You are on page 1of 2

45804 Federal Register / Vol. 72, No.

157 / Wednesday, August 15, 2007 / Notices

Description: PowerGrid Systems Inc Docket Numbers: ES07–55–000. service, persons with Internet access
submits a petition for acceptance of its Applicants: Entergy Nuclear who will eFile a document and/or be
FERC Electric Tariff, Original Volume 1. Palisades, LLC. listed as a contact for an intervenor
Filed Date: 08/06/2007. Description: Application Requesting must create and validate an
Accession Number: 20070807–0135. Rescission of Certain Section 204 eRegistration account using the
Comment Date: 5 p.m. Eastern Time Authorization and Request for Blanket eRegistration link. Select the eFiling
on Monday, August 27, 2007. Authorization Under Part 34 for Entergy link to log on and submit the
Docket Numbers: ER07–1251–000. Nuclear Palisades, LLC. intervention or protests.
Applicants: Northern Maine Filed Date: 08/02/2007. Persons unable to file electronically
Independent System Administrator, Inc. Accession Number: 20070802–5055. should submit an original and 14 copies
Description: Northern Maine Comment Date: 5 p.m. Eastern Time of the intervention or protest to the
Independent System Administration, on Thursday, August 23, 2007. Federal Energy Regulatory Commission,
Inc submits revisions to the NMISA Take notice that the Commission 888 First St., NE., Washington, DC
FERC Electric Tariff, Original Volume 1. received the following open access 20426.
Filed Date: 08/03/2007. transmission tariff filings: The filings in the above proceedings
Accession Number: 20070807–0136. Docket Numbers: OA07–80–000. are accessible in the Commission’s
Comment Date: 5 p.m. Eastern Time Applicants: MidAmerican Energy eLibrary system by clicking on the
on Friday, August 24, 2007. Company. appropriate link in the above list. They
Docket Numbers: ER07–1252–000. Description: MidAmerican Energy are also available for review in the
Applicants: Entergy Services, Inc. Company submits supplements to their Commission’s Public Reference Room in
Description: Entergy Services, Inc 7/13/07 filing and submits pro forma Washington, DC. There is an
acting as agent for Entergy Operating Second Revised Sheet 137 and 140 of eSubscription link on the Web site that
Companies submits unexecuted First the Open Access Transmission Tariff. enables subscribers to receive e-mail
Revised Transmission Service Filed Date: 08/01/2007. notification when a document is added
Agreement between Entergy & American Accession Number: 20070802–0023. to a subscribed dockets(s). For
Electric Power Service Corp. Comment Date: 5 p.m. Eastern Time assistance with any FERC Online
Filed Date: 08/06/2007. on Wednesday, August 22, 2007. service, please e-mail
Accession Number: 20070807–0209. Take notice that the Commission FERCOnlineSupport@ferc.gov or call
Comment Date: 5 p.m. Eastern Time received the following electric (866) 208–3676 (toll free). For TTY, call
on Monday, August 27, 2007. reliability filings: (202) 502–8659.
Docket Numbers: ER07–1253–000. Docket Numbers: RR06–1–010.
Applicants: Delaware Municipal Applicants: North American Electric Nathaniel J. Davis, Sr.,
Electric Corporation. Reliability Corp. Acting Secretary.
Description: Delaware Municipal Description: Compliance Filing of the [FR Doc. E7–15990 Filed 8–14–07; 8:45 am]
Electric Corporation, Inc submits FERC North American Electric Reliability BILLING CODE 6717–01–P
Electric Tariff, Original Volume 1 & Corporation in Response to June 7, 2007
supporting cost data. Order.
Filed Date: 08/06/2007. Filed Date: 08/06/2007. DEPARTMENT OF ENERGY
Accession Number: 20070807–0208. Accession Number: 20070806–5027.
Comment Date: 5 p.m. Eastern Time Comment Date: 5 p.m. Eastern Time Federal Energy Regulatory
on Monday, August 27, 2007. on Monday, August 27, 2007. Commission
Docket Numbers: ER07–1254–000. Any person desiring to intervene or to
[Project No. 82–000]
Applicants: Midwest Independent protest in any of the above proceedings
Transmission System Operator, Inc. must file in accordance with Rules 211 Alabama Power Company; Notice of
Description: Midwest Independent and 214 of the Commission’s Rules of Authorization for Continued Project
Transmission System Operator Inc Practice and Procedure (18 CFR 385.211 Operation
submits proposed revisions to Articles and 385.214) on or before 5 p.m. Eastern
two & five & Appendices A & F of the time on the specified comment date. It August 8, 2007.
agreement of transmission facilities is not necessary to separately intervene On July 28, 2005, Alabama Power
owners. again in a subdocket related to a Company, licensee for the Mitchell
Filed Date: 08/06/2007. compliance filing if you have previously Hydroelectric Project, filed an
Accession Number: 20070807–0210. intervened in the same docket. Protests application for a new or subsequent
Comment Date: 5p.m. Eastern Time will be considered by the Commission license pursuant to the Federal Power
on Monday, August 27, 2007. in determining the appropriate action to Act (FPA) and the Commission’s
Take notice that the Commission be taken, but will not serve to make regulations thereunder. The Mitchell
received the following electric securities protestants parties to the proceeding. Project is located on the Coosa River in
filings: Anyone filing a motion to intervene or the state of Alabama.
Docket Numbers: ES07–50–000. protest must serve a copy of that The license for Project No. 82 was
Applicants: Monongahela Power document on the Applicant. In reference issued for a period ending July 31, 2007.
Company. to filings initiating a new proceeding, Section 15(a)(1) of the FPA, 16 U.S.C.
Description: Monongahela Power interventions or protests submitted on 808(a)(1), requires the Commission, at
Company submits application for or before the comment deadline need the expiration of a license term, to issue
authorization under Section 204(A) of not be served on persons other than the from year-to-year an annual license to
ebenthall on PROD1PC69 with NOTICES

the Federal Power Act to Issue Applicant. the then licensee under the terms and
Securities under ES07–50. The Commission encourages conditions of the prior license until a
Filed Date: 07/27/2007. electronic submission of protests and new license is issued, or the project is
Accession Number: 20070809–0138. interventions in lieu of paper, using the otherwise disposed of as provided in
Comment Date: 5 p.m. Eastern Time FERC Online links at http:// section 15 or any other applicable
on Friday, August 17, 2007. www.ferc.gov. To facilitate electronic section of the FPA. If the project’s prior

VerDate Aug<31>2005 15:00 Aug 14, 2007 Jkt 211001 PO 00000 Frm 00082 Fmt 4703 Sfmt 4703 E:\FR\FM\15AUN1.SGM 15AUN1
Federal Register / Vol. 72, No. 157 / Wednesday, August 15, 2007 / Notices 45805

license waived the applicability of American River Hydroelectric Project is DEPARTMENT OF ENERGY
section 15 of the FPA, then, based on located on the Rubicon River, Silver
section 9(b) of the Administrative Creek, and South Fork of the American Federal Energy Regulatory
Procedure Act, 5 U.S.C. 558(c), and as River near Placerville, California. Commission
set forth at 18 CFR 16.21(a), if the The license for Project No. 2101–000 [Project No. 2146–000]
licensee of such project has filed an was issued for a period ending July 31,
application for a subsequent license, the 2007. Section 15(a)(1) of the FPA, 16 Alabama Power Company; Notice of
licensee may continue to operate the U.S.C. 808(a)(1), requires the Authorization for Continued Project
project in accordance with the terms Commission, at the expiration of a Operation
and conditions of the license after the license term, to issue from year-to-year
minor or minor part license expires, August 8, 2007.
an annual license to the then licensee On July 28, 2005, Alabama Power
until the Commission acts on its under the terms and conditions of the
application. If the licensee of such a Company, licensee for the Coosa River
prior license until a new license is Hydroelectric Project, filed an
project has not filed an application for issued, or the project is otherwise
a subsequent license, then it may be application for a new or subsequent
disposed of as provided in section 15 or license pursuant to the Federal Power
required, pursuant to 18 CFR 16.21(b),
any other applicable section of the FPA. Act (FPA) and the Commission’s
to continue project operations until the
If the project’s prior license waived the regulations. The Coosa River Project is
Commission issues someone else a
applicability of section 15 of the FPA, located on the Coosa River in the states
license for the project or otherwise
then, based on section 9(b) of the of Alabama and Georgia.
orders disposition of the project.
If the project is subject to section 15 Administrative Procedure Act, 5 U.S.C. The license for Project No. 2146 was
of the FPA, notice is hereby given that 558(c), and as set forth at 18 CFR issued for a period ending July 31, 2007.
an annual license for Project No. 82 is 16.21(a), if the licensee of such project Section 15(a)(1) of the FPA, 16 U.S.C.
issued to Alabama Power Company, for has filed an application for a subsequent 808(a)(1), requires the Commission, at
a period effective August 1, 2007 license, the licensee may continue to the expiration of a license term, to issue
operate the project in accordance with from year-to-year an annual license to
through July 31, 2008, or until the
the terms and conditions of the license the then licensee under the terms and
issuance of a new license for the project
after the minor or minor part license conditions of the prior license until a
or other disposition under the FPA,
expires, until the Commission acts on new license is issued, or the project is
whichever comes first. If issuance of a
its application. If the licensee of such a otherwise disposed of as provided in
new license (or other disposition) does
project has not filed an application for section 15 or any other applicable
not take place on or before July 31,
a subsequent license, then it may be section of the FPA. If the project’s prior
2008, notice is hereby given that,
required, pursuant to 18 CFR 16.21(b), license waived the applicability of
pursuant to 18 CFR 16.18(c), an annual
to continue project operations until the section 15 of the FPA, then, based on
license under section 15(a)(1) of the
Commission issues someone else a section 9(b) of the Administrative
FPA is renewed automatically without Procedure Act, 5 U.S.C. 558(c), and as
further order or notice by the license for the project or otherwise
orders disposition of the project. set forth at 18 CFR 16.21(a), if the
Commission, unless the Commission licensee of such project has filed an
orders otherwise. If the project is not If the project is subject to section 15 application for a subsequent license, the
subject to section 15 of the FPA, notice of the FPA, notice is hereby given that licensee may continue to operate the
is hereby given that Alabama Power an annual license for Project No. 2101 project in accordance with the terms
Company is authorized to continue is issued to Sacramento Municipal and conditions of the license after the
operation of the Mitchell Project until Utility District, for a period effective minor or minor part license expires,
such time as the Commission acts on its August 1, 2007 through July 31, 2008, or until the Commission acts on its
application for a subsequent license. until the issuance of a new license for application. If the licensee of such a
Kimberly D. Bose, the project or other disposition under project has not filed an application for
the FPA, whichever comes first. If a subsequent license, then it may be
Secretary.
issuance of a new license (or other required, pursuant to 18 CFR 16.21(b),
[FR Doc. E7–15904 Filed 8–14–07; 8:45 am]
disposition) does not take place on or to continue project operations until the
BILLING CODE 6717–01–P
before July 31, 2008, notice is hereby Commission issues someone else a
given that, pursuant to 18 CFR 16.18(c), license for the project or otherwise
DEPARTMENT OF ENERGY an annual license under section 15(a)(1) orders disposition of the project.
of the FPA is renewed automatically If the project is subject to section 15
Federal Energy Regulatory without further order or notice by the of the FPA, notice is hereby given that
Commission Commission, unless the Commission an annual license for Project No. 2146
orders otherwise. If the project is not is issued to Alabama Power Company,
[Project No. 2101–000] subject to section 15 of the FPA, notice for a period effective August 1, 2007
Sacramento Municipal Utility District; is hereby given that Sacramento through July 31, 2008, or until the
Notice of Authorization for Continued Municipal Utility District, is authorized issuance of a new license for the project
Project Operation to continue operation of the Upper or other disposition under the FPA,
American River Hydroelectric Project whichever comes first. If issuance of a
August 8, 2007. until such time as the Commission acts new license (or other disposition) does
On July 15, 2005, Sacramento on its application for a subsequent not take place on or before July 31,
ebenthall on PROD1PC69 with NOTICES

Municipal Utility District, licensee for license. 2008, notice is hereby given that,
the Upper American River Hydroelectric pursuant to 18 CFR 16.18(c), an annual
Kimberly D. Bose,
Project, filed an application for a new or license under section 15(a)(1) of the
subsequent license pursuant to the Secretary. FPA is renewed automatically without
Federal Power Act (FPA) and the [FR Doc. E7–15906 Filed 8–14–07; 8:45 am] further order or notice by the
Commission’s regulations. The Upper BILLING CODE 6717–01–P Commission, unless the Commission

VerDate Aug<31>2005 15:00 Aug 14, 2007 Jkt 211001 PO 00000 Frm 00083 Fmt 4703 Sfmt 4703 E:\FR\FM\15AUN1.SGM 15AUN1

You might also like