Federal Register / Vol. 72, No.

192 / Thursday, October 4, 2007 / Notices 56731

gas capacity of each of two authorized parties. A party must submit 14 copies Springs, Colorado 80944, filed in Docket
storage caverns from 6.75 billion cubic of filings made with the Commission No. CP07–448–000, an application
feet (Bcf) to 7.8 Bcf, increasing the total and must mail a copy to the applicant under section 7 of the Natural Gas Act
project working gas capacity to 15.6 Bcf. and to every other party in the (NGA) and Part 157 of the Federal
Bobcat seeks no change to its authorized proceeding. Only parties to the Energy Regulatory Commission’s
maximum daily deliverability or daily proceeding can ask for court review of (Commission) regulations for a
injection rate. Further, Bobcat asks that Commission orders in the proceeding. certificate of public convenience and
the Commission issue requested However, a person does not have to necessity authorizing the construction
authorizations on an expedited basis by intervene in order to have comments and operation of a new compression
March 31, 2008. considered. facility to be located at its East Valley
Questions concerning the application The second way to participate is by Lateral in Pinal County, Arizona. The
should be directed to Paul W. filing with the Secretary of the proposed Picacho Compressor Station
Bieniawski Commission, as soon as possible, an will be comprised of three gas-fired
(pbieniawski@bobcatstorage.com) or original and two copies of comments in reciprocating compressor units totaling
Thomas R. Dill support of or in opposition to this 8,290 horsepower.
(tdill@bobcatstorage.com) at Bobcat Gas project. The Commission will consider El Paso’s proposal is more fully
Storage, 1500 City West Boulevard, these comments in determining the described as set forth in the application
Suite 560, Houston, Texas 77042, or by appropriate action to be taken, but the that is on file with the Commission and
calling (713) 800–3535, Facsimile: (713) filing of a comment alone will not serve open to public inspection. The instant
800–3540 or Lisa M. Tonery to make the filer a party to the filing may be also viewed on the Web
(ltonery@kslaw.com) or Tania S. Perez proceeding. The Commission’s rules at http://www.ferc.gov using the
(tperez@kslaw.com) at King & Spalding require that persons filing comments in ‘‘eLibrary’’ link. Enter the docket
LLP, 1185 Avenue of the Americas, New opposition to the project provide copies number excluding the last three digits in
York, NY 10036 or by calling 212–556– of their protests only to the party or the docket number field to access the
2307, Facsimile: (212) 556–2222. parties directly involved in the protest. document. For assistance, call (866)
Pursuant to section 157.9 of the Comments, protests and interventions 208–3676 or TTY, (202) 502–8659.
Commission’s rules, 18 CFR 157.9, may be filed electronically via the Any questions regarding the
within 90 days of this Notice the Internet in lieu of paper. See 18 CFR application should be directed to:
Commission staff will either: complete 385.2001(a) (1) (iii) and the instructions Richard Derryberry, Director of
its environmental assessment (EA) and on the Commission’s Web site under the Regulatory Affairs, El Paso Natural Gas
place it into the Commission’s public ‘‘e-Filing’’ link at http://www.ferc.gov. Company, P.O. Box 1087, Colorado
record (eLibrary) for this proceeding; or The Commission strongly encourages Springs, Colorado 80944 at (719) 520–
issue a Notice of Schedule for intervenors to file electronically. 3782 or by fax at (719) 667–7534.
Environmental Review. If a Notice of This filing is accessible on-line at Pursuant to section 157.9 of the
Schedule for Environmental Review is http://www.ferc.gov, using the Commission’s rules, 18 CFR 157.9,
issued, it will indicate, among other ‘‘eLibrary’’ link and is available for within 90 days of this Notice the
milestones, the anticipated date for the Commission staff will either: Complete
review in the Commission’s Public
Commission staff’s issuance of the final its environmental assessment (EA) and
Reference Room in Washington, DC.
environmental impact statement (FEIS) place it into the Commission’s public
There is an ‘‘eSubscription’’ link on the
or EA for this proposal. The filing of the record (eLibrary) for this proceeding, or
Web site that enables subscribers to
EA in the Commission’s public record issue a Notice of Schedule for
receive e-mail notification when a
for this proceeding or the issuance of a Environmental Review. If a Notice of
document is added to a subscribed
Notice of Schedule for Environmental Schedule for Environmental Review is
docket(s). For assistance with any FERC
Review will serve to notify federal and issued, it will indicate, among other
Online service, please e-mail:
state agencies of the timing for the milestones, the anticipated date for the
FERCOnlineSupport@ferc.gov, or call
completion of all necessary reviews, and Commission staff’s issuance of the final
(866) 208–3676 (toll free). For TTY, call environmental impact statement (FEIS)
the subsequent need to complete all
(202) 502–8659. or EA for this proposal. The filing of the
federal authorizations within 90 days of
Comment Date: 5 p.m. Eastern Time
the date of issuance of the Commission EA in the Commission’s public record
on October 27, 2007. for this proceeding or the issuance of a
staff’s FEIS or EA.
There are two ways to become Kimberly D. Bose, Notice of Schedule for Environmental
involved in the Commission’s review of Secretary. Review will serve to notify federal and
this project. First, any person wishing to [FR Doc. E7–19592 Filed 10–3–07; 8:45 am] state agencies of the timing for the
obtain legal status by becoming a party BILLING CODE 6717–01–P
completion of all necessary reviews, and
to the proceedings for this project the subsequent need to complete all
should, on or before the comment date, Federal authorizations within 90 days of
file with the Federal Energy Regulatory DEPARTMENT OF ENERGY the date of issuance of the Commission
Commission, 888 First Street, NE., staff’s FEIS or EA.
Washington, DC 20426, a motion to Federal Energy Regulatory There are two ways to become
intervene in accordance with the Commission involved in the Commission’s review of
requirements of the Commission’s Rules this project. First, any person wishing to
[Docket No. CP07–448–000]
of Practice and Procedure (18 CFR obtain legal status by becoming a party
385.214 or 385.211) and the Regulations El Paso Natural Gas Company; Notice to the proceedings for this project
under the NGA (18 CFR 157.10). A should, on or before the below listed
pwalker on PROD1PC71 with NOTICES

of Application
person obtaining party status will be comment date, file with the Federal
placed on the service list maintained by September 27, 2007. Energy Regulatory Commission, 888
the Secretary of the Commission and Take notice that on September 18, First Street, NE., Washington, DC 20426,
will receive copies of all documents 2007, El Paso Natural Gas Company (El a motion to intervene in accordance
filed by the applicant and by all other Paso), Post Office Box 1087, Colorado with the requirements of the

VerDate Aug<31>2005 16:20 Oct 03, 2007 Jkt 214001 PO 00000 Frm 00014 Fmt 4703 Sfmt 4703 E:\FR\FM\04OCN1.SGM 04OCN1
56732 Federal Register / Vol. 72, No. 192 / Thursday, October 4, 2007 / Notices

Commission’s Rules of Practice and Comment Date: October 24, 2007. 157.205 of the Commission’s
Procedure (18 CFR 385.214 or 385.211) Regulations under the NGA (18 CFR
Kimberly D. Bose,
and the Regulations under the NGA (18 157.205) a protest to the request. If no
Secretary. protest is filed within the time allowed
CFR 157.10). A person obtaining party
[FR Doc. E7–19588 Filed 10–3–07; 8:45 am] therefore, the proposed activity shall be
status will be placed on the service list
maintained by the Secretary of the BILLING CODE 6717–01–P deemed to be authorized effective the
Commission and will receive copies of day after the time allowed for protest.
all documents filed by the applicant and If a protest is filed and not withdrawn
DEPARTMENT OF ENERGY within 30 days, the time allowed for the
by all other parties. A party must submit
14 copies of filings made with the resolution of issues raised in the protest,
Federal Energy Regulatory
then this prior notice request shall be
Commission and must mail a copy to Commission
treated as an application for
the applicant and to every other party in [Docket No. CP07–450–000] authorization pursuant to section 7 of
the proceeding. Only parties to the
the NGA (18 CFR 157.205(f)).
proceeding can ask for court review of MoGas Pipeline LLC; Notice of The Commission strongly encourages
Commission orders in the proceeding. Request Under Blanket Authorization electronic filings of comments, protests,
However, a person does not have to September 27, 2007. and interventions via the Internet in lieu
intervene in order to have comments Take notice that on September 21, of paper; see 18 CFR 385.2001(a)(1)(iii)
considered. The second way to 2007, MoGas Pipeline LLC (MoGas), 110 and the instructions on the
participate is by filing with the Algana Court, St. Peters, Missouri, Commission’s Web site (http://
Secretary of the Commission, as soon as 63386, filed in Docket No. CP07–450– www.ferc.gov) under the ‘‘e-Filing’’ link.
possible, an original and two copies of 000, a prior notice request pursuant to Kimberly D. Bose,
comments in support of or in opposition sections 157.205 and 157.210 of the Secretary.
to this project. The Commission will Commission’s regulations under the [FR Doc. E7–19589 Filed 10–3–07; 8:45 am]
consider these comments in Natural Gas Act (NGA) for authorization BILLING CODE 6717–01–P
determining the appropriate action to be to construct and operate certain natural
taken, but the filing of a comment alone gas pipeline facilities, all as more fully
will not serve to make the filer a party set forth in the application, which is on DEPARTMENT OF ENERGY
to the proceeding. The Commission’s file with the Commission and open to
rules require that persons filing public inspection. The filing may also Federal Energy Regulatory
comments in opposition to the project be viewed on the Web at http:// Commission
provide copies of their protests only to www.ferc.gov using the ‘‘eLibrary’’ link.
[Docket No. PR07–19–000]
the party or parties directly involved in Enter the docket number excluding the
the protest. last three digits in the docket number National Fuel Gas Distribution
field to access the document. For Corporation; Notice of Petition for Rate
Persons who wish to comment only assistance, contact FERC at
on the environmental review of this Approval
FERCOnlineSupport@ferc.gov or call
project should submit an original and toll-free, (886) 208–3676 or TYY, (202) September 27, 2007.
two copies of their comments to the 502–8659. Take notice that on September 20,
Secretary of the Commission. MoGas proposes to construct and 2007, National Fuel Gas Distribution
Environmental commenters will be operate a 4,920 horsepower mainline Corporation (Distribution) filed a
placed on the Commission’s natural gas compressor station in Pike petition for NGPA section 311 to amend
environmental mailing list, will receive County, Missouri at its interconnection the transportation rate currently in
copies of the environmental documents, with the Panhandle Eastern Pipe Line effect, pursuant to section 284.123(b)(2)
and will be notified of meetings Company. MoGas states that the of the Commission’s regulations.
associated with the Commission’s proposed facilities are designed to Distribution requests that the
environmental review process. increase the capacity on its pipeline Commission approve: (1) The reduction
Environmental commenters will not be system by 100,804 Dth per day. MoGas in maximum transportation rate for
required to serve copies of filed states that the estimated cost of the transportation provided in New York
documents on all other parties. proposed facilities is $6,580,000. MoGas from currently effective $0.6725 per Mcf
However, the non-party commenters also says that earlier in the year, it to $0.5784 per Mcf; (2) the reduction in
will not receive copies of all documents conducted an open season for the maximum transportation rate, for
filed by other parties or issued by the capacity created by this project and that transportation provided in
Commission (except for the mailing of the project is supported by precedent Pennsylvania, from currently effective
environmental documents issued by the agreements covering all of the capacity $0.4655 per Mcf to $0.3590 per Mcf; and
Commission) and will not have the right initially created by the project. (3) the same currently effective
Any questions regarding the minimum transportation rate of $0.10
to seek court review of the
application should be directed to David per Mcf for transportation provided in
Commission’s final order.
J. Ries, President, MoGas Pipeline LLC, New York and Pennsylvania, pursuant
Motions to intervene, protests and 10 Algana Court, St. Peters, Missouri to NGPA section 311.
comments may be filed electronically 63386, phone (636) 926–3668. Any person desiring to participate in
via the Internet in lieu of paper; see, 18 Any person or the Commission’s Staff this rate proceeding must file a motion
CFR 385.2001(a)(1)(iii) and the may, within 60 days after the issuance to intervene or to protest this filing must
pwalker on PROD1PC71 with NOTICES

instructions on the Commission’s Web of the instant notice by the Commission, file in accordance with Rules 211 and
site under the ‘‘e-Filing’’ link. The file pursuant to Rule 214 of the 214 of the Commission’s Rules of
Commission strongly encourages Commission’s Procedural Rules (18 CFR Practice and Procedure (18 CFR 385.211
electronic filings. 385.214) a motion to intervene or notice and 385.214). Protests will be
of intervention and, pursuant to section considered by the Commission in

VerDate Aug<31>2005 16:20 Oct 03, 2007 Jkt 214001 PO 00000 Frm 00015 Fmt 4703 Sfmt 4703 E:\FR\FM\04OCN1.SGM 04OCN1