RAILWAY TRACK
MARCH 2015
MARCH 2015
IDEAL SOIL
POOR SOIL
MARCH 2015
Resistant to erosion,
Permeable for water,
SOIL TYPES
COARSE-GRAINED SOILS
FINE-GRAINED SOILS
PROPORTIONS
ORGANIC SOILS
MARCH 2015
SOIL TYPES
COARSE-GRAINED SOILS
The
particles
can
be
distinguished by the naked
eye :
Boulders (have diameter
greater than 300 mm)
Cobbles (have diameter
between 75 mm and 300
mm)
Gravel
(has
diameter
between 4.75 mm and 75
mm)
Sand
(has
diameter
between 0.075 mm and 4.75
mm)
MARCH 2015
SOIL TYPES
FINE-GRAINED SOILS
MARCH 2015
SOIL TYPES
PROPORTIONS
Fine material
Below %5
Coarse-grained soil
Mixed-grained soil
Over %40
Fine-grained soil
MARCH 2015
10
SOIL TYPES
ORGANIC SOILS
These are the swamps and peat soil. Organic layers in the
ground can be animal or vegetable origin.
MARCH 2015
11
SOIL TESTS
MARCH 2015
12
SOIL TESTS
SHAPE INEQUALITY DEGREE (U)
PROCTOR COMPACTION TEST
PLATE LOAD TEST
BEARING CAPACTY TEST
PLASTIC PROPERTIES
CALIFORNIA BEARING RATIO (CBR)
WATER CONTENT AND DRY DENSITY
MARCH 2015
13
SOIL TESTS
SHAPE INEQUALITY DEGREE (U)
U is ratio between weights of grains have size 0-60 mm
and 0-10 mm. It shows slope of grain distiribution. If this
ratio is low (U is lower than 6 ) slope is vertical. This means
ground has almost same grain size. If this ratio is high (U is
higher than 6) ground has different grain sizes.
MARCH 2015
14
SOIL TESTS
PROCTOR COMPACTION TEST
This test establish relation between
water ratio and dry unit weight of
ground. Using this relation we have a
proctor density that is a value using to
estimate compress density of adhesive
grounds. When water ratio below
optimal water ratio, proctor density can
be
100%
with
an
additional
compressing. If water ratio above
optimal water ratio, proctor density can
not be calculated with an additional
compressing.
MARCH 2015
15
SOIL TESTS
PROCTOR COMPACTION TEST
16
SOIL TESTS
PLATE LOAD TEST
Beside dry density, this test gives us a value that specifes
quality of loadbearing or protective material and bearing
capasity. At plate load test a circle plate has 30 cm
diameter makes loading and discharge with different
weights. Circle makes a mark is measured to calculate
depth.
MARCH 2015
17
SOIL TESTS
BEARING CAPACTY TEST
Short time pulsed loadings are made to track bed. This
way track bed has softened vibration. If sinking and
vibration is bigger, track bed has low bearing capacity. This
test has shorter needed time. Results are nearer to real
load effects than plate load test and also results is ready to
use directly.
MARCH 2015
18
SOIL TESTS
PLASTIC PROPERTIES
MARCH 2015
19
SOIL TESTS
CALIFORNIA BEARING RATIO (CBR)
CBR s resistant that ground shows to 20 cm2 cylinder
compress ground with a steady speed that 1.25 mm in a
minute. Resistant curve is compared to a standart curve.
Result is percentage of force that do equal going into best
loadbearing material.
MARCH 2015
20
SOIL TESTS
WATER CONTENT AND DRY DENSITY
Water content is determined with drying process in oven.
Water content ratio is current water content over dry
weight. Dry density is t/m3 or kg/m3 . Optimal dry density is
maximum dry density that ground can be concentrated.
MARCH 2015
21
GROUND INSPECTION
MARCH 2015
22
GROUND INSPECTION
SEISMIC METHOD
BORING
CONE PENETRATION TEST
MARCH 2015
23
TRACK BED
SEISMIC METHOD
MARCH 2015
24
TRACK BED
SEISMIC METHOD
Seismic method is used in the examination of major
grounds. When appliying this examination speed of waves,
size of amplitude and decrease of amplitude is measured.
MARCH 2015
25
TRACK BED
BORING
Boring machine will bring to the
surface, soils that will be tested.
With
these
tests we
get
soil
proporties.
MARCH 2015
26
TRACK BED
CONE PENETRATION TEST
MARCH 2015
27
TRACK BED
CONE PENETRATION TEST
28
GROUND STABILIZATION
AND
GROUND IMPROVEMENT
MARCH 2015
29
GROUND STABILIZATION
GROUND IMPROVEMENT
MARCH 2015
30
31
ground
improvement
process,
suitability
for
MARCH 2015
32
CHEMICAL GROUND
IMPROVEMENT
MARCH 2015
33
MARCH 2015
34
35
Coarse-grained
ground
stabilization
and
MARCH 2015
36
TRACK BED
MARCH 2015
37
TRACK BED
TRACK BED
TRACK BED LAYERS
TRACK BED DRAINAGE
LAYER REQUIREMENTS
MARCH 2015
38
TRACK BED
TRACK BED
39
TRACK BED
TRACK BED
40
TRACK BED
TRACK BED LAYERS
MARCH 2015
41
TRACK BED
TRACK BED DRAINAGE
MARCH 2015
42
TRACK BED
LAYER REQUIREMENTS
Subballast, geosynthetic materials, subbase prevent fine
materials in infrastructure move up to inside ballast and
accumulation water in infrastructure.
Balast layer have slope with 1/20 rate to nearest drainage
channel.
In case of ballast layer or filler contains sand, average
pressure should not exceed 0.05 MN/m2 at layer contains
sand. Other granular materials can be rated for higher
pressures and geosynthetic layers (e.g. geotextile, geogrid,
geomembrane, geocomposite ) can be used.
MARCH 2015
43
TRACK BED
LAYER REQUIREMENTS
44
USAGE OF GEOTEXTILE
PRODUCT
MARCH 2015
45
46
MARCH 2015
47
TRACK BED
TRACK BED FAILURES
48
TRACK BED
TRACK BED FAILURES
At very adhessive grounds and grounds become tight due
to load changes, pitting occurs under sleepers, ground
swells under and between sleepers in direction of side
road. On this grounds when weather is rainy mud is
pumped to surface of ballast from sides of sleepers. This
shape changes in ground occur both in rainy and dry
weather, and it occurs very slowly.
At grounds with equal size of sand, losses can occur with
wind erosion. At very adhesive grounds at drought times
cracks occur due to become dry and shrinking, specially
warm climates at rainy times, swells can occur due to
wetting.
MARCH 2015
49
TRACK BED
CAUSES AND CONSEQUENSES OF TRACK BED FAILURES
50
TRACK BED
CAUSES AND CONSEQUENSES OF TRACK BED FAILURES
51
DRAINAGE SYSTEMS
MARCH 2015
52
DRAINAGE SYSTEMS
MARCH 2015
53
DRAINAGE SYSTEMS
SURFACE DRANAGE SYSTEMS
Cess drainage systems
54
DRAINAGE SYSTEMS
SURFACE DRANAGE SYSTEMS
Catch drainage systems
These drainage systems
are
also
named
top
drainage systems or surface
drainage
systems.
The
purpose of such drainage
systems is to intercept water
flow
by
means
of
embankments or obstacles
in order to stop it before it
reaches the track.
55
DRAINAGE SYSTEMS
SUBSURFACE DRANAGE SYSTEMS
Functions of subsurface drainage systems
MARCH 2015
56
DRAINAGE SYSTEMS
SUBSURFACE DRANAGE SYSTEMS
Functions of subsurface drainage systems
MARCH 2015
57
DRAINAGE SYSTEMS
SUBSURFACE DRANAGE SYSTEMS
Types of subsurface drainage systems
MARCH 2015
Drainage blankets
58
DRAINAGE SYSTEMS
MANTENANCE OF DRANAGE COMPONENTS
Channel Drains and Ditches: common problems and their remedies
Problem
Cause
Blockage
Stone fall
Remedy
Overgrowth
preserve cross-section
reduce maintenance
Scour
Burrowing animals
MARCH 2015
59
DRAINAGE SYSTEMS
MANTENANCE OF DRANAGE COMPONENTS
Catchpits and Manholes: common problems and remedies
Problem
Cause
Remedy
Clean out by
Silting
Normal operation
a. hand excavation
b. mechanical jetting or vacuuming
Increase frequency of cleaning or
Blockage
Balast
girmesi
Chambers
filled or buried
Collapse
MARCH 2015
60
DRAINAGE SYSTEMS
MANTENANCE OF DRANAGE COMPONENTS
Maintenance and cleaning of drainage pipes
The cleaning of pipes should always start from the lower end or
outfall. This is because flooding can occur if pipes at a higher level
are cleaned first. Cleaning can be undertaken by pressure jetting,
61
DRAINAGE SYSTEMS
MANTENANCE OF DRANAGE COMPONENTS
Table 3: Piped Collector Drains: common problems and their remedies
Problem
Cause
Blockage of filter
media
Wet Beds
Remedy
Ballast attrition
Uneven pipe
gradient from
disturbance of formation
Inadequate capacity
for Catchment runoff
Hydraulic
MARCH 2015
62
DRAINAGE SYSTEMS
MANTENANCE OF DRANAGE COMPONENTS
Problem
Blockage
Winching: relies on ability to pass cable through
pipe
Vegetation management to restrict spread of trees
and:
Root intrusion
Pipe replacement
Complete collapse
Hydraulic insufficiency
Inadequate pipe capacity
MARCH 2015
63
DRAINAGE SYSTEMS
MANTENANCE OF DRANAGE COMPONENTS
Culverts: common problems and remedies
Cause
Remedy (depending upon severity)
Debris
Check/ clear Trash Screen
Clear non-man entry Culverts by
rodding, drag scraping, or water jetting
Clear non-man entry Culverts by water
jetting, hand excavation, drag scraping or,
Silt
if sufficient headroom, by mini digger
Problem
Blockage
Rubbish or trash
General deterioration
Structural
Scour voids
Collapse
Insufficient
capacity
MARCH 2015
flow
64
DRAINAGE SYSTEMS
MANTENANCE OF DRANAGE COMPONENTS
Siphons: particular problem and its remedy
Problem
Blockage
Cause
Cause
General deterioration
Structural
Wear, tear
Blockage
MARCH 2015
65
TUNNEL GAUGE
MARCH 2015
66
TUNNEL GAUGE
TUNNEL GAUGE
CONSTRUCTION GAUGE
LOADNG GAUGE
MARCH 2015
67
TUNNEL GAUGE
TUNNEL GAUGE
MARCH 2015
68
TUNNEL GAUGE
CONSTRUCTION GAUGE
MARCH 2015
69
TUNNEL GAUGE
LOADNG GAUGE
MARCH 2015
70
BRIDGES, CULVERTS,
VIADUCTS
MARCH 2015
71
BRIDGES
CULVERTS
VIADUCTS
MARCH 2015
72
MARCH 2015
73
MARCH 2015
74
MARCH 2015
75
MARCH 2015
76
MARCH 2015
77