You are on page 1of 2

Federal Register / Vol. 72, No.

121 / Monday, June 25, 2007 / Notices 34675

DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY EA in the Commission’s public record


for this proceeding or the issuance of a
Federal Energy Regulatory Federal Energy Regulatory Notice of Schedule for Environmental
Commission Commission Review will serve to notify federal and
[Docket Nos. CP07–395–000] state agencies of the timing for the
[Docket No. OA07–4–001] completion of all necessary reviews, and
Wyoming Interstate Company, Ltd; the subsequent need to complete all
UNS Electric, Inc.; Notice of Notice of Application Federal authorizations within 90 days of
Compliance Filing Amendment the date of issuance of the Commission
June 15, 2007. staff’s FEIS or EA.
June 18, 2007. Take notice that on June 6, 2007, There are two ways to become
Take notice that on May 31, 2007, Wyoming Interstate Company, Ltd. involved in the Commission’s review of
UNS Electric, Inc. (UNS), tendered for (WIC), Post Office Box 1087, Colorado this project. First, any person wishing to
filing an amendment to its compliance Springs, Colorado 80944, filed in Docket obtain legal status by becoming a party
filing with Order No. 890 in the above- No. CP07–395–000, an application to the proceedings for this project
referenced proceeding. UNS states that pursuant to section 7(c) of the Natural should, on or before the comment date
the two tariff sheets contained in Gas Act (NGA), requesting authorization stated below, file with the Federal
Exhibit A did not contain the proposed to construct and operate a new Energy Regulatory Commission, 888
changes to sections 19.3 and 19.7 of its compression facility, with First Street, NE., Washington, DC 20426,
OATT. appurtenances, located in Converse a motion to intervene in accordance
Any person desiring to intervene or to County, Wyoming (Medicine Bow with the requirements of the
protest this filing must file in Expansion Project). Specifically, these Commission’s Rules of Practice and
accordance with Rules 211 and 214 of facilities will be comprised of one Procedure (18 CFR 385.214 or 385.211)
the Commission’s Rules of Practice and natural gas driven compressor unit, with and the Regulations under the NGA (18
Procedure (18 CFR 385.211, 385.214). appurtenances, designed to transport up CFR 157.10). A person obtaining party
Protests will be considered by the to 330,000 Dth per day on WIC’s status will be placed on the service list
Commission in determining the Medicine Bow Lateral system. As part of maintained by the Secretary of the
appropriate action to be taken, but will this project, WIC is also seeking a pre- Commission and will receive copies of
not serve to make protestants parties to determination of roll-in for the costs all documents filed by the applicant and
the proceeding. Any person wishing to associated with this project and the by all other parties. A party must submit
become a party must file a notice of related fuel costs from the proposed 14 copies of filings made with the
intervention or motion to intervene, as facilities, all as more fully set forth in Commission and must mail a copy to
appropriate. Such notices, motions, or the application on file with the the applicant and to every other party in
protests must be filed on or before the Commission and open to public the proceeding. Only parties to the
comment date. Anyone filing a motion inspection. This filing may also be proceeding can ask for court review of
to intervene or protest must serve a copy viewed on the Commission’s Web site at Commission orders in the proceeding.
of that document on the Applicant and http://www.ferc.gov using the However, a person does not have to
all the parties in this proceeding. ‘‘eLibrary’’ link. Enter the docket intervene in order to have comments
The Commission encourages number, excluding the last three digits, considered. The second way to
electronic submission of protests and in the docket number field to access the participate is by filing with the
interventions in lieu of paper using the document. For assistance, call (202) Secretary of the Commission, as soon as
‘‘eFiling’’ link at http://www.ferc.gov. 502–8659 or TTY, (202) 208–3676. possible, an original and two copies of
Persons unable to file electronically Any questions regarding this comments in support of or in opposition
should submit an original and 14 copies application should be directed to to this project. The Commission will
of the protest or intervention to the Richard Derryberry, Director, Regulatory consider these comments in
Federal Energy Regulatory Commission, Affairs, Wyoming Interstate Company, determining the appropriate action to be
888 First Street, NE., Washington, DC Ltd., P.O. Box 1087, Colorado Springs, taken, but the filing of a comment alone
20426. Colorado, 80944 at (719) 520–3788 or by will not serve to make the filer a party
This filing is accessible on-line at fax at (719) 667–7534 or Craig V. to the proceeding. The Commission’s
http://www.ferc.gov, using the Richardson, Vice President and General rules require that persons filing
‘‘eLibrary’’ link and is available for Counsel, Wyoming Interstate Company, comments in opposition to the project
review in the Commission’s Public Ltd.; P.O. Box 1087, Colorado Springs, provide copies of their protests only to
Reference Room in Washington, DC. Colorado, 80944 at (719) 520–4829 or by the party or parties directly involved in
There is an ‘‘eSubscription’’ link on the fax at (719) 520–4898. the protest.
Web site that enables subscribers to Pursuant to section 157.9 of the Persons who wish to comment only
receive e-mail notification when a Commission’s rules, 18 CFR 157.9, on the environmental review of this
document is added to a subscribed within 90 days of this Notice the project should submit an original and
docket(s). For assistance with any FERC Commission staff will either: complete two copies of their comments to the
Online service, please e-mail its environmental assessment (EA) and Secretary of the Commission.
FERCOnlineSupport@ferc.gov, or call place it into the Commission’s public Environmental commentors will be
(866) 208–3676 (toll free). For TTY, call record (eLibrary) for this proceeding; or placed on the Commission’s
(202) 502–8659. issue a Notice of Schedule for environmental mailing list, will receive
Comment Date: 5 p.m. Eastern Time Environmental Review. If a Notice of copies of the environmental documents,
Schedule for Environmental Review is and will be notified of meetings
sroberts on PROD1PC70 with NOTICES

on June 22, 2007.


issued, it will indicate, among other associated with the Commission’s
Kimberly D. Bose, milestones, the anticipated date for the environmental review process.
Secretary. Commission staff’s issuance of the final Environmental commentors will not be
[FR Doc. E7–12178 Filed 6–22–07; 8:45 am] environmental impact statement (FEIS) required to serve copies of filed
BILLING CODE 6717–01–P or EA for this proposal. The filing of the documents on all other parties.

VerDate Aug<31>2005 23:08 Jun 22, 2007 Jkt 211001 PO 00000 Frm 00013 Fmt 4703 Sfmt 4703 E:\FR\FM\25JNN1.SGM 25JNN1
34676 Federal Register / Vol. 72, No. 121 / Monday, June 25, 2007 / Notices

However, the non-party commentors adjacent to the dam. In addition, the DEPARTMENT OF ENERGY
will not receive copies of all documents project boundary would include 2.32
filed by other parties or issued by the acres of National Forest System land Federal Energy Regulatory
Commission (except for the mailing of and 0.66 acre of U.S. Bureau of Land Commission
environmental documents issued by the Management land. [Project No. P–9988–015]
Commission) and will not have the right
This EA contains the Commission
to seek court review of the Augusta Canal Authority; Notice of
staff’s analysis of the potential future
Commission’s final order. Application Tendered for Filing With
The Commission strongly encourages environmental effects of the project.
the Commission, Soliciting Additional
electronic filings of comments, protests Staff has concluded that licensing the
Study Requests, and Establishing
and interventions in lieu of paper using project, with appropriate environmental
Procedural Schedule for Relicensing
the ‘‘eFiling’’ link at http:// protective measures, would not
and Deadline for Submission of Final
www.ferc.gov. Persons unable to file constitute a major federal action that Amendments
electronically should submit an original would significantly affect the quality of
and 14 copies of the protest or the human environment. June 15, 2007.
intervention to the Federal Energy A copy of the EA is available for Take notice that the following
Regulatory Commission, 888 First review at the Commission in the Public hydroelectric application has been filed
Street, NE., Washington, DC 20426. Reference Room or may be viewed on with the Commission and is available
This filing is accessible on-line at the Commission’s Web site at http:// for public inspection.
http://www.ferc.gov, using the a. Type of Application: New major
www.ferc.gov using the ‘‘eLibrary’’ link.
‘‘eLibrary’’ link and is available for license.
Enter the docket number excluding the b. Project No.: P–9988–015.
review in the Commission’s Public
last three digits in the docket number c. Date Filed: May 31, 2007.
Reference Room in Washington, DC.
field to access the document. For d. Applicant: Augusta Canal
There is an ‘‘eSubscription’’ link on the
assistance, contact FERC Online Authority.
Web site that enables subscribers to
receive e-mail notification when a Support at e. Name of Project: King Mill
document is added to a subscribed FERCOnlineSupport@ferc.gov Hydroelectric Project.
docket(s). For assistance with any FERC or toll-free at (866) 208–3676, or for f. Location: The King Mill Project is
Online service, please e-mail TTY, (202) 502–8659. located on the Augusta Canal about 6
FERCOnlineSupport@ferc.gov, or call You may also register online at http:// miles downstream of the Augusta
(866) 208–3676 (toll free). For TTY, call Diversion Dam, adjacent to the
www.ferc.gov/docs-filing/
(202) 502–8659. Savannah River, Richmond County,
esubscription.asp to be notified via e-
Comment Date: 5 p.m. Eastern Time Augusta, GA. The project does not affect
mail of new filings and issuances federal lands.
on July 6, 2007. related to this or other pending projects. g. Filed Pursuant to: Federal Power
Kimberly D. Bose, For assistance, contact FERC Online Act 16 U.S.C. 791 (a)–825(r).
Secretary. Support. h. Applicant Contact: Mr. Dayton
[FR Doc. E7–12184 Filed 6–22–07; 8:45 am] Any comments should be filed within Sherrouse, Executive Director, Augusta
BILLING CODE 6717–01–P 30 days from the date of this notice and Canal Authority, 1450 Green Street,
should be addressed to Kimberly D. Suite 400, Augusta, GA 30901;
Bose, Secretary, Federal Energy Telephone (706) 823–0440, Ext. 1.
DEPARTMENT OF ENERGY Regulatory Commission, 888 First i. FERC Contact: Sarah Florentino,
Street, NE., Washington, DC 20426. Telephone (202) 502–6863, or e-mail
Federal Energy Regulatory Please affix ‘‘Applegate Dam Project No. sarah.florentino@ferc.gov. Additional
Commission information on Federal Energy
11910–002’’ to all comments. Comments
Regulatory Commission (FERC)
[Project No. 11910–002 Oregon] may be filed electronically via the
hydroelectric projects is available on
Internet in lieu of paper. The
Applegate Dam; Notice of Availability FERC’s Web site: http://www.ferc.gov/
Commission strongly encourages
of Environmental Assessment industries/hydropower.asp.
electronic filings. See 18 CFR j. This application is not ready for
June 15, 2007. 385.2001(a)(1)(iii) and the instructions environmental analysis at this time.
In accordance with the National on the Commission’s Web site (http:// k. Cooperating agencies: We are
Environmental Policy Act of 1969 and www.ferc.gov) under the ‘‘e-filing’’ link. asking Federal, State, local, and tribal
Federal Energy Regulatory Commission Please contact Tim Looney by agencies with jurisdiction and/or
(Commission) regulations, 18 CFR Part telephone at (202) 502–6096 or by e- special expertise with respect to
380 (Order No. 486, 52 FR 47897), mail at Timothy.Looney@ferc.gov if you environmental issues to cooperate with
Office of Energy Projects staff have have any questions. us in the preparation of the
reviewed Symbiotics, LLC’s application environmental document. Agencies who
for the proposed Applegate Dam Project Kimberly D. Bose, would like to request cooperating status
and prepared this environmental Secretary. should follow the instructions for filing
assessment (EA). The proposed project [FR Doc. E7–12191 Filed 6–22–07; 8:45 am] such requests described in item m
would be located at the existing U.S. BILLING CODE 6717–01–P below. Cooperating agencies should
Army Corps of Engineers’ (Corps) note the Commission’s policy that
Applegate dam located at river mile 45.7 agencies that cooperate in the
sroberts on PROD1PC70 with NOTICES

on the Applegate River, near the town preparation of the environmental


of Medford, in Jackson County, Oregon. document cannot also intervene. See, 94
The proposed project facilities would FERC ¶ 61,076 (2001).
occupy 7.1 acres of federal land l. Pursuant to Section 4.32(b)(7) of 18
administered by the Corps below and CFR of the Commission’s regulations, if

VerDate Aug<31>2005 23:08 Jun 22, 2007 Jkt 211001 PO 00000 Frm 00014 Fmt 4703 Sfmt 4703 E:\FR\FM\25JNN1.SGM 25JNN1

You might also like