You are on page 1of 2

Federal Register / Vol. 72, No.

194 / Tuesday, October 9, 2007 / Notices 57329

available for inspection and r. Comments, Protests, or Motions to DEPARTMENT OF ENERGY


reproduction at the address in item h Intervene—Anyone may submit
above. comments, a protest, or a motion to Federal Energy Regulatory
m. Individuals desiring to be included intervene in accordance with the Commission
on the Commission’s mailing list should requirements of Rules of Practice and [Project No. 4656–020]
so indicate by writing to the Secretary Procedure, 18 CFR 385.210, .211, .214.
of the Commission. In determining the appropriate action to Boise-Kuna Irrigation District, Nampa
n. Competing Preliminary Permit— take, the Commission will consider all & Meridian Irrigation District, New York
Anyone desiring to file a competing protests or other comments filed, but Irrigation District, Wilder Irrigation
application for preliminary permit for a only those who file a motion to District, and Big Bend Irrigation
proposed project must submit the intervene in accordance with the District; Notice of Application for
competing application itself, or a notice Commission’s Rules may become a Amendment of License and Soliciting
of intent to file such an application, to party to the proceeding. Any comments, Comments, Motions To Intervene, and
the Commission on or before the protests, or motions to intervene must Protests
specified comment date for the
be received on or before the specified September 26, 2007.
particular application (see 18 CFR 4.36).
comment date for the particular Take notice that the following
Submission of a timely notice of intent
allows an interested person to file the application. hydroelectric application has been filed
competing preliminary permit Comments, protests and interventions with the Commission and is available
application no later than 30 days after may be filed electronically via the for public inspection:
the specified comment date for the Internet in lieu of paper. See 18 CFR a. Application Type: Amendment of
particular application. A competing 385.2001(a)(1)(iii) and the instructions License.
preliminary permit application must on the Commission’s Web site at http:// b. Project No.: 4656–020.
conform with 18 CFR 4.30 and 4.36. c. Date Filed: August 1, 2007.
www.ferc.gov under the ‘‘e-Filing’’ link. d. Applicant: Boise-Kuna Irrigation
o. Competing Development s. Filing and Service of Responsive District, Nampa & Meridian Irrigation
Application—Any qualified Documents—Any filings must bear in District, New York Irrigation District,
development applicant desiring to file a all capital letters the title Wilder Irrigation District, and Big Bend
competing development application
‘‘COMMENTS’’, ‘‘NOTICE OF INTENT Irrigation District (Districts).
must submit to the Commission, on or e. Name of Project: Arrowrock Dam
TO FILE COMPETING APPLICATION’’,
before a specified comment date for the Hydroelectric Project.
particular application, either a ‘‘COMPETING APPLICATION’’,
‘‘PROTEST’’, and ‘‘MOTION TO f. Location: The project will be
competing development application or a located at the U.S. Bureau of
notice of intent to file such an INTERVENE’’, as applicable, and the
Project Number of the particular Reclamation’s (Reclamation) existing
application. Submission of a timely Arrowrock Dam and Reservoir on the
notice of intent to file a development application to which the filing refers.
Any of the above-named documents South Fork of the Boise River, in Elmore
application allows an interested person and Ada Counties, Idaho. Parts of the
to file the competing application no must be filed by providing the original
project would occupy lands managed by
later than 120 days after the specified and the number of copies provided by
Reclamation and the U.S. Corps of
comment date for the particular the Commission’s regulations to: The
Engineers and lands managed by the
application. A competing license Secretary, Federal Energy Regulatory U.S. Forest Service within the Boise
application must conform with 18 CFR Commission, 888 First Street, NE., National Forest.
4.30 and 4.36. Washington, DC 20426. An additional g. Filed Pursuant to: Federal Power
p. Notice of Intent—A notice of intent copy must be sent to Director, Division Act, 16 U.S.C. 791a–825r.
must specify the exact name, business of Hydropower Administration and h. Applicant Contact: Albert P.
address, and telephone number of the Compliance, Federal Energy Regulatory Barker, Barker Rosholt & Simpson LLP,
prospective applicant, and must include Commission, at the above-mentioned 1010 West Jefferson Street, Suite 102,
an unequivocal statement of intent to address. A copy of any notice of intent, Boise, Idaho 83701; telephone (208)
submit, if such an application may be competing application or motion to 336–0700.
filed, either a preliminary permit intervene must also be served upon each i. FERC Contact: Linda Stewart,
application or a development representative of the Applicant telephone (202) 502–6680, and e-mail:
application (specify which type of specified in the particular application. linda.stewart@ferc.gov.
application). A notice of intent must be j. Deadline for filing comments,
served on the applicant(s) named in this t. Agency Comments—Federal, state,
motions to intervene, and protest:
public notice. and local agencies are invited to file October 29, 2007.
q. Proposed Scope of Studies Under comments on the described application. All documents (original and eight
Permit—A preliminary permit, if issued, A copy of the application may be copies) should be filed with: Secretary,
does not authorize construction. The obtained by agencies directly from the Federal Energy Regulatory Commission,
term of the proposed preliminary permit Applicant. If an agency does not file 888 First Street, NE., Washington, DC
would be 36 months. The work comments within the time specified for 20426.
proposed under the preliminary permit filing comments, it will be presumed to The Commission’s Rules of Practice
would include economic analysis, have no comments. One copy of an and Procedure require all interveners
preparation of preliminary engineering agency’s comments must also be sent to filing documents with the Commission
mstockstill on PROD1PC66 with NOTICES

plans, and a study of environmental the Applicant’s representatives. to serve a copy of that document on
impacts. Based on the results of these each person whose name appears on the
Kimberly D. Bose,
studies, the Applicant would decide official service list for the project.
whether to proceed with the preparation Secretary. Further, if an intervener files comments
of a development application to [FR Doc. E7–19779 Filed 10–5–07; 8:45 am] or documents with the Commission
construct and operate the project. BILLING CODE 6717–01–P relating to the merits of an issue that

VerDate Aug<31>2005 17:07 Oct 05, 2007 Jkt 214001 PO 00000 Frm 00046 Fmt 4703 Sfmt 4703 E:\FR\FM\09OCN1.SGM 09OCN1
57330 Federal Register / Vol. 72, No. 194 / Tuesday, October 9, 2007 / Notices

may affect the responsibilities of a Procedure, 18 CFR 385.210, .211, .214. approximately 3.8 acres of federal land
particular resource agency, they must In determining the appropriate action to within the White River National Forest.
also serve a copy of the document on take, the Commission will consider all g. Filed Pursuant to: Federal Power
that resource agency. A copy of any protests or other comments filed, but Act, 16 U.S.C. 791(a)–825(r).
motion to intervene must also be served only those who file a motion to h. Applicant Contacts: Steven R.
upon each representative of the intervene in accordance with the Coley, Mountain Property Resources,
Applicant specified in the particular Commission’s Rules may become a LLC, 1857 County Road 109, Glenwood
application. party to the proceeding. Any comments, Springs, CO 81601, phone: (970) 230–
k. Description of Request: (1) protests, or motions to intervene must 0579.
Extension of Time: The Districts request be received on or before the specified i. FERC Contact: Henry Woo, (202)
an extension of time for the comment date for the particular 502–8872.
commencement of project construction application. j. Deadline for filing comments,
to December 13, 2009, pursuant to o. Any filings must bear in all capital protests, and motions to intervene: 60
Public Law 109–383. The Districts also letters the title ‘‘COMMENTS’’, days from the issuance date of this
propose changes, where necessary, to ‘‘PROTEST’’, or ‘‘MOTION TO notice.
dates or time periods specified in The Commission’s Rules of Practice
INTERVENE’’, as applicable, and the
various license articles such that the and Procedure require all intervenors
Project Number of the particular
dates or time periods for taking action filing documents with the Commission
application to which the filing refers.
would be tied to an order amending the p. Agency Comments: Federal, State, to serve a copy of that document on
project license; (2) Amendment to and local agencies are invited to file each person in the official service list
Project Design: The Districts propose to comments on the described application. for the project. Further, if an intervenor
install two 7.5-megawatt (MW) A copy of the application may be files comments or documents with the
generating units with a total installed obtained by agencies directly from the Commission relating to the merits of an
capacity of 15 MW instead of installing Applicant. If an agency does not file issue that may affect the responsibilities
two 30–MW generating units with a comments within the time specified for of a particular resource agency, they
total installed capacity of 60 MW, as filing comments, it will be presumed to must also serve a copy of the document
authorized in the March 27, 1989 Order have no comments. One copy of an on that resource agency.
Issuing License. The Districts also k. Description of Project: The
agency’s comments must also be sent to
propose to change the project’s proposed project would consist of: (1)
the Applicant’s representatives.
transmission line, which would An existing water diversion structure,
q. Comments, protests and
decrease in length by approximately 10 (2) a proposed 3,000-foot-long steel
interventions may be filed electronically
miles and would eliminate the need to penstock, (3) an existing powerhouse
via the Internet in lieu of paper. See, 18
use any lands managed by the Bureau of containing a proposed generating unit
CFR 385.2001(a)(1)(iii) and the
Land Management. The Districts request with an installed capacity of 140
instructions on the Commission’s Web
the deletion and/or revision of certain kilowatts, (4) a proposed 25 kilovolt
site at http://www.ferc.gov under the ‘‘e-
license articles that are directly related transmission line; and (5) appurtenant
Filing’’ link.
to the above proposed design changes. facilities. The applicant estimates the
l. Locations of the Application: A Kimberly D. Bose, average annual generation would be
copy of the application is available for Secretary. 1.209 gigawatt-hours and would be sold
inspection and reproduction at the [FR Doc. E7–19780 Filed 10–5–07; 8:45 am] to a local utility.
Commission’s Public Reference Room, BILLING CODE 6717–01–P
l. Locations of Applications: A copy of
located at 888 First Street, NE., Room the application is available for
2A, Washington, DC 20426, or by calling inspection and reproduction at the
(202) 502–8371. This filing may also be DEPARTMENT OF ENERGY Commission in the Public Reference
viewed on the Commission’s Web site at Room, located at 888 First Street, NE.,
http://www.ferc.gov using the Federal Energy Regulatory Room 2A, Washington, DC 20426, or by
‘‘eLibrary’’ link. Enter the docket Commission calling (202) 502–8371. This filing may
number excluding the last three digits in also be viewed on the Commission’s
[Project No. 12788–000]
the docket number field to access the Web site at http://www.ferc.gov using
document. You may also register online Mountain Property Resources, LLC; the ‘‘eLibrary’’ link. Enter the docket
at http://www.ferc.gov/docs-filing/ Notice of Application Accepted for number excluding the last three digits in
esubscription.asp to be notified via Filing and Soliciting Motions To the docket number field to access the
email of new filings and issuances Intervene, Protests, and Comments document. For assistance, call toll-free
related to this or other pending projects. 1–866–208–3676 or e-mail
For assistance, call 1–866–208–3676 or October 1, 2007. FERCOnlineSupport@ferc.gov. For TTY,
e-mail FERCOnlineSupport@ferc.gov, Take notice that the following call (202) 502–8659. A copy is also
for TTY, call (202) 502–8659. A copy is hydroelectric application has been filed available for inspection and
also available for inspection and with the Commission and is available reproduction at the address in item h
reproduction at the address in item (h) for public inspection: above.
above. a. Type of Application: Preliminary m. Individuals desiring to be included
m. Individuals desiring to be included Permit. on the Commission’s mailing list should
on the Commission’s mailing list should b. Project No.: 12788–000. so indicate by writing to the Secretary
so indicate by writing to the Secretary c. Date filed: March 22, 2007. of the Commission.
mstockstill on PROD1PC66 with NOTICES

of the Commission. d. Applicant: Mountain Property n. Competing Preliminary Permit—


n. Comments, Protests, or Motions to Resources, LLC. Anyone desiring to file a competing
Intervene: Anyone may submit e. Name of Project: Grace Project. application for preliminary permit for a
comments, a protest, or a motion to f. Location: The project would be proposed project must submit the
intervene in accordance with the located on Fall Creek in Eagle County, competing application itself, or a notice
requirements of Rules of Practice and Colorado. The project will occupy of intent to file such an application, to

VerDate Aug<31>2005 17:07 Oct 05, 2007 Jkt 214001 PO 00000 Frm 00047 Fmt 4703 Sfmt 4703 E:\FR\FM\09OCN1.SGM 09OCN1

You might also like