Federal Register / Vol. 72, No.

176 / Wednesday, September 12, 2007 / Notices 52093

Practice and Procedure. 18 CFR 385.211, Utilities requested that the Commission ‘‘e-Filing’’ link. The Commission
385.214 (2004). grant blanket approval under 18 CFR strongly encourages electronic filings.
Notice is hereby given that the part 34 of all future issuances of Kimberly D. Bose,
deadline for filing protests is September securities and assumptions of liability
20, 2007. Secretary.
by Columbia Utilities.
Absent a request to be heard in [FR Doc. E7–17927 Filed 9–11–07; 8:45 am]
On August 30, 2007, pursuant to
opposition to such blanket approvals by BILLING CODE 6717–01–P
delegated authority, the Director,
the deadline above, Chandler is
Division of Tariffs and Market
authorized to issue securities and
assume obligations or liabilities as a Development-West, granted the requests DEPARTMENT OF ENERGY
guarantor, indorser, surety, or otherwise for blanket approval under part 34
(Director’s Order). The Director’s Order Federal Energy Regulatory
in respect of any security of another
also stated that the Commission would Commission
person; provided that such issuance or
assumption is for some lawful object publish a separate notice in the Federal [Docket No. EL07–83–000]
within the corporate purposes of Register establishing a period of time for
Chandler, compatible with the public the filing of protests. Accordingly, any Electric Transmission Texas, LLC;
interest, and is reasonably necessary or person desiring to be heard concerning Notice of Compliance Filing
appropriate for such purposes. the blanket approvals of issuances of
September 6, 2007.
The Commission reserves the right to securities or assumptions of liability by
Take notice that on September 4,
require a further showing that neither Columbia Utilities, should file a protest
2007, Electric Transmission Texas, LLC,
public nor private interests will be with the Federal Energy Regulatory
tendered for filing a supplement to it
adversely affected by continued Commission, 888 First Street, NE., July 19, 2007 filing, to respond to
approvals of Chandler’s issuance of Washington, DC 20426, in accordance informal inquiries from the
securities or assumptions of liability. with Rules 211 and 214 of the Commission’s advisory staff concerning
Copies of the full text of the Director’s Commission’s Rules of Practice and the AEP Texas Central Company’s
Order are available from the Procedure. 18 CFR 385.211, 385.214 Laredo interconnection with CFE.
Commission’s Public Reference Room, (2004). Any person desiring to intervene or to
888 First Street, NE., Washington, DC Notice is hereby given that the protest this filing must file in
20426. The Order may also be viewed deadline for filing protests is October 1, accordance with Rules 211 and 214 of
on the Commission’s Web site at the Commission’s Rules of Practice and
2007.
http://www.ferc.gov, using the eLibrary Procedure (18 CFR 385.211, 385.214).
link. Enter the docket number excluding Absent a request to be heard in
Protests will be considered by the
the last three digits in the docket opposition to such blanket approvals by
Commission in determining the
number filed to access the document. the deadline above, Columbia Utilities
appropriate action to be taken, but will
Comments, protests, and interventions is authorized to issue securities and
not serve to make protestants parties to
may be filed electronically via the assume obligations or liabilities as a the proceeding. Any person wishing to
Internet in lieu of paper. See, 18 CFR guarantor, indorser, surety, or otherwise become a party must file a notice of
385.2001(a)(1)(iii) and the instructions in respect of any security of another intervention or motion to intervene, as
on the Commission’s Web site under the person; provided that such issuance or appropriate. Such notices, motions, or
‘‘e-Filing’’ link. The Commission assumption is for some lawful object protests must be filed on or before the
strongly encourages electronic filings. within the corporate purposes of comment date. Anyone filing a motion
Kimberly D. Bose,
Columbia Utilities, compatible with the to intervene or protest must serve a copy
public interest, and is reasonably of that document on the Applicant and
Secretary.
necessary or appropriate for such all the parties in this proceeding.
[FR Doc. E7–17965 Filed 9–11–07; 8:45 am]
purposes. The Commission encourages
BILLING CODE 6717–01–P
The Commission reserves the right to electronic submission of protests and
require a further showing that neither interventions in lieu of paper using the
DEPARTMENT OF ENERGY public nor private interests will be ‘‘eFiling’’ link at http://www.ferc.gov.
adversely affected by continued Persons unable to file electronically
Federal Energy Regulatory approvals of Columbia Utilities’ should submit an original and 14 copies
Commission issuance of securities or assumptions of of the protest or intervention to the
liability. Federal Energy Regulatory Commission,
[Docket Nos. ER07–939–000; ER07–939–
888 First Street, NE., Washington, DC
001] Copies of the full text of the Director’s 20426.
Order are available from the This filing is accessible on-line at
Columbia Utilities Power, LLC; Notice Commission’s Public Reference Room,
of Issuance of Order http://www.ferc.gov, using the
888 First Street, NE., Washington, DC ‘‘eLibrary’’ link and is available for
August 31, 2007. 20426. The Order may also be viewed review in the Commission’s Public
Columbia Utilities Power, LLC on the Commission’s Web site at Reference Room in Washington, DC.
(Columbia Utilities) filed an application http://www.ferc.gov, using the eLibrary There is an ‘‘eSubscription’’ link on the
for market-based rate authority, with an link. Enter the docket number excluding Web site that enables subscribers to
accompanying rate schedule. The the last three digits in the docket receive e-mail notification when a
proposed market-based rate schedule number filed to access the document. document is added to a subscribed
jlentini on PROD1PC65 with NOTICES

provides for the sale of energy and Comments, protests, and interventions docket(s). For assistance with any FERC
capacity at market-based rates. may be filed electronically via the Online service, please e-mail
Columbia Utilities also requested internet in lieu of paper. See, 18 CFR FERCOnlineSupport@ferc.gov, or call
waivers of various Commission 385.2001(a)(1)(iii) and the instructions (866) 208–3676 (toll free). For TTY, call
regulations. In particular, Columbia on the Commission’s Web site under the (202) 502–8659.

VerDate Aug<31>2005 18:43 Sep 11, 2007 Jkt 211001 PO 00000 Frm 00049 Fmt 4703 Sfmt 4703 E:\FR\FM\12SEN1.SGM 12SEN1