Federal Register / Vol. 72, No.

186 / Wednesday, September 26, 2007 / Notices 54691

Estimated No. of Respondents/ FCU makes payments to its director in reducing the overall concentration of
Recordkeepers: 5,732. within the guidelines that the FCU has formaldehyde, but additional purging is
Estimated Burden Hours Per established in advance and to enable still necessary to allow required
Response: 46.15 hours. examiners to easily verify compliance containment entries. The licensee has
Frequency of Response: by comparing the policy to the actual identified three potential sources of the
Recordkeeping. Reporting. On Occasion. reimbursements. formaldehyde, but positive
Quarterly. Respondents: All federal credit identification and corrective action
Estimated Total Annual Burden unions. cannot be completed with the plant in
Hours: 264,529 hours. Estimated No. of Respondents/ operation. The limit on purge hours has
Estimated Total Annual Cost: None. Recordkeepers: 5,732. been in effect since 1982 and typically
By the National Credit Union Estimated Burden Hours per has not been exceeded. However, based
Administration Board September 20, 2007. Response: .50 hours. on the current need for purging, the
Mary Rupp, Frequency of Response: Other. Once licensee projects that the 1000-hour
Secretary of the Board. and update. limit will be exceeded around October
Estimated Total Annual Burden 15, 2007. Approval of the increase in
[FR Doc. E7–18999 Filed 9–25–07; 8:45 am]
Hours: 2879.50. containment purge hours will avoid an
BILLING CODE 7535–01–P
Estimated Total Annual Cost: None. unnecessary unit shutdown and allow
By the National Credit Union the licensee to perform detailed leak
NATIONAL CREDIT UNION Administration Board on September 20, identification and corrective action in
ADMINISTRATION 2007. the spring 2008 refueling outage. Based
Mary Rupp, on the preceding discussion, the
Agency Information Collection Secretary of the Board. Commission concludes that exigent
Activities: Submission to OMB for [FR Doc. E7–19001 Filed 9–25–07; 8:45 am] circumstances exist.
Extension of a Currently Approved BILLING CODE 7535–01–P
Before issuance of the proposed
Collection; Comment Request license amendment, the Commission
will have made findings required by the
AGENCY: National Credit Union Atomic Energy Act of 1954, as amended
Administration (NCUA). NUCLEAR REGULATORY
(the Act) and the Commission’s
ACTION: Request for comment.
COMMISSION
regulations.
[Docket No. 50–328] Pursuant to Title 10 of the Code of
SUMMARY: The NCUA intends to submit Federal Regulations (10 CFR) 50.91(a)(6)
the following information collection to Tennessee Valley Authority; Notice of for amendments to be granted under
the Office of Management and Budget Consideration of Issuance of exigent circumstances, the NRC staff
(OMB) for review and clearance under Amendment to Facility Operating must determine that the amendment
the Paperwork Reduction Act of 1995 License, Proposed No Significant request involves no significant hazards
(Pub. L. 104–13, 44 U.S.C. Chapter 35). Hazards Consideration Determination, consideration. Under the Commission’s
This information collection is published and Opportunity for a Hearing regulations in 10 CFR 50.92, this means
to obtain comments from the public. that operation of the facility in
DATES: Comments will be accepted until
The U.S. Nuclear Regulatory
Commission (the Commission) is accordance with the proposed
October 29, 2007. amendment would not (1) Involve a
considering issuance of an amendment
ADDRESSES: Interested parties are significant increase in the probability or
to Facility Operating License No. 50–
invited to submit written comments to 328, issued to the Tennessee Valley consequences of an accident previously
the NCUA Clearance Officer: Authority (TVA, the licensee), for evaluated; or (2) create the possibility of
Clearance Officer: Mr. Neil operation of the Sequoyah Nuclear a new or different kind of accident from
McNamara, National Credit Union Plant, Unit No. 2, located in Hamilton any accident previously evaluated; or
Administration, 1775 Duke Street, County, Tennessee. (3) involve a significant reduction in a
Alexandria, Virginia 22314–3428, Fax The proposed amendment would margin of safety. As required by 10 CFR
No. 703–837–2861. E-mail: incorporate a one-time change to 50.91(a), the licensee has provided its
ociomail@ncua.gov. technical specification Limiting analysis of the issue of no significant
FOR FURTHER INFORMATION CONTACT: Condition for Operation 3.6.1.9 to allow hazards consideration, which is
Requests for additional information or a an increase to the annual limit for presented below:
copy of the information collection operation of the containment ventilation 1. The proposed amendment does not
request should be directed to Tracy system with purge isolation valves open involve a significant increase in the
Sumpter at the National Credit Union from 1000 hours to 1400 hours during probability or consequences of an accident
Administration, 1775 Duke Street, previously evaluated.
calendar year 2007.
TVA’s proposed change is not considered
Alexandria, VA 22314–3428, or at (703) The licensee has been experiencing an to be a significant departure from the current
518–6444. accumulation of gaseous formaldehyde requirements. The containment purge and
SUPPLEMENTARY INFORMATION: Proposal in the containment atmosphere, which ventilation system is qualified and designed
for the following collection of has necessitated more than normal to isolate in the event of a design basis
information: purging in order to provide protection accident. The probability of occurrence of an
Title: Written Reimbursement Policy. for personnel entering the containment accident is not increased as the increase in
OMB Number: 3133–0130. to perform maintenance or surveillance purge/ventilation system operation does not
mstockstill on PROD1PC66 with NOTICES

activities during operation. This affect the system’s capability for purge valve
Form Number: None. closure or containment isolation. The
Type of Review: Extension of a increase in gaseous formaldehyde began increase in system operation for the
currently approved collection. during 2007. The licensee has installed remainder of calendar year 2007 would
Description: Each Federal Credit High-Efficiency Particulate Air and continue to be governed by the limits of 10
Union (FCU) must draft a written charcoal filters in the upper CFR 20. In addition, purge system isolation
reimbursement policy to ensure that the containment, which has been effective capability remains unchanged. Consequently,

VerDate Aug<31>2005 17:57 Sep 25, 2007 Jkt 211001 PO 00000 Frm 00053 Fmt 4703 Sfmt 4703 E:\FR\FM\26SEN1.SGM 26SEN1
54692 Federal Register / Vol. 72, No. 186 / Wednesday, September 26, 2007 / Notices

the 10 CFR 100 limits for site boundary dose Written comments may be submitted should specifically explain the reasons
would not be exceeded in the event of an by mail to the Chief, Rulemaking, why intervention should be permitted
accident during containment purge Directives and Editing Branch, Division with particular reference to the
operation. Therefore, the proposed
of Administrative Services, Office of following general requirements: (1) The
amendment does not involve a significant
increase in the probability or consequences Administration, U.S. Nuclear Regulatory name, address and telephone number of
of an accident previously evaluated. Commission, Washington, DC 20555– the requestor or petitioner; (2) the
2. The proposed amendment does not 0001, and should cite the publication nature of the requestor’s/petitioner’s
create the possibility of a new or different date and page number of this Federal right under the Act to be made a party
kind of accident from any accident Register notice. Written comments may to the proceeding; (3) the nature and
previously evaluated. also be delivered to Room 6D59, Two extent of the requestor’s/petitioner’s
The possibility for a new or different kind White Flint North, 11545 Rockville property, financial, or other interest in
of accident from any accident previously Pike, Rockville, Maryland, from 7:30 the proceeding; and (4) the possible
evaluated does not exist as a result of the
a.m. to 4:15 p.m. Federal workdays. effect of any decision or order which
proposed increase in purge/ventilation
system operation time. The system design Documents may be examined, and/or may be entered in the proceeding on the
remains unchanged for performing isolation copied for a fee, at the NRC’s Public requestor’s/petitioner’s interest. The
of containment for accident mitigation and Document Room, located at One White petition must also identify the specific
does not create the possibility of a new or Flint North, Public File Area O1 F21, contentions which the petitioner/
different kind of accident from any accident 11555 Rockville Pike (first floor), requestor seeks to have litigated at the
previously evaluated. Rockville, Maryland. proceeding.
3. The proposed amendment does not The filing of requests for hearing and Each contention must consist of a
involve a significant reduction in a margin of petitions for leave to intervene is specific statement of the issue of law or
safety. discussed below. fact to be raised or controverted. In
The proposed increase in purge system Within 60 days after the date of
operation is an increase that does not affect
addition, the petitioner/requestor shall
existing safety margins. Additional purge
publication of this notice, the licensee provide a brief explanation of the bases
operation time will also continue to comply may file a request for a hearing with for the contention and a concise
with effluent release limits in 10 CFR 20. In respect to issuance of the amendment to statement of the alleged facts or expert
addition, the proposed change does not the subject facility operating license and opinion which support the contention
increase the risk for an accident because no any person whose interest may be and on which the petitioner intends to
physical changes to the plant are being made affected by this proceeding and who rely in proving the contention at the
and design features associated with purge wishes to participate as a party in the hearing. The petitioner/requestor must
system isolation remain unchanged. proceeding must file a written request also provide references to those specific
Accordingly, TVA concludes that the margin for a hearing and a petition for leave to
of safety has not been reduced.
sources and documents of which the
intervene. Requests for a hearing and a petitioner/requestor is aware and on
The NRC staff has reviewed the petition for leave to intervene shall be which the petitioner/requestor intends
licensee’s analysis and, based on this filed in accordance with the to rely to establish those facts or expert
review, it appears that the three Commission’s ‘‘Rules of Practice for opinion. The petitioner/requestor must
standards of 10 CFR 50.92(c) are Domestic Licensing Proceedings and provide sufficient information to show
satisfied. Therefore, the NRC staff Issuance of Orders’’ in 10 CFR Part 2. that a genuine dispute exists with the
proposes to determine that the Interested persons should consult a applicant on a material issue of law or
amendment request involves no current copy of 10 CFR 2.309, which is fact. Contentions shall be limited to
significant hazards consideration. available at the Commission’s PDR, matters within the scope of the
The Commission is seeking public located at One White Flint North, Public amendment under consideration. The
comments on this proposed File Area O1 F21, 11555 Rockville Pike contention must be one which, if
determination. Any comments received (first floor), Rockville, Maryland. proven, would entitle the petitioner/
within 14 days after the date of Publicly available records will be requestor to relief. A petitioner/
publication of this notice will be accessible from the Agencywide requestor who fails to satisfy these
considered in making any final Documents Access and Management requirements with respect to at least one
determination. System’s (ADAMS) Public Electronic contention will not be permitted to
Normally, the Commission will not Reading Room on the Internet at the participate as a party.
issue the amendment until the NRC Web site, http://www.nrc.gov/ Those permitted to intervene become
expiration of the 14-day notice period. reading-rm/doc-collections/cfr/. If a parties to the proceeding, subject to any
However, should circumstances change request for a hearing or petition for limitations in the order granting leave to
during the notice period, such that leave to intervene is filed by the above intervene, and have the opportunity to
failure to act in a timely way would date, the Commission or a presiding participate fully in the conduct of the
result, for example, in derating or officer designated by the Commission or hearing.
shutdown of the facility, the by the Chief Administrative Judge of the If a hearing is requested, the
Commission may issue the license Atomic Safety and Licensing Board Commission will make a final
amendment before the expiration of the Panel, will rule on the request and/or determination on the issue of no
14-day notice period, provided that its petition; and the Secretary or the Chief significant hazards consideration. The
final determination is that the Administrative Judge of the Atomic final determination will serve to decide
amendment involves no significant Safety and Licensing Board will issue a when the hearing is held. If the final
hazards consideration. The final notice of a hearing or an appropriate determination is that the amendment
determination will consider all public order. request involves no significant hazards
mstockstill on PROD1PC66 with NOTICES

and State comments received. Should As required by 10 CFR 2.309, a consideration, the Commission may
the Commission take this action, it will petition for leave to intervene shall set issue the amendment and make it
publish in the Federal Register a notice forth with particularity the interest of immediately effective, notwithstanding
of issuance. The Commission expects the petitioner in the proceeding, and the request for a hearing. Any hearing
that the need to take this action will how that interest may be affected by the held would take place after issuance of
occur very infrequently. results of the proceeding. The petition the amendment. If the final

VerDate Aug<31>2005 17:57 Sep 25, 2007 Jkt 211001 PO 00000 Frm 00054 Fmt 4703 Sfmt 4703 E:\FR\FM\26SEN1.SGM 26SEN1
Federal Register / Vol. 72, No. 186 / Wednesday, September 26, 2007 / Notices 54693

determination is that the amendment documents located in ADAMS should adjustments to the agenda to facilitate
request involves a significant hazards contact the NRC PDR Reference staff by the conduct of the meeting. The
consideration, any hearing held would telephone at 1 (800) 397–4209 or (301) Chairman of the Committee is
take place before the issuance of any 415–4737, or by e-mail to pdr@nrc.gov. empowered to make such adjustments
amendment. Dated at Rockville, Maryland, this 20th day to conduct the meeting in a manner that,
Nontimely requests and/or petitions of September 2007. in his judgment, will facilitate the
and contentions will not be entertained For the Nuclear Regulatory Commission. orderly conduct of business, including
absent a determination by the Brendan T. Moroney, making provisions to continue the
Commission or the presiding officer of discussion of matters not completed on
Project Manager, Plant Licensing Branch II–
the Atomic Safety and Licensing Board 2, Division of Operating Reactor Licensing, the scheduled day on another day of the
that the petition, request and/or the Office of Nuclear Reactor Regulation. same meeting. Persons planning to
contentions should be granted based on [FR Doc. E7–19008 Filed 9–25–07; 8:45 am] attend a meeting may contact the
a balancing of the factors specified in 10 Designated Federal Officer (DFO)
BILLING CODE 7590–01–P
CFR 2.309(c)(1)(i)–(viii). specified in the Federal Register Notice
A request for a hearing or a petition prior to the meeting to be advised of any
for leave to intervene must be filed by: NUCLEAR REGULATORY changes to the agenda that may have
(1) First class mail addressed to the COMMISSION occurred.
Office of the Secretary of the The following requirements shall
Commission, U.S. Nuclear Regulatory Advisory Committee on Nuclear Waste apply to public participation in
Commission, Washington, DC 20555– and Materials (ACNW&M); Procedures ACNW&M meetings:
0001, Attention: Rulemaking and for Meetings (a) Persons who plan to submit
Adjudications Staff; (2) courier, express written comments at the meeting should
mail, and expedited delivery services: Background provide 35 copies to the DFO at the
Office of the Secretary, Sixteenth Floor, This notice describes procedures to be beginning of the meeting. Persons who
One White Flint North, 11555 Rockville followed with respect to meetings cannot attend the meeting, but wish to
Pike, Rockville, Maryland, 20852, conducted pursuant to the Federal submit written comments regarding the
Attention: Rulemaking and Advisory Committee Act (FACA) by the agenda items may do so by sending a
Adjudications Staff; (3) E-mail U.S. Nuclear Regulatory Commission’s readily reproducible copy addressed to
addressed to the Office of the Secretary, (NRC’s) Advisory Committee on Nuclear the DFO specified in the Federal
U.S. Nuclear Regulatory Commission, Waste and Materials (ACNW&M). These Register Notice, care of the Advisory
HEARINGDOCKET@NRC.GOV; or (4) procedures are set forth so that they may Committee on Nuclear Waste and
facsimile transmission addressed to the be incorporated by reference in future Materials, U.S. Nuclear Regulatory
Office of the Secretary, U.S. Nuclear notices for individual meetings. Commission, Washington, DC 20555–
Regulatory Commission, Washington, The ACNW&M meetings are 0001. Comments should be in the
DC, Attention: Rulemakings and conducted in accordance with FACA. possession of the DFO prior to the
Adjudications Staff at (301) 415–1101, The ACNW&M advises the NRC on meeting to allow time for reproduction
verification number is (301) 415–1966. technical issues related to nuclear and distribution. Comments should be
A copy of the request for hearing and materials and waste management. The limited to topics being considered by
petition for leave to intervene should bases of ACNW&M reviews include 10 the Committee.
also be sent to the Office of the General CFR Parts 20, 60, 61, 63, 70, 71, and 72 (b) Persons desiring to make oral
Counsel, U.S. Nuclear Regulatory and other applicable regulations and statements at the meeting should make
Commission, Washington, DC 20555– legislative mandates, such as the a request to do so to the DFO; if
0001, and it is requested that copies be Nuclear Waste Policy Act as amended, possible, the request should be made 5
transmitted either by means of facsimile the Low-Level Radioactive Waste Policy days before the meeting, identifying the
transmission to (301) 415–3725 or by e- Act as amended, and the Uranium Mill topic(s) to be discussed and the amount
mail to OGCMailCenter@nrc.gov. A copy Tailings Radiation Control Act as of time needed for presentation so that
of the request for hearing and petition amended. The Committee’s reports orderly arrangements can be made. The
for leave to intervene should also be become a part of the public record. Committee will hear oral statements on
sent to General Counsel, Tennessee The ACNW&M meetings are normally topics being reviewed at an appropriate
Valley Authority, 400 West Summit Hill open to the public and provide time during the meeting as scheduled by
Drive, ET 11A, Knoxville, Tennessee opportunities for oral or written the Chairman.
37902, attorney for the licensee. statements from members of the public (c) Information regarding topics to be
For further details with respect to this to be considered as part of the discussed, changes to the agenda,
action, see the application for Committee’s information gathering whether the meeting has been canceled
amendment dated September 17, 2007, process. The meetings are not or rescheduled, and the time allotted to
which is available for public inspection adjudicatory hearings such as those present oral statements can be obtained
at the Commission’s Public Document conducted by the NRC’s Atomic Safety by contacting the DFO.
Room (PDR), located at One White Flint and Licensing Board Panel as part of the (d) The use of still, motion picture,
North, Public File Area O1 F21, 11555 Commission’s licensing process. and television cameras may be limited
Rockville Pike (first floor), Rockville, ACNW&M meetings are conducted in to selected portions of the meeting as
Maryland. Publicly available records accordance with the FACA. determined by the Chairman and subject
will be accessible electronically from to the condition that the use of such
the Agencywide Documents Access and General Rules Regarding ACNW&M equipment will not interfere with the
mstockstill on PROD1PC66 with NOTICES

Management System’s (ADAMS) Public Meetings conduct of the meeting. The DFO will
Electronic Reading Room on the Internet An agenda is published in the Federal have to be notified prior to the meeting
at the NRC Web site http://www.nrc.gov/ Register for each Full Committee and will authorize the installation or
reading-rm.html. Persons who do not meeting and is available on the Internet use of such equipment after
have access to ADAMS or who at http://www.nrc.gov/ACRSACNW. consultation with the Chairman. The
encounter problems in accessing the There may be a need to make use of such equipment will be restricted

VerDate Aug<31>2005 17:57 Sep 25, 2007 Jkt 211001 PO 00000 Frm 00055 Fmt 4703 Sfmt 4703 E:\FR\FM\26SEN1.SGM 26SEN1

You might also like