Federal Register / Vol. 72, No.

203 / Monday, October 22, 2007 / Notices 59525

DEPARTMENT OF ENERGY Corps of Engineers’ Point Marion Lock o. Notice of Intent—A notice of intent
& Dam and operated in a run-of-river must specify the exact name, business
Federal Energy Regulatory mode would consist of: (1) A new 200- address, and telephone number of the
Commission foot long, 250-foot wide, 50-foot high prospective applicant, and must include
[Project No. 12887–000] concrete powerhouse; (2) a new intake an unequivocal statement of intent to
waterway through the fixed-crest weir of submit, if such an application may be
BPUS Generation Development, LLC; the dam; (3) a new 50-foot wide tailrace; filed, either a preliminary permit
Notice of Application Accepted for (4) two turbine/generator units with a application or a development
Filing and Soliciting Motions To combined installed capacity of 10.6 application (specify which type of
Intervene, Protests, and Comments megawatts; (5) a new 11,500-foot above application). A notice of intent must be
ground transmission line extending served on the applicant(s) named in this
October 12, 2007. from the switchyard near the public notice.
Take notice that the following powerhouse to an interconnection point p. Proposed Scope of Studies Under
hydroelectric application has been filed with an existing transmission southeast Permit—A preliminary permit, if issued,
with the Commission and is available of the powerhouse on the east side of does not authorize construction. The
for public inspection: the river; and (6) appurtenant facilities. term of the proposed preliminary permit
a. Type of Application: Preliminary The proposed Point Marion Lock & Dam would be 36 months. The work
Permit. Project would have an average annual proposed under the preliminary permit
b. Project No.: 12887–000. generation of 46.4 gigawatt-hours. would include economic analysis,
c. Date filed: July 30, 2007. l. This filing is available for review at preparation of preliminary engineering
d. Applicant: BPUS Generation the Commission in the Public Reference plans, and a study of environmental
Development, LLC. Room or may be viewed on the impacts. Based on the results of these
e. Name of Project: Point Marion Lock Commission’s Web site at http:// studies, the Applicant would decide
& Dam Hydroelectric Project. www.ferc.gov using the ‘‘eLibrary’’ link. whether to proceed with the preparation
f. Location: Monongahela River in Enter the docket number excluding the of a development application to
Fayette County, Pennsylvania. It would last three digits in the docket number construct and operate the project.
use the U.S. Army Corps of Engineers’ field to access the document. For q. Comments, Protests, or Motions to
Point Marion Lock & Dam. assistance, call toll-free 1–866–208– Intervene—Anyone may submit
g. Filed Pursuant to: Federal Power 3676 or e-mail comments, a protest, or a motion to
Act, 16 U.S.C. 791(a)–825(r). ferconlinesupport@ferc.gov. For TTY, intervene in accordance with the
h. Applicant Contact: Mr. Jeffrey M. call (202) 502–8659. A copy is also requirements of Rules of Practice and
Auser, P.E., BPUS Generation available for inspection and Procedure, 18 CFR 385.210, 385.211,
Development, LLC, 225 Greenfield reproduction at the address in item h 385.214. In determining the appropriate
Parkway, Suite 201, Liverpool, NY above. action to take, the Commission will
13088, (315) 413–2700. m. Competing Preliminary Permit— consider all protests or other comments
i. FERC Contact: Robert Bell, (202) Anyone desiring to file a competing filed, but only those who file a motion
502–4126. application for preliminary permit for a to intervene in accordance with the
j. Deadline for filing comments, proposed project must submit the Commission’s Rules may become a
protests, and motions to intervene: 60 competing application itself, or a notice party to the proceeding. Any comments,
days from the issuance date of this of intent to file such an application, to protests, or motions to intervene must
notice. the Commission on or before the be received on or before the specified
All documents (original and eight specified comment date for the comment date for the particular
copies) should be filed with: Secretary, particular application (see 18 CFR 4.36). application.
Federal Energy Regulatory Commission, Submission of a timely notice of intent r. Filing and Service of Responsive
888 First Street, NE., Washington, DC allows an interested person to file the Documents—Any filings must bear in
20426. Comments, protests, and competing preliminary permit all capital letters the title
interventions may be filed electronically application no later than 30 days after ‘‘COMMENTS’’, ‘‘NOTICE OF INTENT
via the Internet in lieu of paper; see 18 the specified comment date for the TO FILE COMPETING APPLICATION’’,
CFR 385.2001(a)(1)(iii) and the particular application. A competing ‘‘COMPETING APPLICATION’’,
instructions on the Commission’s Web preliminary permit application must ‘‘PROTEST’’, and ‘‘MOTION TO
site under the ‘‘e-Filing’’ link. The conform with 18 CFR 4.30 and 4.36. INTERVENE’’, as applicable, and the
Commission strongly encourages n. Competing Development Project Number of the particular
electronic filings. Please include the Application—Any qualified application to which the filing refers.
project number (P–12887–000) on any development applicant desiring to file a Any of the above-named documents
comments or motions filed. competing development application must be filed by providing the original
The Commission’s Rules of Practice must submit to the Commission, on or and the number of copies provided by
and Procedure require all intervenors before a specified comment date for the the Commission’s regulations to: The
filing documents with the Commission particular application, either a Secretary, Federal Energy Regulatory
to serve a copy of that document on competing development application or a Commission, 888 First Street, NE.,
each person in the official service list notice of intent to file such an Washington, DC 20426. An additional
for the project. Further, if an intervenor application. Submission of a timely copy must be sent to Director, Division
files comments or documents with the notice of intent to file a development of Hydropower Administration and
Commission relating to the merits of an application allows an interested person Compliance, Federal Energy Regulatory
issue that may affect the responsibilities to file the competing application no Commission, at the above-mentioned
ebenthall on PRODPC61 with NOTICES

of a particular resource agency, they later than 120 days after the specified address. A copy of any notice of intent,
must also serve a copy of the document comment date for the particular competing application or motion to
on that resource agency. application. A competing license intervene must also be served upon each
k. Description of Project: The application must conform with 18 CFR representative of the Applicant
proposed project using the U.S. Army 4.30 and 4.36. specified in the particular application.

VerDate Aug<31>2005 16:13 Oct 19, 2007 Jkt 214001 PO 00000 Frm 00015 Fmt 4703 Sfmt 4703 E:\FR\FM\22OCN1.SGM 22OCN1
59526 Federal Register / Vol. 72, No. 203 / Monday, October 22, 2007 / Notices

s. Agency Comments—Federal, state, site under the ‘‘e-Filing’’ link. The preliminary permit application must
and local agencies are invited to file Commission strongly encourages conform with 18 CFR 4.30 and 4.36.
comments on the described application. electronic filings. Please include the n. Competing Development
A copy of the application may be project number (P–12888–000) on any Application—Any qualified
obtained by agencies directly from the comments or motions filed. development applicant desiring to file a
Applicant. If an agency does not file The Commission’s Rules of Practice competing development application
comments within the time specified for and Procedure require all intervenors must submit to the Commission, on or
filing comments, it will be presumed to filing documents with the Commission before a specified comment date for the
have no comments. One copy of an to serve a copy of that document on particular application, either a
agency’s comments must also be sent to each person in the official service list competing development application or a
the Applicant’s representatives. for the project. Further, if an intervenor notice of intent to file such an
files comments or documents with the application. Submission of a timely
Kimberly D. Bose, Commission relating to the merits of an notice of intent to file a development
Secretary. issue that may affect the responsibilities application allows an interested person
[FR Doc. E7–20711 Filed 10–19–07; 8:45 am] of a particular resource agency, they to file the competing application no
BILLING CODE 6717–01–P must also serve a copy of the document later than 120 days after the specified
on that resource agency. comment date for the particular
k. Description of Project: The application. A competing license
DEPARTMENT OF ENERGY proposed project using the U.S. Army application must conform with 18 CFR
Corps of Engineers’ C. W. Bill Young 4.30 and 4.36.
Federal Energy Regulatory Lock & Dam and operated in a run-of- o. Notice of Intent—A notice of intent
Commission river mode would consist of: (1) A new must specify the exact name, business
[Project No. 12888–000] 125-foot long, 160-foot wide, 60-foot address, and telephone number of the
high concrete powerhouse; (2) a new prospective applicant, and must include
BPUS Generation Development, LLC; intake channel and tailrace channel on an unequivocal statement of intent to
Notice of Application Accepted for the north side of the river by removing submit, if such an application may be
Filing and Soliciting Motions To a portion of the fixed-crest dam near the filed, either a preliminary permit
Intervene, Protests, and Comments north bank; (3) three turbine/generator application or a development
units with a combined installed application (specify which type of
October 12, 2007. capacity of 15 megawatts; (4) a new application). A notice of intent must be
Take notice that the following 6,500-foot above ground transmission served on the applicant(s) named in this
hydroelectric application has been filed line extending from the switchyard near public notice.
with the Commission and is available the powerhouse to an interconnection p. Proposed Scope of Studies Under
for public inspection: point with an existing substation Permit—A preliminary permit, if issued,
a. Type of Application: Preliminary located east of the powerhouse and does not authorize construction. The
Permit. dam; and (5) appurtenant facilities. The term of the proposed preliminary permit
b. Project No.: 12888–000. proposed C. W. Bill Young Lock & Dam would be 36 months. The work
c. Date filed: July 30, 2007. Project would have an average annual proposed under the preliminary permit
d. Applicant: BPUS Generation generation of 93 gigawatt-hours. would include economic analysis,
Development, LLC. l. This filing is available for review at preparation of preliminary engineering
e. Name of Project: C. W. Bill Young the Commission in the Public Reference plans, and a study of environmental
Lock & Dam Hydroelectric Project. Room or may be viewed on the impacts. Based on the results of these
f. Location: Allegheny River in Commission’s Web site at http:// studies, the Applicant would decide
Allegheny County, Pennsylvania. It www.ferc.gov using the ‘‘eLibrary’’ link. whether to proceed with the preparation
would use the U.S. Army Corps of Enter the docket number excluding the of a development application to
Engineers’ C. W. Bill Young Lock & last three digits in the docket number construct and operate the project.
Dam. field to access the document. For q. Comments, Protests, or Motions to
g. Filed Pursuant to: Federal Power assistance, call toll-free 1–866–208– Intervene—Anyone may submit
Act, 16 U.S.C. 791(a)–825(r). 3676 or e-mail comments, a protest, or a motion to
h. Applicant Contact: Mr. Jeffrey M. ferconlinesupport@ferc.gov. For TTY, intervene in accordance with the
Auser, P.E., BPUS Generation call (202) 502–8659. A copy is also requirements of Rules of Practice and
Development, LLC, 225 Greenfield available for inspection and Procedure, 18 CFR 385.210, 385.211,
Parkway, Suite 201, Liverpool, NY reproduction at the address in item h 385.214. In determining the appropriate
13088, (315) 413–2700. above. action to take, the Commission will
i. FERC Contact: Robert Bell, (202) m. Competing Preliminary Permit— consider all protests or other comments
502–4126. Anyone desiring to file a competing filed, but only those who file a motion
j. Deadline for filing comments, application for preliminary permit for a to intervene in accordance with the
protests, and motions to intervene: 60 proposed project must submit the Commission’s Rules may become a
days from the issuance date of this competing application itself, or a notice party to the proceeding. Any comments,
notice. of intent to file such an application, to protests, or motions to intervene must
All documents (original and eight the Commission on or before the be received on or before the specified
copies) should be filed with: Secretary, specified comment date for the comment date for the particular
Federal Energy Regulatory Commission, particular application (see 18 CFR 4.36). application.
888 First Street, NE., Washington, DC Submission of a timely notice of intent r. Filing and Service of Responsive
ebenthall on PRODPC61 with NOTICES

20426. Comments, protests, and allows an interested person to file the Documents—Any filings must bear in
interventions may be filed electronically competing preliminary permit all capital letters the title
via the Internet in lieu of paper; see 18 application no later than 30 days after ‘‘COMMENTS’’, ‘‘NOTICE OF INTENT
CFR 385.2001(a)(1)(iii) and the the specified comment date for the TO FILE COMPETING APPLICATION’’,
instructions on the Commission’s Web particular application. A competing ‘‘COMPETING APPLICATION’’,

VerDate Aug<31>2005 15:02 Oct 19, 2007 Jkt 214001 PO 00000 Frm 00016 Fmt 4703 Sfmt 4703 E:\FR\FM\22OCN1.SGM 22OCN1