Professional Documents
Culture Documents
(Project Manager)
E-Mail: panwar_ctae@yahoo.co.in,tanurawaji@gmail.com
Telephone: 09413163735, 07389931917
PURPOSE STATEMENT: Seeking assignments in Power & Cement Project
Engineering / New power & Cement Project Planning / Power & Cement
plants project with a growth oriented organization of repute.
CAREER ABSTRACTS
An Electrical project Dy.Manager with over 7 years of experience in Detail engineering as
well as Project planning, ordering, procurement, erection and commissioning of 3000 TPD
& 6500 TPD Cement Plant, 250 TPH Grinding Unit , 132/220kV Switchyard , 11KV,33KV
&132 KV line and Operation and Maintenance of Grinding Unit.
Presently Working With Ruchi Group as a Manager (Dy.HOD) for 2.5 MTPA Green
Field Cement Project , 45 MW Captive Power Plants and 132 KV Switchyard &
Line at Satna (M.P.)
Hands on experience
power, control of HT< Panels, LT&HT Motors of 3000TPD (05Nos.Kiln Unit& 2Nos. of
Grinding Unit) Cement Plant, 132KV line & Switchyard and Green Field Project of
Grinding Unit, Suratgarh & also Knowledge of Instrumentation and Operations and
Maintenance of grinding Unit.
Experience as an Asst.Manager (Dy.HOD) of Cement Mill Grinding Unit from Green Field
Projects to Internal Projects and Operation & Maintenance.
Experience in Project Handling, planning, ordering, erection & commissioning for 132KV
Line & Switchyard, 6.6kV Substation.
Successful erection, testing and commissioning of 132kV Switchyard & Line & 6.6kV
Substation for new unit of Shree Cement.
Liasioning with Govt. Authorities related to power connection and erection, commissioning
of 132KV Line with Bay for Grinding Units, Suratgarh.
Adept with AutoCAD for process, sub station layout and SLD representation.
Successfully commissioned Power Control Centre (PCC), Motor Control Centre (MCC)
Panel, Slip Ring HT Motors (upto 2400KW) and LT & HT Motors for the new Unit with
Instrumentation jobs.
Successfully erection, Testing & Commissioning of Four nos. of 20/25MVA and Two nos.
of 10/12.5 MVA Transformers in 132KV Switchyard of Shree Cement Ltd at Ras Site
and Suratgarh (Rajasthan).
Successfully erection, Testing & Commissioning of Five Units of 3000TPD at Ras Site with
Two Units of Cement mill Grinding.
Adept with Siemens PLC, SCS &Mitta Tech and AutoCAD and Rockwell PLC&SCADA
and ERP Module for process representation and Plant operation with automation and
Indent, Work Order, Move Order, PO requisitions.
An Electrical Engineer with over 09months of experience in operation and maintenance
SUZLON WIND FARM SERVICE LIMITED (SWSL) (An ISO 9001:2000 Company)
Possess excellent analytical, problem solving and leadership skills.
Hands on experience of Relay Co-ordination and Testing for ABB and T&D Areva make
numerical relays i.e. SPAM 150C, SPAJ 140&141C, SPAD 346C and P441, 42 Series & P
632 series.
ACADEMIC CREDENTIALS
2012
Result awaited
2010
61.8%
2005
BE (Electrical Engineering)
61.1%
2000
XII (MBiPC)
70.2%
1998
74.6%
Running Qualification
2011 Energy Manager
BEE, Chennai
2 nd
KNOWLEDGE DOMAIN
Ordering of Raw Mill (5600 KW), Raw Mill Fan (5050 KW), Preheater Fan (1475 KW),
Crusher (1440 KW), Coal Mill (900 KW) at 11KV level and Kiln (2*775 KW).
Presently working with Ruchi Group (Reventi Cement Pvt Ltd) as a Dy.Manager
(Dy.HOD), Electrical Department (2.5 MTPA Green Field Projects with 45 MW
Captive Power Plant) at Satna (M.P.).
My current C.T.C. is 9.15 Lacs / annum.
Expected Salary negotiable.
Responsibility per Year
June, 06 to June, 07
Designation
GET
Involved in Erection, Commissioning & Testing of 20/25 MVA Trafo and new 132KV
Switchyard.
Work of Construction power for 3000TPD Project.
June, 07 to March, 09
Designation
Engineer
Designation
Senior
March-10 to June-11
Designation
Astt.Manager
As a Dy.HOD of Cement Mill Grinding Unit, Suratgarh (A Unit of Shree Cement Ltd)
for internal project and operation & Maintenance of 11KM line of 132KV, 132KV Switchyard
with 10/12.5 MVA & 2.5 MVA Trafo, 6.6KV Switchgear, PCC, MCC and 2*2400KW,2*1000
KW,900KW Slip Ring drives CGL make and 200 Nos. LT Motors
Successfully experience of Plant Stabilization and Energy Conservation of Plant by using
VFD, Lighting through DCS, Energy Saver etc.
Knowledge of Control drawing schemes, wiring, Power Circuits and modification in LRS,
GRR, Packers and HT & LT Panels.
Operation and Maintenance of Packing Plant with Two Nos. Packers with Six Nos. Loader
Since June-11
Designation
Dy.Manager
Sep05 to June06
Suzlon make different type of Advanced Digital Control System PLC based Wind Turbine
Generator like 2.1MW, 2MW, 1.25MW, 1MW, 900KW, 600KW and 350KW. My duty is Testing
& Commissioning of machine L.T. and H.T. side as well as Maintenance and Operation.
The advanced SCS system helps monitor all the important parameters of each turbine for
Operation & Maintenance System
Developed programs to test analog/digital circuitry and perform tests of continuity,
resistance, insulation, breakdown, impedance, voltage level, current, and frequency, to
determine fault isolation.
Acted as liaisons to corroborate plans between contractors and base technicalmanagement personnel. Facilitated strong communications between cross-functional
teams and personnel.
AWARDS
Award for Exemplary Work:-Online Modification of Two Nos. 10/12.5 MVA Trafo from
20/25 MVA Trafo with CT, LA and SF6 Breakers.
Award for Exemplary Study:-Scoring 96 out of 100 in Mathematics from CBSE (1998).
Project Work
1. Wind Energy Generation and controlBE
2. Generation of Harmonics in Cement PlantPGDBA
3. Net Energy analysis from concentrated solar power in Rajasthan...
.......................................................................M.Tech
IT SKILLS
Operating System
Software
:
:
Cricket
Wrestling
Athletics
Throw)
Kabaddi
Hockey
Football
Table Tennis
Participant on College.
Participant on College.
Participant on College.
Company Level.
Hobbies
1. Study 2. Playing 3. Goal achieving.
PERSONAL DETAILS
Address
Date of Birth
: 14-12-1982
Declaration
Date: 18-March-11
Place: Satna (M.P.)