You are on page 1of 2

33220 Federal Register / Vol. 72, No.

115 / Friday, June 15, 2007 / Notices

project and to provide a final project Are There Changes in the Estimates and Watershed Improvement,
report summarizing outcomes and major From the Last Approval? Bitterroot National Forest, Darby
findings of each project. EPA’s policy on There is an increase of 2292 hours in Ranger District, Ravalli County, MT.
performance measurement in assistance the total estimated respondent burden Summary: EPA supports project
agreements is an implementation compared with that identified in the ICR objectives to improve watersheds,
outcome under the Government currently approved by OMB. This reduce fire risk, improve vegetative
Performance and Results Act (GPRA increase reflects the need to collect resiliency, conduct fuel reduction
section 1115(a)(4) and section 1116(c)). information on project performance and research, and provide timber. However,
EPA’s innovation piloting efforts are outcomes in the form of quarterly EPA expressed environmental concerns
multi-media in nature and include reporting and final project reporting for about potential impacts to water quality.
programs authorized under the full current and future projects that is not Rating EC2.
range of authorizing legislation (e.g., the addressed in other ICRs. EIS No. 20070150, ERP No. D–FRC–
Clean Air Act, Section 103(b)(3) (42 F03010–WI, Gurardian Expansion and
U.S.C. 7403(b)(3)) the Clean Water Act, What Is the Next Step in the Process for Extension Project, Construction and
Section 104(b)(3) (33 U.S.C. 1254(b)(3)); This ICR? Operation Natural Gas Pipeline
the Solid Waste Disposal Act, Section EPA will consider the comments Facilities, Jefferson, Dodge, Fond du
8001 (42 U.S.C. 6981); the Toxics received and amend the ICR as Lac, Calument, Brown, Walworth,
Substances Control Act, Section 10 (15 appropriate. The final ICR package will Outagamie Counties, WI.
U.S.C. 2609); the Federal Insecticide, then be submitted to OMB for review Summary: EPA expressed
Fungicide, and Rodenticide Act, Section and approval pursuant to 5 CFR environmental concern about water
20 (7 U.S.C. 136r); and the Safe Drinking 1320.12. At that time, EPA will issue quality and wetland impacts and
Water Act, Sections 1442(a) and (c) (42 another Federal Register notice requested additional analysis and
U.S.C. 1(a) and (c)). pursuant to 5 CFR 1320.5(a)(1)(iv) to mitigation for these impacts. Rating
announce the submission of the ICR to EC2.
Burden Statement: The annual public OMB and the opportunity to submit
reporting and recordkeeping burden for EIS No. 20070152, ERP No. D–GSA–
additional comments to OMB. If you F60010–OH, Cincinnati National
this collection of information is have any questions about this ICR or the
estimated to average 44 hours per Institute for Occupational Safety and
approval process, please contact the Health (NIOSH) Laboratories
response. Burden means the total time, technical person listed under FOR
effort, or financial resources expended Consolidation, Site Selection,
FURTHER INFORMATION CONTACT. Hamilton and Clermont Counties, OH.
by persons to generate, maintain, retain,
Dated: May 24, 2007. Summary: EPA expressed
or disclose or provide information to or
for a Federal agency. This includes the Elizabeth A. Shaw, environmental concerns about air
time needed to review instructions; Director, Office of Environmental Policy quality impacts, and water quality/
develop, acquire, install, and utilize Innovation. wetland impacts, and requested
technology and systems for the purposes [FR Doc. E7–11577 Filed 6–14–07; 8:45 am] additional information on mitigation.
of collecting, validating, and verifying BILLING CODE 6560–50–P Rating EC2.
information, processing and Final EISs
maintaining information, and disclosing
ENVIRONMENTAL PROTECTION EIS No. 20070142, ERP No. F–BLM–
and providing information; adjust the J01081–WY, Maysdorf Coal Lease by
AGENCY
existing ways to comply with any Application (LBA) Tract, (Federal
previously applicable instructions and [ER–FRL–6688–1]
Coal Application WYW154432),
requirements which have subsequently Implementation, Campbell Counties,
changed; train personnel to be able to Environmental Impact Statements and
Regulations; Availability of EPA WY.
respond to a collection of information;
Comments Summary: No formal comment letter
search data sources; complete and
was sent to the preparing agency.
review the collection of information; Availability of EPA comments
and transmit or otherwise disclose the EIS No. 20070163, ERP No. F–BLM–
prepared pursuant to the Environmental L65518–ID, Eastside Township Fuels
information. Review Process (ERP), under section and Vegetation Project, Address the
The ICR provides a detailed 309 of the Clean Air Act and Section Forest Health, Fuels, Safety, and
explanation of the Agency’s estimate, 102(2)(c) of the National Environmental Watershed Issues, Elk City, Idaho
which is only briefly summarized here: Policy Act as amended. County, ID.
Requests for copies of EPA comments
Estimated total number of potential Summary: EPA continues to have
can be directed to the Office of Federal
annual respondents: 1270. environmental concerns about the
Activities at 202–564–7167. An
Frequency of response: 35 quarterly; explanation of the ratings assigned to project due to impacts of short term
1234 annually. draft environmental impact statements sediment loading listed streams.
Estimated total average number of (EISs) was published in F.R. dated April EIS No. 20070166, ERP No. F–AFS–
responses for each respondent: 1.2. 6, 2007 (72 FR 17156). L65498–ID, Newsome Creek
Watershed Rehabilitation, Stream
Estimated total annual burden hours: Draft EISs Restoration and Improvement and
7748 hours. EIS No. 20070147, ERP No. D–AFS– Decommissioning of Roads, Red River
Estimated total annual costs: J65479–MT, Trapper Bunk House Ranger District, Nez Perce National
jlentini on PROD1PC65 with NOTICES

$331,460. This includes an estimated Land Stewardship Project, Reduce Forest, Idaho County, ID.
burden cost of $331,460 and an Risk from Stand-Replacing and Summary: EPA continues to have
estimated cost of $0 for capital Uncontrollable Fires, Improve environmental concerns about mercury
investment or maintenance and Resiliency and Provide Forest contamination impacts from past
operational costs. Products, Fuel Reduction Research mining practices which could pose a

VerDate Aug<31>2005 19:26 Jun 14, 2007 Jkt 211001 PO 00000 Frm 00030 Fmt 4703 Sfmt 4703 E:\FR\FM\15JNN1.SGM 15JNN1
Federal Register / Vol. 72, No. 115 / Friday, June 15, 2007 / Notices 33221

threat to human health, fish and aquatic Weekly receipt of Environmental Impact EIS No. 20070239, Draft EIS, AFS, CA,
biota. The Record of Decision should Statements Sugarberry Project, Proposes to
include data on levels of mercury Filed 06/04/2007 Through 06/08/2007 Protect Rural Communities from Fire
contamination in the project area and Pursuant to 40 CFR 1506.9. Hazards by Constructing Fuel Breaks
mitigation measures. EIS No. 20070232, Final EIS, FHW, 00, Known as Defensible Fuel Profile
EIS No. 20070170, ERP No. F–NPS– Bellevue Bridge Study, To Improve Zones (DFPZs), Feather River Ranger
E65081–FL, Castillo de San Marcos Connectivity between the Omaha District, Plumas National Forest,
National Monument, General Metropolitan Area and across the Plumas, Sierra, Yuba Counties, CA,
Management Plan, Implementation, Missouri River from U.S. 75 to I–29, Comment Period Ends: 07/30/2007,
City of St. Augustine, St. Johns Coast Guard Permit, NPDES Permit, Contact: John Zarlengo 530–534–
County, FL. U.S. Army COE Section 10 and 404 6500.
Summary: EPA does not object to the Permits, Mills County, IA and Sarp EIS No. 20070240, Final EIS, AFS, 00,
action as proposed. EIS No. 20070173, County, NE., Wait Period Ends: 07/24/ Northern Rockies Lynx Management
ERP No. F–COE–E36184–FL, Central 2007, Contact: Philip Barnes 515– Direction, Selected Alternative F,
and Southern Florida Project, New 233–7300. Conservation and Promote Recovery
Authorization for Broward County EIS No. 20070233, Final EIS, NPS, CO, of the Canada Lynx, NFS and BLM to
Water Preserve Areas, South Florida Great Sand Dunes National and Amend Land Resource Management
Water Management District (SFWMD), Preserve. General Management Plan/ Plans for 18 National Forests (NF),
Comprehensive Everglades Restoration Wilderness Study, Implementation, MT, WY, UT, and ID, Wait Period
Plan, (CERP), Broward County, FL. Alamos and Saguache Counties, CO, Ends: 07/16/2007, Contact: Raymond
Wait Period Ends: 07/16/2007, Smith 406–329–3316.
Summary: EPA’s previous concerns
have been resolved; therefore, EPA does Contact: Suzanne M. Stutzman 303– EIS No. 20070241, Draft EIS, NPS, 00,
not object to the proposed action. 987–6671. Quarry Visitor Center Treatment
Project, To Address the Structural
EIS No. 20070178, ERP No. F–AFS– EIS No. 20070234, Draft EIS, FHW, TX,
Deterioration, Dinosaur National
J65465–00, Kootenai National Forest U.S. 290 Corridor, Propose to
Monument, CO and UT, Comment
Invasive Plant Management, Proposes Construct Roadway Improvements
Period Ends: 08/10/2007, Contact:
to Manage Noxious Weed and from Farm-to-Market (FM) 2920 to
Tom Thomas 303–969–2310.
Invasive Plant Species, Lincoln Interstate Highway (IH) 610, Funding
and Right-of-Way Grant, Harris EIS No. 20070242, Final EIS, COE, OH,
Sanders, Flathead Counties, MT and
County, TX, Comment Period Ends: Dover Dam Safety Assurance Program
Bonner and Boundary Counties, ID.
08/03/2007, Contact: Donald E. Davis Project, Modifications and Upgrades,
Summary: EPA supports the Funding, Muskingum River Basin,
integrated weed management program; 512–536–5960.
Tuscarawas County, OH, Wait Period
however, we continue to suggest the EIS No. 20070235, Final EIS, BLM, CA, Ends: 07/16/2007, Contact: Rodney G.
need for adequate mitigation measures Alturas Field Office Project, Resource Cremeans 304–399–5170.
during herbicide applications which Management Plan, Implementation,
EIS No. 20070243, Draft EIS, AFS, WY,
could potentially adversely impact Alturas Field Office Project, Resource
Thunder Basin Analysis Area
water quality and aquatic resources. Management Plan, Implementation,
Vegetation Management, To
EIS No. 20070198, ERP No. F–HUD– Lassen, Modoc, Shasta and Siskiyou
Implement Best Management Grazing
L85028–WA, Westpark Counties, CA, Wait Period Ends:
Practices and Activities, Douglas
Redevelopment Master Plan, 07/16/2007, Contact: Sue Noggles
Ranger District, Medicine Bow-Routt
Redevelop of 82-acre Site to create a 530–252–5345. National Forests and Thunder Basin
Mixed-Use, Mixed-Income Pedestrian- EIS No. 20070236, Final EIS, BLM, 00, National Grassland, Campbell,
Oriented Urban Community, Funding Eagle Lake Field Office Project, Converse and Weston Counties, WY,
and US Army COE Section 10 Permit, Resource Management Plan, Comment Period Ends: 07/30/2007,
City of Bremerton, Kitsap County, Implementation, Lassen, Plumas, Contact: Kyle Schmitt 307–358–4690.
WA. Sierra Counties, CA and Washoe EIS No. 20070244, Final EIS, FRC, 00,
Summary: No formal comment letter County, NV, Wait Period Ends: 07/16/ North Baja Pipeline Expansion
was sent to the preparing agency. 2007, Contact: Sue Noggles 530–252– Project, Docket Nos. CP06–61–000
Dated: 06/11/2007.
5345. and CP01–23–000, Construction and
Robert W. Hargrove, EIS No. 20070237, Final EIS, BLM, 00, Operation a Natural Gas Pipeline
Surprise Field Office Project, System, Land Use Plan Amendment,
Director, NEPA Compliance Division, Office
of Federal Activities. Resource Management Plan, Right-of-Way Grant, Temporary Use
Implementation, Cedarville, Modoc Permits and U.S. Army COE Section
[FR Doc. E7–11575 Filed 6–14–07; 8:45 am]
and Lassen, CA and Washoe and 10 and 404 Permits, La Paz County,
BILLING CODE 6560–50–P
Humboldt Counties, NV, Wait Period AZ and Riverside and Imperial
Ends: 07/16/2007 Contact: Sue Counties, CA, Wait Period Ends:
ENVIRONMENTAL PROTECTION Noggles 530–252–5345. 07/16/2007, Contact: Andy Black 1–
AGENCY EIS No. 20070238, Draft EIS, AFS, 00, 866–208–3372.
Mt. Ashland Late-Successional EIS No. 20070245, Final EIS, FHW, NY,
[ER–FRL–6687–9] Reserve Habitat Restoration and Fuels Long Island Expressway (LIE) Rest
Reduction Project, To Promote and Area Upgrade Project, Upgrading the
Environmental Impacts Statements;
Maintain Late-Successional Habitat, Existing Rest Area from Route 1–495/
Notice of Availability
jlentini on PROD1PC65 with NOTICES

Oak Ranger District, Klamath National Long Island Expressway between


Responsible Agency: Office of Federal Forest, Siskiyou County, CA and Exits 51 and 52, Funding, Town of
Activities, General Information 202– Jackson County, OR, Comment Period Huntington, Suffolk County, NY, Wait
564–7167 or http://www.epa.gov/ Ends: 07/30/2007, Contact: Susan Period Ends: 07/16/2007, Contact:
compliance/nepa/. Stresser 530–841–4538. Robert Arnold 578–431–4127.

VerDate Aug<31>2005 19:26 Jun 14, 2007 Jkt 211001 PO 00000 Frm 00031 Fmt 4703 Sfmt 4703 E:\FR\FM\15JNN1.SGM 15JNN1

You might also like