60840 Federal Register / Vol. 72, No.

207 / Friday, October 26, 2007 / Notices

document. For assistance, call toll-free whether to proceed with the preparation DEPARTMENT OF ENERGY
1–866–208–3676 or e-mail of a development application to
FERCOnlineSupport@ferc.gov. For TTY, construct and operate the project. Federal Energy Regulatory
call (202) 502–8659. A copy is also Commission
r. Comments, Protests, or Motions to
available for inspection and [Project No. 12843–000]
Intervene—Anyone may submit
reproduction at the address in item h
comments, a protest, or a motion to
above. FFP Project 23, LLC; Notice of
m. Individuals desiring to be included intervene in accordance with the
requirements of Rules of Practice and Application Accepted for Filing and
on the Commission’s mailing list should Soliciting Motions To Intervene,
so indicate by writing to the Secretary Procedure, 18 CFR 385.210, .211, .214.
Protests, and Comments
of the Commission. In determining the appropriate action to
n. Competing Preliminary Permit— take, the Commission will consider all October 18, 2007.
Anyone desiring to file a competing protests or other comments filed, but Take notice that the following
application for preliminary permit for a only those who file a motion to hydroelectric application has been filed
proposed project must submit the intervene in accordance with the with the Commission and is available
competing application itself, or a notice Commission’s Rules may become a for public inspection:
of intent to file such an application, to party to the proceeding. Any comments, a. Type of Application: Preliminary
the Commission on or before the protests, or motions to intervene must Permit.
specified comment date for the be received on or before the specified b. Project No.: 12843–000.
particular application (see 18 CFR 4.36). comment date for the particular c. Date filed: July 25, 2007.
Submission of a timely notice of intent application. d. Applicant: FFP Project 23, LLC.
allows an interested person to file the e. Name of Project: White Alder
competing preliminary permit Comments, protests and interventions Project.
application no later than 30 days after may be filed electronically via the f. Location: The project would be
the specified comment date for the Internet in lieu of paper. See 18 CFR located on the Mississippi River in St.
particular application. A competing 385.2001 (a)(1)(iii) and the instructions Gabriel and Iberville Parishes,
preliminary permit application must on the Commission’s Web site under ‘‘e- Louisiana. The project uses no dam or
conform with 18 CFR 4.30 and 4.36. filing’’ link. The Commission strongly impoundment.
o. Competing Development encourages electronic filing. g. Filed Pursuant to: Federal Power
Application—Any qualified Act, 16 U.S.C. 791(a)–825(r).
s. Filing and Service of Responsive
development applicant desiring to file a h. Applicant Contact: Mr. Dan Irvin,
Documents—Any filings must bear in FFP Project 23, LLC, 69 Bridge Street,
competing development application
all capital letters the title Manchester, MA 01944, phone (978)
must submit to the Commission, on or
before a specified comment date for the ‘‘COMMENTS’’, ‘‘COMPETING 232–3536.
particular application, either a APPLICATION’’, i. FERC Contact: Robert Bell, (202)
competing development application or a ‘‘RECOMMENDATIONS FOR TERMS 502–6062.
notice of intent to file such an AND CONDITIONS’’, ‘‘PROTEST’’, OR j. Deadline for filing comments,
application. Submission of a timely ‘‘MOTION TO INTERVENE’’, as protests, and motions to intervene: 60
notice of intent to file a development applicable, and the Project Number of days from the issuance date of this
application allows an interested person the particular application to which the notice.
to file the competing application no filing refers. Any of the above-named All documents (original and eight
later than 120 days after the specified documents must be filed by providing copies) should be filed with: Kimberly
comment date for the particular the original and the number of copies D. Bose, Secretary, Federal Energy
application. A competing license provided by the Commission’s Regulatory Commission, 888 First
application must conform with 18 CFR regulations to: The Secretary, Federal Street, NE., Washington, DC 20426.
4.30 and 4.36. Energy Regulatory Commission, 888 Comments, protests, and interventions
p. Notice of Intent—A notice of intent First Street, NE., Washington, DC 20426. may be filed electronically via the
must specify the exact name, business A copy of any motion to intervene must Internet in lieu of paper; see 18 CFR
address, and telephone number of the also be served upon each representative 385.2001(a)(1)(iii) and the instructions
prospective applicant, and must include of the Applicant specified in the on the Commission’s Web site under the
an unequivocal statement of intent to particular application. ‘‘e-Filing’’ link. The Commission
submit, if such an application may be strongly encourages electronic filings.
filed, either a preliminary permit t. Agency Comments—Federal, state, Please include the project number (P–
application or a development and local agencies are invited to file 12843–000) on any comments or
application (specify which type of comments on the described application. motions filed.
application). A notice of intent must be A copy of the application may be The Commission’s Rules of Practice
served on the applicant(s) named in this obtained by agencies directly from the and Procedure require all intervenors
public notice. Applicant. If an agency does not file filing documents with the Commission
q. Proposed Scope of Studies under comments within the time specified for to serve a copy of that document on
Permit—A preliminary permit, if issued, filing comments, it will be presumed to each person in the official service list
does not authorize construction. The have no comments. One copy of an for the project. Further, if an intervenor
term of the proposed preliminary permit agency’s comments must also be sent to files comments or documents with the
would be 36 months. The work the Applicant’s representatives. Commission relating to the merits of an
proposed under the preliminary permit issue that may affect the responsibilities
rmajette on PROD1PC64 with NOTICES

would include economic analysis, Kimberly D. Bose, of a particular resource agency, they
preparation of preliminary engineering Secretary. must also serve a copy of the document
plans, and a study of environmental [FR Doc. E7–21156 Filed 10–25–07; 8:45 am] on that resource agency.
impacts. Based on the results of these BILLING CODE 6717–01–P k. Description of Project: The
studies, the Applicant would decide proposed project consists of: (1) 2,550

VerDate Aug<31>2005 15:23 Oct 25, 2007 Jkt 214001 PO 00000 Frm 00045 Fmt 4703 Sfmt 4703 E:\FR\FM\26OCN1.SGM 26OCN1
Federal Register / Vol. 72, No. 207 / Friday, October 26, 2007 / Notices 60841

proposed 20 kilowatt Free Flow prospective applicant, and must include comments on the described application.
generating units having a total installed an unequivocal statement of intent to A copy of the application may be
capacity of 51 megawatts, (2) a proposed submit, if such an application may be obtained by agencies directly from the
transmission line; and (3) appurtenant filed, either a preliminary permit Applicant. If an agency does not file
facilities. The FFP Project 23, LLC, application or a development comments within the time specified for
project would have an average annual application (specify which type of filing comments, it will be presumed to
generation of 223.38 gigawatt-hours and application). A notice of intent must be have no comments. One copy of an
be sold to a local utility. served on the applicant(s) named in this agency’s comments must also be sent to
l. Locations of Applications: A copy of public notice. the Applicant’s representatives.
the application is available for q. Proposed Scope of Studies Under
inspection and reproduction at the Permit: A preliminary permit, if issued, Kimberly D. Bose,
Commission in the Public Reference does not authorize construction. The Secretary.
Room, located at 888 First Street, NE., term of the proposed preliminary permit [FR Doc. E7–21157 Filed 10–25–07; 8:45 am]
Room 2A, Washington DC 20426, or by would be 36 months. The work BILLING CODE 6717–01–P
calling (202) 502–8371. This filing may proposed under the preliminary permit
also be viewed on the Commission’s would include economic analysis,
Web site at http://www.ferc.gov using preparation of preliminary engineering DEPARTMENT OF ENERGY
the ‘‘eLibrary’’ link. Enter the docket plans, and a study of environmental
number excluding the last three digits in impacts. Based on the results of these Federal Energy Regulatory
the docket number field to access the studies, the Applicant would decide Commission
document. For assistance, call toll-free whether to proceed with the preparation [Project No. 12829–000; Project No. 12852–
1–866–208–3676 or e-mail of a development application to 000]
FERCOnlineSupport@ferc.gov. For TTY, construct and operate the project.
call (202) 502–8659. A copy is also r. Comments, Protests, or Motions To Free Flow Power Corporation; FFP
available for inspection and Intervene: Anyone may submit Project 8 LLC; Notice of Competing
reproduction at the address in item h comments, a protest, or a motion to Applications Accepted for Filing and
above. intervene in accordance with the Soliciting Comments, Motions to
m. Individuals desiring to be included requirements of Rules of Practice and Intervene, and Protests
on the Commission’s mailing list should Procedure, 18 CFR 385.210, .211, .214.
October 19, 2007.
so indicate by writing to the Secretary In determining the appropriate action to
of the Commission. take, the Commission will consider all Take notice that the following
n. Competing Preliminary Permit: protests or other comments filed, but hydroelectric applications have been
Anyone desiring to file a competing only those who file a motion to filed with the Commission and are
application for preliminary permit for a intervene in accordance with the available for public inspection:
proposed project must submit the Commission’s Rules may become a a. Type of Applications: Preliminary
competing application itself, or a notice party to the proceeding. Any comments, Permit (Competing).
of intent to file such an application, to protests, or motions to intervene must b. Applicants, Project Numbers, and
the Commission on or before the be received on or before the specified Dates Filed:
specified comment date for the comment date for the particular Free Flow Power Corporation, filed
particular application (see 18 CFR 4.36). application. the application for Project No. 12829–
Submission of a timely notice of intent Comments, protests and interventions 000 on July 23, 2007.
allows an interested person to file the may be filed electronically via the FFP Project 8, LLC filed the
competing preliminary permit Internet in lieu of paper. See 18 CFR application for Project No.12852–000 on
application no later than 30 days after 385.2001(a)(1)(iii) and the instructions July 25, 2007.
the specified comment date for the on the Commission’s Web site under ‘‘e- c. Name of the project is Greenville
particular application. A competing filing’’ link. The Commission strongly Bend Project. The project would be
preliminary permit application must encourages electronic filing. located on the Mississippi River in
conform with 18 CFR 4.30 and 4.36. s. Filing and Service of Responsive Orleans and Jefferson Counties,
o. Competing Development Documents: Any filings must bear in all Louisiana. The project would use no
Application: Any qualified development capital letters the title ‘‘COMMENTS’’, dam or impoundment.
applicant desiring to file a competing ‘‘COMPETING APPLICATION’’, d. Filed Pursuant to: Federal Power
development application must submit to ‘‘RECOMMENDATIONS FOR TERMS Act, 16 U.S.C. 791a—825r.
the Commission, on or before a AND CONDITIONS’’, ‘‘PROTEST’’, OR e. Applicants Contacts: For the Free
specified comment date for the ‘‘MOTION TO INTERVENE’’, as Flow Power Corporation: Mr. Dan Irvin,
particular application, either a applicable, and the Project Number of Free Flow Power Corporation, 69 Bridge
competing development application or a the particular application to which the Street, Manchester, MA 01944, phone
notice of intent to file such an filing refers. Any of the above-named (978) 232–3536. FFP Project 8, LLC:Mr.
application. Submission of a timely documents must be filed by providing Dan Irvin, FFP Project 7, LLC, 69 Bridge
notice of intent to file a development the original and the number of copies Street, Manchester, MA 01944, phone
application allows an interested person provided by the Commission’s (978) 232–3536.
to file the competing application no regulations to: The Secretary, Federal f. FERC Contact: Robert Bell, (202)
later than 120 days after the specified Energy Regulatory Commission, 888 502–6062.
comment date for the particular First Street, NE., Washington, DC 20426. g. Deadline for filing comments,
application. A competing license A copy of any motion to intervene must protests, and motions to intervene: 60
rmajette on PROD1PC64 with NOTICES

application must conform with 18 CFR also be served upon each representative days from the issuance date of this
4.30 and 4.36. of the Applicant specified in the notice.
p. Notice of Intent: A notice of intent particular application. All documents (original and eight
must specify the exact name, business t. Agency Comments: Federal, State, copies) should be filed with: Secretary,
address, and telephone number of the and local agencies are invited to file Federal Energy Regulatory Commission,

VerDate Aug<31>2005 15:23 Oct 25, 2007 Jkt 214001 PO 00000 Frm 00046 Fmt 4703 Sfmt 4703 E:\FR\FM\26OCN1.SGM 26OCN1