25298 Federal Register / Vol. 72, No.

86 / Friday, May 4, 2007 / Notices

and government entities interested in DEPARTMENT OF ENERGY of Reclamation’s Gibson Dam and
and/or potentially affected by the operated in a run-of-river mode, would
proposed project. This includes all Federal Energy Regulatory consist of: (1) Two proposed 300-foot-
landowners who are potential right-of- Commission long, steel penstocks, (2) a powerhouse
way grantors, whose property may be [ Project No. 12478–001] containing two generating units having
used temporarily for project purposes, a total installed capacity of 15
or who own homes within distances Dam Hydroelectric Company, LLC; megawatts, (3) A proposed 34.5 kilovolt
defined in the Commission’s regulations Notice of Application Accepted for underground transmission line, and (4)
of certain aboveground facilities. By this Filing and Soliciting Motions To appurtenant facilities. The Gibson Dam
Intervene, Protests, and Comments Hydroelectric Company, LLC project
notice we are also asking governmental
would have an average annual
agencies, especially those in Appendix April 27, 2007. generation of 50 gigawatt-hours.
2, to express their interest in becoming Take notice that the following l. This filing is available for review at
cooperating agencies for the preparation hydroelectric application has been filed the Commission in the Public Reference
of the EA. with the Commission and is available Room or may be viewed on the
for public inspection: Commission’s Web site at http://
Additional Information a. Type of Application: Preliminary www.ferc.gov using the ‘‘eLibrary’’ link.
Additional information about the Permit. Enter the docket number excluding the
project is available from the b. Project No.: 12478–001. last three digits in the docket number
c. Date filed: April 3, 2007. field to access the document. For
Commission’s Office of External Affairs, d. Applicant: Gibson Dam
at 1–866–208-FERC or on the FERC assistance, call toll-free 1–866–208–
Hydroelectric Company, LLC. 3676 or e-mail
Internet Web site (http://www.ferc.gov) e. Name of Project: Gibson Dam
using the eLibrary link. Click on the FERCONLINESUPPORT@FERC.GOV.
Project.
eLibrary link, click on ‘‘General Search’’ f. Location: North Fork Sun Fork in For TTY, call (202) 502–8659. A copy is
and enter the docket number excluding Teton and Lewis and Clark Counties, also available for inspection and
Montana. It would use the U.S. Bureau reproduction at the address in item h
the last three digits in the Docket
of Reclamation’s Gibson Dam. above.
Number field. Be sure you have selected m. Competing Preliminary Permit—
an appropriate date range. For g. Filed Pursuant to: Federal Power
Act, 16 USC. 791(a)–825(r). Anyone desiring to file a competing
assistance, please contact FERC Online application for preliminary permit for a
Support at FercOnlineSupport@ferc.gov h. Applicant Contact: Mr. Steven C.
Marmon, Project Manager, Gibson Dam proposed project must submit the
or toll free at 1–866–208–3676, or for competing application itself, or a notice
Hydroelectric Company, LLC, 3633
TTY, contact (202) 502–8659. The of intent to file such an application, to
Alderwood Avenue, Bellingham, WA
eLibrary link also provides access to the the Commission on or before the
98225, (360) 738–9999.
texts of formal documents issued by the i. FERC Contact: Robert Bell, (202) specified comment date for the
Commission, such as orders, notices, 502–4126. particular application (see 18 CFR 4.36).
and rulemakings. j. Deadline for filing comments, Submission of a timely notice of intent
In addition, the Commission now protests, and motions to intervene: 60 allows an interested person to file the
offers a free service called eSubscription days from the issuance date of this competing preliminary permit
notice. application no later than 30 days after
which allows you to keep track of all
All documents (original and eight the specified comment date for the
formal issuances and submittals in
copies) should be filed with: Kimberly particular application. A competing
specific dockets. This can reduce the preliminary permit application must
D. Bose, Secretary, Federal Energy
amount of time you spend researching conform with 18 CFR 4.30(b) and 4.36.
Regulatory Commission, 888 First
proceedings by automatically providing n. Competing Development
Street, NE., Washington, DC 20426.
you with notification of these filings, Comments, protests, and interventions Application—Any qualified
document summaries and direct links to may be filed electronically via the development applicant desiring to file a
the documents. Go to http:// Internet in lieu of paper; see 18 CFR competing development application
www.ferc.gov/esubscribenow.htm. 385.2001(a)(1)(iii) and the instructions must submit to the Commission, on or
Finally, public meetings or site visits on the Commission’s web site under the before a specified comment date for the
will be posted on the Commission’s ‘‘e-Filing’’ link. The Commission particular application, either a
calendar located at http://www.ferc.gov/ strongly encourages electronic filings. competing development application or a
EventCalendar/EventsList.aspx along Please include the project number (P– notice of intent to file such an
12748–001) on any comments or application. Submission of a timely
with other related information.
motions filed. notice of intent to file a development
Philis J. Posey, The Commission’s Rules of Practice application allows an interested person
Deputy Secretary. and Procedure require all intervenors to file the competing application no
[FR Doc. E7–8535 Filed 5–3–07; 8:45 am] filing documents with the Commission later than 120 days after the specified
to serve a copy of that document on comment date for the particular
BILLING CODE 6717–01–P
each person in the official service list application. A competing license
for the project. Further, if an intervenor application must conform with 18 CFR
files comments or documents with the 4.30(b) and 4.36.
Commission relating to the merits of an o. Notice of Intent—A notice of intent
issue that may affect the responsibilities must specify the exact name, business
pwalker on PROD1PC71 with NOTICES

of a particular resource agency, they address, and telephone number of the


must also serve a copy of the document prospective applicant, and must include
on that resource agency. an unequivocal statement of intent to
k. Description of Project: The submit, if such an application may be
proposed project using the U.S. Bureau filed, either a preliminary permit

VerDate Aug<31>2005 20:12 May 03, 2007 Jkt 211002 PO 00000 Frm 00057 Fmt 4703 Sfmt 4703 E:\FR\FM\04MYN1.SGM 04MYN1
Federal Register / Vol. 72, No. 86 / Friday, May 4, 2007 / Notices 25299

application or a development filing comments, it will be presumed to encourages electronic filings. See 18
application (specify which type of have no comments. One copy of an CFR 385.2001(a)(1)(iii) and the
application). A notice of intent must be agency’s comments must also be sent to instructions on the Commission’s Web
served on the applicant(s) named in this the Applicant’s representatives. site (http://www.ferc.gov) under the
public notice. ‘‘eFiling’’ link.
p. Proposed Scope of Studies Under Kimberly D. Bose, k. This application has been accepted
Permit—A preliminary permit, if issued, Secretary. for filing, but is not ready for
does not authorize construction. The [FR Doc. E7–8520 Filed 5–3–07; 8:45 am] environmental analysis at this time.
term of the proposed preliminary permit BILLING CODE 6717–01–P l. Description of Project: The Ice
would be 36 months. The work House Power Project would consist of
proposed under the preliminary permit the following existing facilities: (1) The
would include economic analysis, DEPARTMENT OF ENERGY 300-foot-long, 10-foot-high Ice House
preparation of preliminary engineering Dam consisting of a 210-foot-long
plans, and a study of environmental Federal Energy Regulatory spillway topped with flashboards; (2) a
impacts. Based on the results of these Commission 137-acre reservoir with a normal full
studies, the Applicant would decide [Project No. 12769–000] pond elevation of 215 feet National
whether to proceed with the preparation Geodetic Vertical Datum; (3) a 50-foot-
of a development application to Ice House Partners, Inc.; Notice of wide, 600-foot-long power canal; (4) a
construct and operate the project. Application Accepted for Filing and restored powerhouse containing two
q. Comments, Protests, or Motions to Soliciting Motions To Intervene and generating units with a total installed
Intervene—Anyone may submit Protests capacity of 270 kilowatts; and (5)
comments, a protest, or a motion to appurtenant facilities. The project
intervene in accordance with the April 27, 2007. would have an average annual
requirements of Rules of Practice and Take notice that the following generation of 2,500 megawatt-hours.
Procedure, 18 CFR 385.210, .211, .214. hydroelectric application has been filed m. A copy of the filing is available for
In determining the appropriate action to with the Commission and is available review at the Commission in the Public
take, the Commission will consider all for public inspection. Reference Room or may be viewed on
protests or other comments filed, but a. Type of Application: Exemption the Commission’s Web site at http://
only those who file a motion to from Licensing. www.ferc.gov using the ‘‘eLibrary’’ link.
intervene in accordance with the b. Project No.: 12769–000. Enter the docket number excluding the
Commission’s Rules may become a c. Date filed: January 22, 2007. last three digits in the docket number
party to the proceeding. Any comments, d. Applicant: Ice House Partners, Inc. field to access the document. For
protests, or motions to intervene must e. Name of Project: Ice House Power assistance, contact FERC Online
be received on or before the specified Project. Support at
comment date for the particular f. Location: On the Nashua River, in FERCOnlineSupport@ferc.gov or toll-
application. the Town of Ayer, Middlesex County, free at 1–866–208–3676, or for TTY,
r. Filing and Service of Responsive Massachusetts. The project would use (202) 502–8659. A copy is also available
Documents—Any filings must bear in Federal land. for inspection and reproduction at the
all capital letters the title g. Filed Pursuant to: Public Utility address in item h above.
‘‘COMMENTS’’, ‘‘NOTICE OF INTENT Regulatory Policies Act of 1978, 16 You may also register online at http://
TO FILE COMPETING APPLICATION’’, U.S.C. sections 2705 and 2708. www.ferc.gov/docs-filing/
‘‘COMPETING APPLICATION’’, h. Applicant Contact: Liisa Dowd, Ice esubscription.asp to be notified via e-
‘‘PROTEST’’, and ‘‘MOTION TO House Partners, Inc., 323 West Main mail of new filings and issuances
INTERVENE’’, as applicable, and the Street, Ayer, MA 01432, (978) 772–3303. related to this or other pending projects.
Project Number of the particular i. FERC Contact: Tom Dean, (202) For assistance, contact FERC Online
application to which the filing refers. 502–6041. Support.
Any of the above-named documents j. Deadline for filing motions to n. Anyone may submit a protest or a
must be filed by providing the original intervene and protests: 60 days from the motion to intervene in accordance with
and the number of copies provided by issuance date of this notice. the requirements of Rules of Practice
the Commission’s regulations to: The All documents (original and eight and Procedure, 18 CFR 385.210,
Secretary, Federal Energy Regulatory copies) should be filed with: Kimberly 385.211, and 385.214. In determining
Commission, 888 First Street, NE., D. Bose, Secretary, Federal Energy the appropriate action to take, the
Washington, DC 20426. An additional Regulatory Commission, 888 First Commission will consider all protests
copy must be sent to Director, Division Street, NE., Washington, DC 20426. filed, but only those who file a motion
of Hydropower Administration and The Commission’s Rules of Practice to intervene in accordance with the
Compliance, Federal Energy Regulatory require all intervenors filing documents Commission’s Rules may become a
Commission, at the above-mentioned with the Commission to serve a copy of party to the proceeding. Any protests or
address. A copy of any notice of intent, that document on each person on the motions to intervene must be received
competing application or motion to official service list for the project. on or before the specified deadline date
intervene must also be served upon each Further, if an intervenor files comments for the particular application.
representative of the Applicant or documents with the Commission All filings must: (1) Bear in all capital
specified in the particular application. relating to the merits of an issue that letters the title ‘‘PROTEST’’ or
s. Agency Comments—Federal, state, may affect the responsibilities of a ‘‘MOTION TO INTERVENE;’’ (2) set
and local agencies are invited to file particular resource agency, they must forth in the heading the name of the
pwalker on PROD1PC71 with NOTICES

comments on the described application. also serve a copy of the document on applicant and the project number of the
A copy of the application may be that resource agency. application to which the filing
obtained by agencies directly from the Motions to intervene and protests may responds; (3) furnish the name, address,
Applicant. If an agency does not file be filed electronically via the Internet in and telephone number of the person
comments within the time specified for lieu of paper. The Commission strongly protesting or intervening; and (4)

VerDate Aug<31>2005 20:12 May 03, 2007 Jkt 211002 PO 00000 Frm 00058 Fmt 4703 Sfmt 4703 E:\FR\FM\04MYN1.SGM 04MYN1