You are on page 1of 5

MOHAN SINGH PANWAR

(Project Manager)
E-Mail: panwar_ctae@yahoo.co.in,tanurawaji@gmail.com
Telephone: 09413163735, 07389931917
PURPOSE STATEMENT: Seeking assignments in Power & Cement Project
Engineering / New power & Cement Project Planning / Power & Cement
plants project with a growth oriented organization of repute.
CAREER ABSTRACTS
An Electrical project Dy.Manager with over 7 years of experience in Detail engineering as
well as Project planning, ordering, procurement, erection and commissioning of 3000 TPD
& 6500 TPD Cement Plant, 250 TPH Grinding Unit , 132/220kV Switchyard , 11KV,33KV
&132 KV line and Operation and Maintenance of Grinding Unit.
Presently Working With Ruchi Group as a Manager (Dy.HOD) for 2.5 MTPA Green
Field Cement Project , 45 MW Captive Power Plants and 132 KV Switchyard &
Line at Satna (M.P.)

Hands on experience

in ordering, erection, testing & commissioning of various types of

power, control of HT&LT Panels, LT&HT Motors of 3000TPD (05Nos.Kiln Unit& 2Nos. of
Grinding Unit) Cement Plant, 132KV line & Switchyard and Green Field Project of
Grinding Unit, Suratgarh & also Knowledge of Instrumentation and Operations and
Maintenance of grinding Unit.
Experience as an Asst.Manager (Dy.HOD) of Cement Mill Grinding Unit from Green Field
Projects to Internal Projects and Operation & Maintenance.
Experience in Project Handling, planning, ordering, erection & commissioning for 132KV
Line & Switchyard, 6.6kV Substation.
Successful erection, testing and commissioning of 132kV Switchyard & Line & 6.6kV
Substation for new unit of Shree Cement.
Liasioning with Govt. Authorities related to power connection and erection, commissioning
of 132KV Line with Bay for Grinding Units, Suratgarh.
Adept with AutoCAD for process, sub station layout and SLD representation.
Successfully commissioned Power Control Centre (PCC), Motor Control Centre (MCC)
Panel, Slip Ring HT Motors (upto 2400KW) and LT & HT Motors for the new Unit with
Instrumentation jobs.
Successfully erection, Testing & Commissioning of Four nos. of 20/25MVA and Two nos.
of 10/12.5 MVA Transformers in 132KV Switchyard of Shree Cement Ltd at Ras Site
and Suratgarh (Rajasthan).
Successfully erection, Testing & Commissioning of Five Units of 3000TPD at Ras Site with
Two Units of Cement mill Grinding.
Adept with Siemens PLC, SCS &Mitta Tech and AutoCAD and Rockwell PLC&SCADA
and ERP Module for process representation and Plant operation with automation and
Indent, Work Order, Move Order, PO requisitions.
An Electrical Engineer with over 09months of experience in operation and maintenance
SUZLON WIND FARM SERVICE LIMITED (SWSL) (An ISO 9001:2000 Company)
Possess excellent analytical, problem solving and leadership skills.

Hands on experience of Relay Co-ordination and Testing for ABB and T&D Areva make
numerical relays i.e. SPAM 150C, SPAJ 140&141C, SPAD 346C and P441, 42 Series & P
632 series.
ACADEMIC CREDENTIALS
2012

M.Tech (Power System)

Rajasthan Technical University, Kota

Result awaited

2010

PGDBA (Operations Management)

Symbiosis centre for Distance learning, Pune

61.8%

2005

BE (Electrical Engineering)

Government College, Udaipur

61.1%

2000

XII (MBiPC)

Central Board of Secondary Education

70.2%

1998

Central Board of Secondary Education

74.6%

Running Qualification
2011 Energy Manager

BEE, Chennai

2 nd

KNOWLEDGE DOMAIN

Manufacturing Engineering Design


Major Electrical Equipments ordering, Project planning, designing, erection, testing,
commissioning, material handling and Construction power work.
Preparation of electrical power distribution network and single line diagrams.
Preparation of power, control and protection & metering schemes.
Preparation of drive list, HT, PCC, MCC feeder list.
Approval of drawings & designing for
electrical equipments i.e. Switchyard
equipment,HT&LT MOTORS, PCC&MCC panels,P&V System,HT&LT Capacitor Bank.
Preparation and review of Single line diagram for 132KV, 6.6KV and 0.44KV System.
Preparation and review of drawings for Substation, Control Centre/Room, Load center and
plant area viz. earthing layout, Lighting Layout etc.
Designing of drawing for Cable Gallery, Load Center, Cable Trays and Cable Routing
Layout.
Erection and commissioning of HT Capacitor Banks upto 1200 KVAR at voltage level 7.2KV.
Well familiar with the type of switchgear protection schemes & relay coordination
(ABB&AREAVA).
Intra & Inter departmental coordination for procurement
Project coordination with customer and supplier for procurement
Procurement assistance activities viz. preparation of specification& Requisitions, quotation
offer evaluation and approval of vendor documents for HT/LT Switchgear, Substation
automation system, Transformers, UPS,DC system, DG Set, capacitor banks, Electrical
bulk items etc.
Conceptualisation of electrical power distribution network, sub-station layouts and plant
layouts.
Modifying /upgrading existing designs using specialized software like AUTOCAD
Well acknowledge with all type of control drawings.
Programming knowledge of Rockwell Automation and ERP Module for Plant
Processes and Material Handling.
Individually Handle project take over, planning and scheduling, project co-ordination,
monitoring and control
Operation and Maintenance of Cement Mill (2*2400 KW),Roller Press (2*1000
KW),12.5/10 MVA & 2.5 MVA Transformer ,LT Motors, 132 KV Switchyards and whole
grinding unit electrical equipment .

Ordering of Raw Mill (5600 KW), Raw Mill Fan (5050 KW), Preheater Fan (1475 KW),
Crusher (1440 KW), Coal Mill (900 KW) at 11KV level and Kiln (2*775 KW).

PRESENTLY ORGANIZATIONAL EXPERIENCE


Since 28-June- 2011

Ruchi Group (Reventi Cement Pvt Ltd)

Presently working with Ruchi Group (Reventi Cement Pvt Ltd) as a Dy.Manager
(Dy.HOD), Electrical Department (2.5 MTPA Green Field Projects with 45 MW
Captive Power Plant) at Satna (M.P.).
My current C.T.C. is 9.15 Lacs / annum.
Expected Salary negotiable.
Responsibility per Year
June, 06 to June, 07

Designation

GET

Involved in Erection, Commissioning & Testing of 20/25 MVA Trafo and new 132KV
Switchyard.
Work of Construction power for 3000TPD Project.
June, 07 to March, 09

Designation

Engineer

Independently working for successfully Commissioning of new bay of 132KV Switchyard


with 20/25 MVA Trafo.
Involve in Erection, Commissioning and testing of MCC, PCC and LT Motors of Raw Mill
Section.
Independently working for successfully Commissioning of Pyro-Section of 3000TPD, World
Record Plant.

From March, 09 -10


Engineer

Designation

Senior

Independently working for successfully Commissioning of Modifications of 2 Nos. Bay of


132KV Switchyard with replacing 10/12.5 MVA trafo to 20/25 MVA Trafo.
As a Project Incharge of Green Field Project of Grinding Unit, Suratgarh and activity
are 11KM line of 132KV,132KV Switchyard with 10/12.5 MVA Trafo,6.6KV Switchgear, PCC,
MCC and 2400KW Slip Ring drive and 200 Nos. LT Motors

March-10 to June-11

Designation

Astt.Manager

As a Dy.HOD of Cement Mill Grinding Unit, Suratgarh (A Unit of Shree Cement Ltd)
for internal project and operation & Maintenance of 11KM line of 132KV, 132KV Switchyard
with 10/12.5 MVA & 2.5 MVA Trafo, 6.6KV Switchgear, PCC, MCC and 2*2400KW,2*1000
KW,900KW Slip Ring drives CGL make and 200 Nos. LT Motors
Successfully experience of Plant Stabilization and Energy Conservation of Plant by using
VFD, Lighting through DCS, Energy Saver etc.
Knowledge of Control drawing schemes, wiring, Power Circuits and modification in LRS,
GRR, Packers and HT & LT Panels.
Operation and Maintenance of Packing Plant with Two Nos. Packers with Six Nos. Loader

Since June-11

Designation

Dy.Manager

As a Dy.HOD of Green Field Cement Project with Captive Power Plant,Satna(M.P.)


Reventi Cement Pvt Ltd (A Unit of Ruchi Group) for Erection,Commissioning and
Testing of 20 KM line of 220KV, 220 KV Switchyard Power Transformers, HT Switchgears,
PCC, MCC and HT & LT Motors.

Sep05 to June06

SUZLON WIND FARM SERVICE LIMITED (SWSL)

Suzlon make different type of Advanced Digital Control System PLC based Wind Turbine
Generator like 2.1MW, 2MW, 1.25MW, 1MW, 900KW, 600KW and 350KW. My duty is Testing
& Commissioning of machine L.T. and H.T. side as well as Maintenance and Operation.
The advanced SCS system helps monitor all the important parameters of each turbine for
Operation & Maintenance System
Developed programs to test analog/digital circuitry and perform tests of continuity,
resistance, insulation, breakdown, impedance, voltage level, current, and frequency, to
determine fault isolation.
Acted as liaisons to corroborate plans between contractors and base technicalmanagement personnel. Facilitated strong communications between cross-functional
teams and personnel.
AWARDS
Award for Exemplary Work:-Online Modification of Two Nos. 10/12.5 MVA Trafo from
20/25 MVA Trafo with CT, LA and SF6 Breakers.
Award for Exemplary Study:-Scoring 96 out of 100 in Mathematics from CBSE (1998).

Project Work
1. Wind Energy Generation and controlBE
2. Generation of Harmonics in Cement PlantPGDBA
3. Net Energy analysis from concentrated solar power in Rajasthan...
.......................................................................M.Tech

IT SKILLS
Operating System
Software

:
:

Win 98/ 2000/ Win XP


AutoCAD, MS OFFICE
Sports

Cricket
Wrestling
Athletics
Throw)
Kabaddi
Hockey
Football
Table Tennis

: Participant on College and University Level, Company Level.


: Participant on College and University Level
: Participant on College and University Level (100Mtr, 200Mtr, Shotfoot, Disc
:
:
:
:

Participant on College.
Participant on College.
Participant on College.
Company Level.

Hobbies
1. Study 2. Playing 3. Goal achieving.

PERSONAL DETAILS
Address

V-Tanu Rawaji, P-Tanu Manaji, T- Shiv, D-Barmer (Rajasthan)

Date of Birth

: 14-12-1982

Declaration

I consider myself familiar with Electrical Engineering Aspects. I am also confident of


my ability to work in a team.
I hereby declare that the information furnished above is true to best of my
knowledge.

Date: 18-March-11
Place: Satna (M.P.)

Mohan Singh Panwar