IADC/SPE 14777
Liner Cementing Techniques and Case Histories Offshore
Western Gulf of Mexico
by R.N. Hebert, Tenneco Oil Co. E&P
SPE Member
ABSTRACT
2)
3)
4)
5)
6)
Close tolerances between pipe and hole sizes inability to use centralizers.
Inability to move pipe while cementing.
Restricted circulation rates - lost circulation.
Insufficient cement volumes.
Cement contamination.
Over retardation of cement - gas migration
through cement.
2)
3)
LINER CEMENTING TECHNIQUES AND CASE HISTORIES OFFSHORE WESTERN GULF OF MEXICO
SPE 14777
RECOftfo1ENDATIONS
The following paragraphs deal with specific
types of equipment and cement blends used during the
period in which these liners were run.
RESULTS
Results of the 23 1i ners run in thi s survey are
summarized in Table 1. The sizes of casing run ranged
from 5-1/2" to 9-5/8". The length of the liners
ranged from 900 to 3600 feet. Of the 23 1i ners run,
14 were run in directional wells.
Only the 7" X
9-5/8" 1i ners were run wi th central i zers. All 1i ner
434
Liner equi pment used on 22 of 23 1i ners consisted of a mechanical set liner hanger with a
ri ght-hand set and release mechan ism. The 1i ner
hangers had honed ins ide diameters and doub 1ed as
polished bore receptacles for the retrievable
pack-off bushi ngs. A 10 foot long tieback sleeve
with right hand release setting collar was run with
SPE 14777
R. N. HEBERT
2.
2)
3.
4.
5.
Liner overlap (top job) - (recommended length 400 feet, minimum - 200 feet) - no less than 50
bbls. of cement for 5-1/2" and smaller liners,
70-80 bbls. for 7" to 7-5/8" liners and 80-90
bbls.for 9-5/8" liners.
435
The purpose of th is paper was to share i nformation and ideas with the industry. Other operators
and turn-key drilling contractors have been using
this method of liner cementing for years to save
time and money. Although this method has improved
liner cementing success, it has not been 100%
successful. Tenneco will continue to look at this
LINER CEMENTING TECHNIQUES AND CASE HISTORIES OFFSHORE WESTERN GULF OF MEXICO
SPECIAL EQUIPMENT
Extra equipment needed for this method are
below and illustrated in Figures 2 and 3:
1)
2)
3)
lis~ed
PROCEDURE
Picking Up and Running Liner:
1.
2.
3.
4.
5.
6.
7.
S.
9.
436
SPE 14777
~S~PE~1~47~7~7____________________________~R~.~N~.rH~EB~E~RTL-________________________________~5
19.
20.
21.
22.
23.
24.
25.
26.
27.
Pullout of hole.
Dri 11 cement to 1 i ner top
and test.
Dri 11 out cement plugs and test
shoe.
ACKNOWLEDGEMENTS
This paper is dedicated to the memory of Dennis
Hebert, former employee of Brown Oil Tools Inc., who
spent 27 years of his life serving the oil industry
in the liner business.
He is sadly missed by
family, friends, and colleagues.
The author wi shes to extend speci a 1 thanks to
Jerry Anderson of Mobil Oi 1 Company for his advi ce
and he 1p when thi s method of 1 i ner cement i ng was
undertaken by the Western Gulf Division of Tenneco.
METRIC CONVERSIONS
1 inch (in.) = 2.54 E-02 meter (m)
1 foot (ft.) = 3.048 E-01 m
1 ft./min = 5.080 E-03 m/s
2
1 1b./in. (psi) = 6.894 757 E+03 pascal (Pa)
1 1bfgal. jppg) = 1.198 264 E+02 kilogram
meter (kg/m)
3
1 barrel (bbl.) = 1.589 873 E-01 m
per
REFERENCES
1Lindsey, H.E. and Bateman, S.J., "Improve Cementing
of Drilling Liners in Deep Wells", World Oil,
October 1983.
2Agnew, J.W. and Klein, R.S., "The Leaking Liner
Top", SPE 12614, SPE Deep Dri 11 i ng and Production Symposium, Amarillo, Texas, April 1984.
3Lindsey, H.E., "Liner Cementing Equipment and
Techniques", 24th Annual Meeting of the Southwestern Petroleum Short Course, Texas Tech
University, Lubbock, Texas, April 1977.
4Steh1e, D.E., Sabins, F., Gibson, J., Theis, K.,
Venoitto, J.J., "Conoco Stops Annular Gas Flow
with Special Cement", Petroleum Engineer, April
1985.
5Lindsey, H.E. and Durham, K.S., "Field Results of
Liner Rotation During Cementing", SPE 13047,
59th Annual Technical Conference and Exhibition, Houston, Texas, September 1984.
437
SPE
...ill.,l
MUSTANG ISLAND
9-5/8 X 11-7/8
2500
AREA
LENGTH
DEVIATION
(DEGREES)
DRLG. OR
PROD. LNR
TOP
TEST
SHOE
TEST
20
Drl g.
Yes
Yes
BOND LOG
RESULTS
REMARKS
N/A
HIGH ISLAND
9-5/8 X 11-7/8
2000
25
Drlg.
Yes
No
N/A
MUSTANG ISLAND
9-5/8 X 11-7/8
2400
20
Drlg.
No
Yes
N/A
WEST CAMERON
9-5/8 X 11-7/8
1100
16
Drlg.
Yes
Yes
N/A
MUSTANG ISLAND
9-5/8 X 11-7/8
2400
SH
Drl g.
Ves
Ves
N/A
HIGH ISLAND
9-5/8 X 11-7/8
2200
SH
Drlg.
Yes
Yes
N/A
MUSTANG ISLAND
9-5/8 X 11-7/8
3000
40
Drlg.
No
Yes
N/A
MUSTANG ISLAND
7-5/8 X 9-5/8
3500
25
Drlg.
Yes
Yes
N/A
MUSTANG ISLAND
7-5/8 X 9-5/8
2500
20
Drlg.
Yes
Yes
N/A
HIGH ISLAND
7-3/4 X 9-5/8
1000
25
Drlg.
Yes
Yes
N/A
MUSTANG ISLAND
7-5/8 X 9-5/8
3100
30
Drlg.
No
Yes
N/A
WEST CAMERON
7-5/8 X 9-5/8
2800
16
Prod.
Ves
N/A
Good
MUSTANG ISLAND
7-5/8 X 9-5/8
3000
SH
Drlg.
Yes
Yes
No
HIGH ISLAND
7-5/8 X 9-5/8
1300
SH
Drlg.
Ves
Yes
N/A
MUSTANG ISLAND
7-5/8 X 9-5/8
3400
SH
Orlg.
Ves
Yes
N/A
WEST CAMERON
7-5/8 X 9-5/8
900
SH
Both
Ves
Yes
Good
Cement failure.
Block squeeze I iner for DST.
SABINE PASS
7-5/8 X 9-5/8
900
SH
Drlg.
Yes
No
N/A
I nsuf. vo I. pumped.
MUSTANG ISLAND
7" X 9-5/8
3600
25
Prod.
Ves
N/A
N/R
Waiting on completion.
MUSTANG ISLAND
7" X 9-5/8
2000
40
Both
Yes
Ves
No
Lost circulation.
HIGH ISLAND
7" X 9-5/8
1500
50
Prod.
Ves
N/A
N/R
Waiting on completion.
MUSTANG ISLAND
5-1/2 X 7-5/8
2200
SH
Prod.
Ves
N/A
Good
HIGH ISLAND
5-1/2 X 7-5/8
1900
SH
Prod.
Ves
N/A
N/R
MUSTANG ISLAND
5-1/2 X 7-5/8
2100
25
Prod.
Ves
N/A
N/R
Waiting on completion.
14 7Z 7
SPE
" 1'\
2DDD-
3DDD4DDD-
Ji
"\
16-
"-j
\\
5DDD-
\\
",
1DDDD-
~
""', "-
:.
11DDD-
L --
'\
\.\
~~
'~
-- -.
9-518- Liner
\'\ ---
-~
,
7-5/8- Liner
\,
,"'\
14DDD-
.....
--~
11-7/8-
16DDD-
LJB
\\
I
15DDD-
e50
BY
I
I
I
I
9DDD-
13DDD-
5/e4/85
DATE
\\
BDDD-
12DDD-
leO
ElQv//fO
7DDD-
'-
Development
Saurc.,
6DDD-
CASING PDINT
,,
\\
\
ii
\\ !
5-1/2- Liner
17DDD1BDDD
19DDD
2DDDD- 8
10
11
12
13
14
15
16
17
18
L85.ICAL.
SURF. CSC. -TO
ECD
19
20
TIE-BACK SLEEVE
:!:450'
.'.
"
T ---
:!: 200'
,:
ZONE
>
'A,'
. ' , ' '<.-
--A: