Federal Register / Vol. 72, No.

85 / Thursday, May 3, 2007 / Notices 24579

also states that by adding compression DEPARTMENT OF ENERGY Commission’s Public Reference Room,
on the southern portion of its mainline, 888 First Street, NE., Washington, DC
it can accommodate up to an additional Federal Energy Regulatory 20426. The Order may also be viewed
45,000 Mcf/d of natural gas on a Commission on the Commission’s Web site at http://
sustainable firm basis for southern [Docket Nos. ER07–594–000] www.ferc.gov, using the eLibrary link.
deliveries in order to bring this Enter the docket number excluding the
additional production to market. MIGC Pirin Solutions, LLC; Notice of last three digits in the docket number
estimates that it would cost $3,862,400 Issuance of Order filed to access the document.
to construct the proposed Python Comments, protests, and interventions
April 26, 2007. may be filed electronically via the
compressor station. MIGC would Pirin Solutions, LLC (Pirin) filed an
finance the proposed construction with internet in lieu of paper. See, 18 CFR
application for market-based rate 385.2001(a)(1)(iii) and the instructions
available funds and/or short-term authority, with an accompanying rate on the Commission’s Web site under the
borrowings. schedule. The proposed market-based ‘‘e-Filing’’ link. The Commission
Any questions concerning this rate schedule provides for the sale of strongly encourages electronic filings.
application may be directed to Nancy energy, capacity and ancillary services
Garfield, Senior Commercial at market-based rates. Pirin also Kimberly D. Bose,
Development Representative, MIGC, requested waivers of various Secretary.
Inc., 1099 18th Street, Suite 1200, Commission regulations. In particular, [FR Doc. E7–8406 Filed 5–2–07; 8:45 am]
Denver, Colorado, or telephone 303– Pirin requested that the Commission BILLING CODE 6717–01–P

252–6186. grant blanket approval under 18 CFR


Part 34 of all future issuances of
This filing is available for review at securities and assumptions of liability DEPARTMENT OF ENERGY
the Commission or may be viewed on by Pirin.
the Commission’s Web site at http:// On April 24, 2007, pursuant to Federal Energy Regulatory
www.ferc.gov, using the ‘‘eLibrary’’ link. delegated authority, the Director, Commission
Enter the docket number excluding the Division of Tariffs and Market [Docket No. RP07–405–000]
last three digits in the docket number Development—West, granted the
filed to access the document. For requests for blanket approval under Part Williston Basin Interstate Pipeline
assistance, please contact FERC Online 34 (Director’s Order). The Director’s Company; Notice of Tariff Filing
Support at FERC Order also stated that the Commission
would publish a separate notice in the April 26, 2007.
OnlineSupport@ferc.gov or call toll-free
Federal Register establishing a period of Take notice that on April 23, 2007,
at (866) 206–3676, or, for TTY, contact
time for the filing of protests. Williston Basin Interstate Pipeline
(202) 502–8659. Comments, protests and
Accordingly, any person desiring to be Company (Williston Basin) tendered for
interventions may be filed electronically
heard concerning the blanket approvals filing to become a part of its FERC Gas
via the Internet in lieu of paper. See, 18 Tariff, Second Revised Volume No. 1,
CFR 385.2001(a)(1)(iii) and the of issuances of securities or assumptions
of liability by Pirin should file a protest Fourteenth Revised Sheet No. 375, to
instructions on the Commission’s Web become effective April 23, 2007:
with the Federal Energy Regulatory
site under the ‘‘e-Filing’’ link. The Williston Basin has revised the above-
Commission, 888 First Street, NE.,
Commission strongly encourages referenced tariff sheet found in Section
Washington, DC 20426, in accordance
intervenors to file electronically. with Rules 211 and 214 of the 48 of the General Terms and Conditions
Any person or the Commission’s staff Commission’s Rules of Practice and of its FERC Gas Tariff, Second Revised
may, within 60 days after issuance of Procedure. 18 CFR 385.211, 385.214 Volume No. 1 (Tariff), to rename Point
the instant notice by the Commission, (2004). ID No. 04840 (Kinder Morgan-Billy
file pursuant to Rule 214 of the Notice is hereby given that the Creek) to Point ID No. 4840 (SourceGas-
Commission’s Procedural Rules (18 CFR deadline for filing protests is May 24, Billy Creek).
385.214) a motion to intervene or notice 2007. Any person desiring to intervene or to
of intervention and pursuant to section Absent a request to be heard in protest this filing must file in
opposition to such blanket approvals by accordance with Rules 211 and 214 of
157.205 of the regulations under the
the deadline above, Pirin is authorized the Commission’s Rules of Practice and
NGA (18 CFR 157.205), a protest to the
to issue securities and assume Procedure (18 CFR 385.211 and
request. If no protest is filed within the 385.214). Protests will be considered by
time allowed therefore, the proposed obligations or liabilities as a guarantor,
indorser, surety, or otherwise in respect the Commission in determining the
activity shall be deemed to be appropriate action to be taken, but will
of any security of another person;
authorized effective the day after the not serve to make protestants parties to
provided that such issuance or
time allowed for filing a protest. If a assumption is for some lawful object the proceeding. Any person wishing to
protest is filed and not withdrawn within the corporate purposes of Pirin, become a party must file a notice of
within 30 days after the allowed time compatible with the public interest, and intervention or motion to intervene, as
for filing a protest, the instant request is reasonably necessary or appropriate appropriate. Such notices, motions, or
shall be treated as an application for for such purposes. protests must be filed in accordance
authorization pursuant to section 7 of The Commission reserves the right to with the provisions of Section 154.210
the NGA. require a further showing that neither of the Commission’s regulations (18 CFR
cprice-sewell on PROD1PC66 with NOTICES

public nor private interests will be 154.210). Anyone filing an intervention


Kimberly D. Bose,
adversely affected by continued or protest must serve a copy of that
Secretary. approvals of Pirin’s issuance of document on the Applicant. Anyone
[FR Doc. E7–8412 Filed 5–2–07; 8:45 am] securities or assumptions of liability. filing an intervention or protest on or
BILLING CODE 6717–01–P Copies of the full text of the Director’s before the intervention or protest date
Order are available from the need not serve motions to intervene or

VerDate Aug<31>2005 16:26 May 02, 2007 Jkt 211001 PO 00000 Frm 00022 Fmt 4703 Sfmt 4703 E:\FR\FM\03MYN1.SGM 03MYN1
24580 Federal Register / Vol. 72, No. 85 / Thursday, May 3, 2007 / Notices

protests on persons other than the i. FERC Contact: Dianne Rodman, for inspection and reproduction at the
Applicant. (202) 502–6077, address in item h above.
The Commission encourages dianne.rodman@ferc.gov. You may also register online at http://
electronic submission of protests and j. Deadline for filing motions to www.ferc.gov/docs-filing/
interventions in lieu of paper using the intervene and protests: 60 days from the esubscription.asp to be notified via e-
‘‘eFiling’’ link at http://www.ferc.gov. issuance date of this notice. mail of new filings and issuances
Persons unable to file electronically All documents (original and eight related to this or other pending projects.
should submit an original and 14 copies copies) should be filed with: Kimberly For assistance, contact FERC Online
of the protest or intervention to the D. Bose, Secretary, Federal Energy Support.
Federal Energy Regulatory Commission, Regulatory Commission, 888 First n. Any qualified applicant desiring to
888 First Street, NE., Washington, DC Street, NE., Washington, DC 20426. file a competing application must
20426. The Commission’s Rules of Practice submit to the Commission, on or before
This filing is accessible on-line at and Procedures require all intervenors the specified deadline date for the
http://www.ferc.gov, using the filing documents with the Commission particular application, a competing
‘‘eLibrary’’ link and is available for to serve a copy of that document on development application, or a notice of
review in the Commission’s Public each person on the official service list intent to file such an application.
Reference Room in Washington, DC. for the project. Further, if an intervenor Submission of a timely notice of intent
There is an ‘‘eSubscription’’ link on the files comments or documents with the allows an interested person to file the
Web site that enables subscribers to Commission relating to the merits of an competing development application no
receive e-mail notification when a issue that may affect the responsibilities later than 120 days after the specified
document is added to a subscribed of a particular resource agency, they deadline date for the particular
docket(s). For assistance with any FERC must also serve a copy of the document application. Applications for
Online service, please e-mail preliminary permits will not be
on that resource agency.
FERCOnlineSupport@ferc.gov, or call accepted in response to this notice.
Motions to intervene and protests may A notice of intent must specify the
(866) 208–3676 (toll free). For TTY, call be filed electronically via the Internet in
(202) 502–8659. exact name, business address, and
lieu of paper. The Commission strongly telephone number of the prospective
Kimberly D. Bose, encourages electronic filings. See 18 applicant, and must include an
Secretary. CFR 385.2001(a)(1)(iii) and the unequivocal statement of intent to
[FR Doc. E7–8411 Filed 5–2–07; 8:45 am] instructions on the Commission’s Web submit, if such an application may be
BILLING CODE 6717–01–P
site (http://www.ferc.gov) under the ‘‘e- filed, either a preliminary permit
Filing’’ link. application or a development
k. This application has been accepted application (specify which type of
DEPARTMENT OF ENERGY for filing, but is not ready for application). A notice of intent must be
environmental analysis at this time. served on the applicant named in this
Federal Energy Regulatory l. The proposed project would utilize public notice.
Commission the Bureau of Reclamation’s existing Anyone may submit a protest or a
[Project No. 12429–001] Clark Canyon dam, and would consist of motion to intervene in accordance with
the following new facilities: (1) A steel the requirements of Rules of Practice
Clark Canyon Hydro, LLC; Notice of liner in the existing 9-foot-diameter and Procedure, 18 CFR 385.210,
Application Accepted for Filing and concrete outlet conduit; (2) a new outlet 385.211, and 385.214. In determining
Soliciting Motions To Intervene and gate structure; (3) a 9-foot-diameter steel the appropriate action to take, the
Protests penstock bifurcating into an 8-foot Commission will consider all protests
diameter and a 6-foot diameter steel filed, but only those who file a motion
April 26, 2007. penstock directing flow to the turbine to intervene in accordance with the
Take notice that the following units about 70 feet from the bifurcation; Commission’s Rules may become a
hydroelectric application has been filed (4) a powerhouse containing two party to the proceeding. Any protests or
with the Commission and is available generating units with a combined motions to intervene must be received
for public inspection. capacity of 4.75 megawatts; (5) a 300-
a. Type of Application: Major License. on or before the specified deadline date
foot-long access road; (6) a switchyard; for the particular application.
b. Project No.: 12429–001.
c. Date filed: August 1, 2006. (7) a substation; and (8) about 0.3 mile When the application is ready for
d. Applicant: Clark Canyon Hydro, of transmission line connecting the environmental analysis, the
LLC. project to the local utility’s existing Commission will issue a public notice
e. Name of Project: Clark Canyon Dam transmission system. The average requesting comments,
Hydroelectric Project. annual generation is estimated to be recommendations, terms and
f. Location: On the Beaverhead River, 16.5 gigawatthours. conditions, or prescriptions.
18 miles southwest of the Town of m. A copy of the application is All filings must (1) Bear in all capital
Dillon, Beaverhead County, Montana. available for review at the Commission letters the title ‘‘PROTEST’’ or
The project would occupy 3.5 acres of in the Public Reference Room or may be ‘‘MOTION TO INTERVENE,’’ ‘‘NOTICE
federal land administered by the Bureau viewed on the Commission’s Web site at OF INTENT TO FILE COMPETING
of Reclamation. http://www.ferc.gov using the APPLICATION,’’ or ‘‘COMPETING
g. Filed Pursuant to: Federal Power ‘‘eLibrary’’ link. Enter the docket APPLICATION;’’ (2) set forth in the
Act, 16 U.S.C. 791(a)–825(r). number excluding the last three digits in heading the name of the applicant and
cprice-sewell on PROD1PC66 with NOTICES

h. Applicant Contact: Brent L. Smith, the docket number field to access the the project number of the application to
Northwest Power Services, Inc., P.O. document. For assistance, contact FERC which the filing responds; (3) furnish
Box 535, Rigby, ID 83442, (208) 745– Online Support at the name, address, and telephone
0834 or Dr. Vincent Lamarra, FERCOnlineSupport@ferc.gov or toll- number of the person protesting or
Ecosystems Research Institute, Inc., 975 free at 1–866–208–3676, or for TTY, intervening; and (4) otherwise comply
South State Highway, Logan, UT 84321. (202) 502–8659. A copy is also available with the requirements of 18 CFR

VerDate Aug<31>2005 16:26 May 02, 2007 Jkt 211001 PO 00000 Frm 00023 Fmt 4703 Sfmt 4703 E:\FR\FM\03MYN1.SGM 03MYN1