vol. 72, No. 207 / Friday, October 26, 2007 / Notices 60833

Oklahoma to western Alabama. This non-environmental issues by March protests must be filed on or before the
filing is available for review at the 2008, and a final order by July 2008, in comment date. Anyone filing a motion
Commission in the Public Reference order to commence construction by to intervene or protest must serve a copy
Room or may be viewed on the August 1, 2008. Midcontinent of that document on the Applicant. On
Commission’s Web site at http:// anticipates placing some pipeline or before the comment date, it is not
www.ferc.gov using the ‘‘eLibrary’’ link. facilities in-service on October 31, 2008, necessary to serve motions to intervene
Enter the docket number excluding the with all of the proposed facilities, or protests on persons other than the
last three digits in the docket number except the final 2 compressor stations, Applicant.
field to access the document. For going into service on February 28, 2009.
assistance, please contact FERC Online Any questions regarding the However, a person does not have to
Support at application are to be directed to Bruce intervene in order to have comments
FERCOnlineSupport@ferc.gov or toll H. Newsome, Vice President, considered. The second way to
free at (866) 208–3676, or for TTY, Regulatory, Midcontinent Express participate is by filing with the
contact (202) 502–8659. Pipeline LLC, 747 East 22nd Street, Secretary of the Commission, as soon as
Midcontinent requests: (1) Lombard, Illinois 60148–5072, possible, an original and two copies of
Authorization to construct a new telephone: (630) 691–3526 or e-mail: comments in support of or in opposition
natural gas pipeline system consisting of bruce_newsome@kindermorgan.com. to this project. The Commission will
502 miles of primarily 30-inch to 42- On February 22, 2007, the consider these comments in
inch diameter pipeline, a booster Commission staff granted determining the appropriate action to be
compressor station (9,470 hp), and 4 Midcontinent’s request to utilize the taken, but the filing of a comment alone
mainline compressor stations (102,250 National Environmental Policy Act will not serve to make the filer a party
hp), which will originate in (NEPA) Pre-Filing Process and assigned to the proceeding. The Commission’s
southeastern Oklahoma, continue Docket No. PF07–4–000 to staff
rules require that persons filing
through Texas, Louisiana, Mississippi, activities involving the project. Now, as
comments in opposition to the project
and terminate in western Alabama; (2) of the filing of this application on
October 9, 2007, the NEPA Pre-Filing provide copies of their protests only to
authorization to lease up to 800,000
Dth/d in the Enogex Inc. intrastate Process for this project has ended. From the party or parties directly involved in
system in Oklahoma to be connected at this time forward, this proceeding will the protest.
the origin of the Midcontinent system; be conducted in Docket No. CP08–6– Persons who wish to comment only
(3) approval of Midcontinent’s pro 000, as noted in the caption of this on the environmental review of this
forma tariff and proposed recourse rates; notice. project should submit an original and
and (4) issuance of a blanket Pursuant to section 157.9 of the two copies of their comments to the
construction certificate pursuant to Commission’s rules, 18 CFR 157.9, Secretary of the Commission.
Subpart F of Part 157 and a blanket within 90 days of this Notice the Environmental commenters will be
transportation certificate pursuant to Commission staff will either: complete placed on the Commission’s
Subpart G of Part 284. On October 9, its environmental assessment (EA) and environmental mailing list, will receive
2007, Enogex Inc. filed a related place it into the Commission’s public copies of the environmental documents,
application, in Docket No. CP08–9–000, record (eLibrary) for this proceeding, or and will be notified of meetings
seeking a limited-jurisdiction certificate issue a Notice of Schedule for
associated with the Commission’s
authorizing Enogex to lease up to Environmental Review. If a Notice of
environmental review process.
800,000 Dth/d of its intrastate pipeline Schedule for Environmental Review is
issued, it will indicate, among other Environmental commenters will not be
capacity to Midcontinent.
milestones, the anticipated date for the required to serve copies of filed
Midcontinent proposes phased in-
service dates and recourse rates. Commission staff’s issuance of the final documents on all other parties.
Midcontinent has committed to lease environmental impact statement (FEIS) However, the non-party commenters
275,334 Dth/d of capacity on the Enogex or EA for this proposal. The filing of the will not receive copies of all documents
system but requests authority to EA in the Commission’s public record filed by other parties or issued by the
increase the lease capacity up to for this proceeding or the issuance of a Commission (except for the mailing of
800,000 Dth/d at any time during the Notice of Schedule for Environmental environmental documents issued by the
first 5 years after the project’s in-service Review will serve to notify federal and Commission) and will not have the right
date. Midcontinent also requests that it state agencies of the timing for the to seek court review of the
be allowed up to 5 years after the completion of all necessary reviews, and Commission’s final order.
project’s in-service date in which to the subsequent need to complete all The Commission encourages
construct 2 of the requested mainline federal authorizations within 90 days of electronic submission of protests and
compressor stations. The project will the date of issuance of the Commission interventions in lieu of paper using the
have two zones. Without the 2 delayed- staff’s FEIS or EA. ‘‘eFiling’’ link at http://www.ferc.gov.
construction compressor stations, Zone Any person desiring to intervene or to
Persons unable to file electronically
1 will have a capacity of 1,400,000 protest this filing must file in
should submit the original and 14
Dth/d and Zone 2 capacity will be accordance with Rules 211 and 214 of
copies of the protest or intervention to
1,000,000 Dth/d. Construction of the the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and the Federal Energy regulatory
final 2 compressor stations will provide
an additional 100,000 Dth/d of capacity 385.214). Protests will be considered by Commission, 888 First Street, NE.,
in Zone 1 and an additional 200,000 the Commission in determining the Washington, DC 20426.
Dth/d in Zone 2. Estimated initial appropriate action to be taken, but will Comment Date: November 13, 2007.
rmajette on PROD1PC64 with NOTICES

project cost is $1.28 billion without the not serve to make protestants parties to
Kimberly D. Bose,
final 2 compressor stations, rising to the proceeding. Any person wishing to
$1.34 billion with the final 2 become a party must file a notice of Secretary.
compressor stations. Midcontinent intervention or motion to intervene, as [FR Doc. E7–21229 Filed 10–25–07; 8:45 am]
requests a preliminary determination on appropriate. Such notices, motions, or BILLING CODE 6717–01–P

VerDate Aug<31>2005 15:23 Oct 25, 2007 Jkt 214001 PO 00000 Frm 00038 Fmt 4703 Sfmt 4703 E:\FR\FM\26OCN1.SGM 26OCN1