57330 Federal Register / Vol. 72, No.

194 / Tuesday, October 9, 2007 / Notices

may affect the responsibilities of a Procedure, 18 CFR 385.210, .211, .214. approximately 3.8 acres of federal land
particular resource agency, they must In determining the appropriate action to within the White River National Forest.
also serve a copy of the document on take, the Commission will consider all g. Filed Pursuant to: Federal Power
that resource agency. A copy of any protests or other comments filed, but Act, 16 U.S.C. 791(a)–825(r).
motion to intervene must also be served only those who file a motion to h. Applicant Contacts: Steven R.
upon each representative of the intervene in accordance with the Coley, Mountain Property Resources,
Applicant specified in the particular Commission’s Rules may become a LLC, 1857 County Road 109, Glenwood
application. party to the proceeding. Any comments, Springs, CO 81601, phone: (970) 230–
k. Description of Request: (1) protests, or motions to intervene must 0579.
Extension of Time: The Districts request be received on or before the specified i. FERC Contact: Henry Woo, (202)
an extension of time for the comment date for the particular 502–8872.
commencement of project construction application. j. Deadline for filing comments,
to December 13, 2009, pursuant to o. Any filings must bear in all capital protests, and motions to intervene: 60
Public Law 109–383. The Districts also letters the title ‘‘COMMENTS’’, days from the issuance date of this
propose changes, where necessary, to ‘‘PROTEST’’, or ‘‘MOTION TO notice.
dates or time periods specified in The Commission’s Rules of Practice
INTERVENE’’, as applicable, and the
various license articles such that the and Procedure require all intervenors
Project Number of the particular
dates or time periods for taking action filing documents with the Commission
application to which the filing refers.
would be tied to an order amending the p. Agency Comments: Federal, State, to serve a copy of that document on
project license; (2) Amendment to and local agencies are invited to file each person in the official service list
Project Design: The Districts propose to comments on the described application. for the project. Further, if an intervenor
install two 7.5-megawatt (MW) A copy of the application may be files comments or documents with the
generating units with a total installed obtained by agencies directly from the Commission relating to the merits of an
capacity of 15 MW instead of installing Applicant. If an agency does not file issue that may affect the responsibilities
two 30–MW generating units with a comments within the time specified for of a particular resource agency, they
total installed capacity of 60 MW, as filing comments, it will be presumed to must also serve a copy of the document
authorized in the March 27, 1989 Order have no comments. One copy of an on that resource agency.
Issuing License. The Districts also k. Description of Project: The
agency’s comments must also be sent to
propose to change the project’s proposed project would consist of: (1)
the Applicant’s representatives.
transmission line, which would An existing water diversion structure,
q. Comments, protests and
decrease in length by approximately 10 (2) a proposed 3,000-foot-long steel
interventions may be filed electronically
miles and would eliminate the need to penstock, (3) an existing powerhouse
via the Internet in lieu of paper. See, 18
use any lands managed by the Bureau of containing a proposed generating unit
CFR 385.2001(a)(1)(iii) and the
Land Management. The Districts request with an installed capacity of 140
instructions on the Commission’s Web
the deletion and/or revision of certain kilowatts, (4) a proposed 25 kilovolt
site at http://www.ferc.gov under the ‘‘e-
license articles that are directly related transmission line; and (5) appurtenant
Filing’’ link.
to the above proposed design changes. facilities. The applicant estimates the
l. Locations of the Application: A Kimberly D. Bose, average annual generation would be
copy of the application is available for Secretary. 1.209 gigawatt-hours and would be sold
inspection and reproduction at the [FR Doc. E7–19780 Filed 10–5–07; 8:45 am] to a local utility.
Commission’s Public Reference Room, BILLING CODE 6717–01–P
l. Locations of Applications: A copy of
located at 888 First Street, NE., Room the application is available for
2A, Washington, DC 20426, or by calling inspection and reproduction at the
(202) 502–8371. This filing may also be DEPARTMENT OF ENERGY Commission in the Public Reference
viewed on the Commission’s Web site at Room, located at 888 First Street, NE.,
http://www.ferc.gov using the Federal Energy Regulatory Room 2A, Washington, DC 20426, or by
‘‘eLibrary’’ link. Enter the docket Commission calling (202) 502–8371. This filing may
number excluding the last three digits in also be viewed on the Commission’s
[Project No. 12788–000]
the docket number field to access the Web site at http://www.ferc.gov using
document. You may also register online Mountain Property Resources, LLC; the ‘‘eLibrary’’ link. Enter the docket
at http://www.ferc.gov/docs-filing/ Notice of Application Accepted for number excluding the last three digits in
esubscription.asp to be notified via Filing and Soliciting Motions To the docket number field to access the
email of new filings and issuances Intervene, Protests, and Comments document. For assistance, call toll-free
related to this or other pending projects. 1–866–208–3676 or e-mail
For assistance, call 1–866–208–3676 or October 1, 2007. FERCOnlineSupport@ferc.gov. For TTY,
e-mail FERCOnlineSupport@ferc.gov, Take notice that the following call (202) 502–8659. A copy is also
for TTY, call (202) 502–8659. A copy is hydroelectric application has been filed available for inspection and
also available for inspection and with the Commission and is available reproduction at the address in item h
reproduction at the address in item (h) for public inspection: above.
above. a. Type of Application: Preliminary m. Individuals desiring to be included
m. Individuals desiring to be included Permit. on the Commission’s mailing list should
on the Commission’s mailing list should b. Project No.: 12788–000. so indicate by writing to the Secretary
so indicate by writing to the Secretary c. Date filed: March 22, 2007. of the Commission.
mstockstill on PROD1PC66 with NOTICES

of the Commission. d. Applicant: Mountain Property n. Competing Preliminary Permit—


n. Comments, Protests, or Motions to Resources, LLC. Anyone desiring to file a competing
Intervene: Anyone may submit e. Name of Project: Grace Project. application for preliminary permit for a
comments, a protest, or a motion to f. Location: The project would be proposed project must submit the
intervene in accordance with the located on Fall Creek in Eagle County, competing application itself, or a notice
requirements of Rules of Practice and Colorado. The project will occupy of intent to file such an application, to

VerDate Aug<31>2005 17:07 Oct 05, 2007 Jkt 214001 PO 00000 Frm 00047 Fmt 4703 Sfmt 4703 E:\FR\FM\09OCN1.SGM 09OCN1
Federal Register / Vol. 72, No. 194 / Tuesday, October 9, 2007 / Notices 57331

the Commission on or before the be received on or before the specified License and Commencing Licensing
specified comment date for the comment date for the particular Proceeding.
particular application (see 18 CFR 4.36). application. b. Project No.: 12741–001.
Submission of a timely notice of intent Comments, protests and interventions c. Dated Filed: September 20, 2006.
allows an interested person to file the may be filed electronically via the d. Submitted By: Albany Engineering
competing preliminary permit Internet in lieu of paper; See 18 CFR Corporation.
application no later than 30 days after 385.2001(a)(1)(iii) and the instructions e. Name of Project: Thomson
the specified comment date for the on the Commission’s Web site under Hydroelectric Project.
particular application. A competing ‘‘e-filing’’ link. The Commission f. Location: On the Hudson River in
preliminary permit application must strongly encourages electronic filing. the hamlet of Thomson, New York,
conform with 18 CFR 4.30 and 4.36. s. Filing and Service of Responsive within Saratoga and Washington
o. Competing Development Documents—Any filings must bear in Counties. No federal lands are involved.
Application—Any qualified all capital letters the title g. Filed Pursuant to: 18 CFR part 5 of
development applicant desiring to file a ‘‘COMMENTS’’, the Commission’s Regulations
competing development application ‘‘RECOMMENDATIONS FOR TERMS h. Potential Applicant Contact: James
must submit to the Commission, on or AND CONDITIONS’’, Besha, Albany Engineering Corp., 447
before a specified comment date for the ‘‘PROTEST’’,‘‘COMPETING New Karner Road, Albany, New York
particular application, either a APPLICATION’’ or ‘‘MOTION TO 12205, (518) 456–7712.
competing development application or a INTERVENE’’, as applicable, and the i. FERC Contact: Michael Spencer,
notice of intent to file such an Project Number of the particular michael.spencer@ferc.gov, (202) 502–
application. Submission of a timely application to which the filing refers. 6093.
notice of intent to file a development j. We are asking federal, state, local,
Any of the above-named documents
application allows an interested person and tribal agencies with jurisdiction
must be filed by providing the original
to file the competing application no and/or special expertise with respect to
and the number of copies provided by
later than 120 days after the specified environmental issues to cooperate with
the Commission’s regulations to: The
comment date for the particular us in the preparation of the
Secretary, Federal Energy Regulatory
application. A competing license environmental document. Agencies who
Commission, 888 First Street, NE.,
application must conform with 18 CFR would like to request cooperating status
Washington, DC 20426. A copy of any
4.30 and 4.36. should follow the instructions for filing
motion to intervene must also be served
p. Notice of Intent—A notice of intent comments described in paragraph o
upon each representative of the
must specify the exact name, business below. Cooperating agencies should
Applicant specified in the particular
address, and telephone number of the note the Commission’s policy that
application.
prospective applicant, and must include t. Agency Comments—Federal, state, agencies that cooperate in the
an unequivocal statement of intent to and local agencies are invited to file preparation of the environmental
submit, if such an application may be comments on the described application. document cannot also intervene. See, 94
filed, either a preliminary permit A copy of the application may be FERC ¶ 61,076 (2001).
application or a development k. With this notice, we are initiating
obtained by agencies directly from the
application (specify which type of informal consultation with: (a) The U.S.
Applicant. If an agency does not file
application). A notice of intent must be Fish and Wildlife Service and/or NOAA
comments within the time specified for
served on the applicant(s) named in this Fisheries under section 7 of the
filing comments, it will be presumed to
public notice. Endangered Species Act and the joint
have no comments. One copy of an
q. Proposed Scope of Studies under agency regulations thereunder at 50
agency’s comments must also be sent to
Permit—A preliminary permit, if issued, CFR, part 402; and (b) the State Historic
the Applicant’s representatives.
does not authorize construction. The Preservation Officer, as required by
term of the proposed preliminary permit Kimberly D. Bose, Section 106, National Historical
would be 36 months. The work Secretary. Preservation Act, and the implementing
proposed under the preliminary permit [FR Doc. E7–19788 Filed 10–5–07; 8:45 am] regulations of the Advisory Council on
would include economic analysis, BILLING CODE 6717–01–P Historic Preservation at 36 CFR 800.2.
preparation of preliminary engineering l. With this notice, we are designating
plans, and a study of environmental Albany Engineering Corporation as the
impacts. Based on the results of these DEPARTMENT OF ENERGY Commission’s non-federal
studies, the Applicant would decide representative for carrying out informal
whether to proceed with the preparation Federal Energy Regulatory consultation, pursuant to section 7 of
of a development application to Commission the Endangered Species Act and section
construct and operate the project. 106 of the National Historic
[Project No. 12741–001]
r. Comments, Protests, or Motions to Preservation Act.
Intervene—Anyone may submit Albany Engineering Corporation; m. Albany Engineering Corporation
comments, a protest, or a motion to Notice of Intent To File License filed a Pre-Application Document (PAD;
intervene in accordance with the Application, Filing of Pre-Application including a proposed process plan and
requirements of Rules of Practice and Document, Commencement of schedule) with the Commission,
Procedure, 18 CFR 385.210, .211, .214. Licensing Proceeding, Scoping pursuant to 18 CFR 5.6 of the
In determining the appropriate action to Meetings, Solicitation of Comments on Commission’s regulations. The
take, the Commission will consider all the Pad and Scoping Document, and Commission issued the Scoping
mstockstill on PROD1PC66 with NOTICES

protests or other comments filed, but Identification of Issues and Associated Document for the proposed Thomson
only those who file a motion to Study Requests Project on October 1, 2007.
intervene in accordance with the n. A copy of the PAD and the scoping
Commission’s Rules may become a October 1, 2007. document are available for review at the
party to the proceeding. Any comments, a. Type of Filing: Notice of Intent to Commission in the Public Reference
protests, or motions to intervene must File License Application for a New Room or may be viewed on the

VerDate Aug<31>2005 17:07 Oct 05, 2007 Jkt 214001 PO 00000 Frm 00048 Fmt 4703 Sfmt 4703 E:\FR\FM\09OCN1.SGM 09OCN1