20522 Federal Register / Vol. 72, No.

79 / Wednesday, April 25, 2007 / Notices

DEPARTMENT OF ENERGY (866) 208–3676 (toll free). For TTY, call EA in the Commission’s public record
(202) 502–8659. for this proceeding or the issuance of a
Federal Energy Regulatory Notice of Schedule for Environmental
Kimberly D. Bose,
Commission Review will serve to notify federal and
Secretary. state agencies of the timing for the
[Docket No. RP96–359–034] [FR Doc. E7–7868 Filed 4–24–07; 8:45 am] completion of all necessary reviews, and
BILLING CODE 6717–01–P the subsequent need to complete all
Transcontinental Gas Pipe Line federal authorizations within 90 days of
Corporation; Notice of Negotiated Rate the date of issuance of the Commission
DEPARTMENT OF ENERGY staff’s FEIS or EA.
April 19, 2007.
Take notice that on April 13, 2007, There are two ways to become
Federal Energy Regulatory involved in the Commission’s review of
Transcontinental Gas Pipe Line Commission
Corporation (Transco) tendered for this project. First, any person wishing to
filing a copy of an executed service [Docket No. CP07–159–000] obtain legal status by becoming a party
agreement between Transco and to the proceeding for this project
Williston Basin Interstate Pipeline should, on or before the comment date
Southern Company Services, Inc. as
Company; Notice of Application stated below, file with the Federal
agent for Southern Power Company
which includes a negotiated rate for Energy Regulatory Commission, 888
April 18, 2007.
First Street, NE., Washington, DC 20426,
firm transportation service under Take notice that on April 16, 2007, a motion to intervene in accordance
Transco’s Momentum Expansion Williston Basin Interstate Pipeline with the requirements of the
Project. The effective date of the Company (Williston Basin), 1250 West Commission’s Rules of Practice and
agreement is January 1, 2011. Century Avenue, Bismarck, North Procedure (18 CFR 385.214 or 385.211)
Any person desiring to intervene or to Dakota 58503, filed an application in and the Regulations under the NGA (18
protest this filing must file in Docket No. CP07–159–000 pursuant to CFR 157.10). A person obtaining party
accordance with Rules 211 and 214 of section 7(c) of the Natural Gas Act status will be placed on the service list
the Commission’s Rules of Practice and (NGA) for authorization to reclassify maintained by the Secretary of the
Procedure (18 CFR 385.211 and approximately 6 miles of Williston Commission and will receive copies of
385.214). Protests will be considered by Basin’s 12-inch No. 3 natural gas storage all documents filed by the applicant and
the Commission in determining the line from the storage function to the by all other parties. A party must submit
appropriate action to be taken, but will gathering function, all as more fully set 14 copies of filings made with the
not serve to make protestants parties to forth in the application which is on file Commission and must mail a copy to
the proceeding. Any person wishing to with the Commission and open to the applicant and to every other party in
become a party must file a notice of public inspection. the proceeding. Only parties to the
intervention or motion to intervene, as This filing is available for review at proceeding can ask for court review of
appropriate. Such notices, motions, or the Commission in the Public Reference Commission orders in the proceeding.
protests must be filed in accordance Room or may be viewed on the However, a person does not have to
with the provisions of Section 154.210 Commission’s Web site at http:// intervene to have comments considered.
of the Commission’s regulations (18 CFR www.ferc.gov using the ‘‘eLibrary’’ link. The second way to participate is by
154.210). Anyone filing an intervention Enter the docket number excluding the filing with the Secretary of the
or protest must serve a copy of that last three digits in the docket number Commission, as soon as possible, an
document on the Applicant. Anyone field to access the document. For original and two copies of comments in
filing an intervention or protest on or assistance, contact FERC Online support of or in opposition to this
before the intervention or protest date Support at project. The Commission will consider
need not serve motions to intervene or FERCOnlineSupport@ferc.gov or these comments in determining the
protests on persons other than the Telephone: 202–502–6652; Toll-free: 1– appropriate action to be taken, but the
Applicant. 866–208–3676; or for TTY, contact (202) filing of a comment alone will not serve
The Commission encourages 502–8659. to make the filer a party to the
electronic submission of protests and Any initial questions regarding this proceeding. The Commission’s rules
interventions in lieu of paper using the application should be directed to Keith require that persons filing comments in
‘‘eFiling’’ link at http://www.ferc.gov. A. Tiggelaar, Director of Regulatory opposition to the project provide copies
Persons unable to file electronically Affairs for Williston Basin, P.O. Box of their protests only to the party or
should submit an original and 14 copies 5601, Bismarck, North Dakota 58506– parties directly involved in the protest.
of the protest or intervention to the 5601 at (701) 530–1560. Persons who wish to comment only
Federal Energy Regulatory Commission, Pursuant to section 157.9 of the on the environmental review of this
888 First Street, NE., Washington, DC Commission’s rules, 18 CFR 157.9, project, should submit an original and
20426. within 90 days of this Notice the two copies of their comments to the
This filing is accessible on-line at Commission staff will either: complete Secretary of the Commission.
http://www.ferc.gov, using the its environmental assessment (EA) and Environmental commenters will be
‘‘eLibrary’’ link and is available for place it into the Commission’s public placed on the Commission’s
review in the Commission’s Public record (eLibrary) for this proceeding; or environmental mailing list, will receive
Reference Room in Washington, DC. issue a Notice of Schedule for copies of the environmental documents,
There is an ‘‘eSubscription’’ link on the Environmental Review. If a Notice of and will be notified of meetings
cprice-sewell on PRODPC61 with NOTICES

Web site that enables subscribers to Schedule for Environmental Review is associated with the Commission’s
receive e-mail notification when a issued, it will indicate, among other environmental review process.
document is added to a subscribed milestones, the anticipated date for the Environmental commenters will not be
docket(s). For assistance with any FERC Commission staff’s issuance of the final required to serve copies of filed
Online service, please e-mail environmental impact statement (FEIS) documents on all other parties. The
FERCOnlineSupport@ferc.gov, or call or EA for this proposal. The filing of the Commission’s rules require that persons

VerDate Aug<31>2005 15:21 Apr 24, 2007 Jkt 211001 PO 00000 Frm 00023 Fmt 4703 Sfmt 4703 E:\FR\FM\25APN1.SGM 25APN1
Federal Register / Vol. 72, No. 79 / Wednesday, April 25, 2007 / Notices 20523

filing comments in opposition to the measurement, communication and DEPARTMENT OF ENERGY


project provide copies of their protests electrical equipment, and station piping.
only to the applicant. However, the non- Williston Basin also proposes Federal Energy Regulatory
party commenters will not receive modification work at the existing Cabin Commission
copies of all documents filed by other Creek Compressor Station Unit No. 15, [Docket No. EL07–56–000]
parties or issued by the Commission which will include a new compressor
(except for the mailing of environmental impeller, modification to the Allegheny Electric Cooperative, Inc.,
documents issued by the Commission) aboveground discharge header station, Borough of Chambersburg,
and will not have the right to seek court and a new gas cooler for Unit No. 15 Pennsylvania; City and Towns of
review of the commission’s final order. discharge. In addition, Williston Basin Hagerstown, Thurmont, and
The Commission strongly encourages Williamsport, Maryland; District of
proposes to construct approximately
electronic filings of comments, protests, Columbia Office of the People’s
4,800 feet of 6-inch diameter steel
and interventions via the internet in lieu Counsel; Illinois Citizens Utility Board;
pipeline called the Big Gumbo Lateral.
of paper; see 18 CFR 385.2001(a)(1)(iii) Indiana Office of Utility Consumer
and the instructions on the Williston Basin estimates the cost of
Counsel; Maryland Office of People’s
Commission’s Web site under the ‘‘e- construction to be $6,000,000. Williston Counsel; New Jersey Division of Rate
Filing’’ link. Basin states that it has entered into Counsel; Office of the Attorney
Comment Date: May 9, 2007. Precedent Agreements which provide General of Virginia, Division of
that Williston Basin will deliver a Consumer Counsel; Office of the Ohio
Kimberly D. Bose, Maximum Daily Delivery Quantity of Consumer’s Counsel; Old Dominion
Secretary. 41,000 equivalent dekatherms per day of Electric Cooperative; Pennsylvania
[FR Doc. E7–7798 Filed 4–24–07; 8:45 am] firm transportation service during the Office of Consumer Advocate; PJM
BILLING CODE 6717–01–P project’s first in-service year November Industrial Customer Coalition;
1, 2007 through October 31, 2008. Southern Maryland Electric
Any questions regarding the Cooperative, Inc.; State of Delaware,
DEPARTMENT OF ENERGY Division of the Public Advocate v. PJM
application should be directed to Keith
Federal Energy Regulatory A. Tiggelaar, Director of Regulatory Interconnection, L.L.C.; Notice of
Affairs, Williston Basin Interstate Complaint
Commission
[Docket No. CP07–131–000]
Pipeline Company, P.O. Box 5601, April 18, 2007.
Bismarck, North Dakota 58506–5601, or Take notice that on April 17, 2007,
Williston Basin Interstate Pipeline call at (701) 530–1560. the above-referenced ‘‘Joint
Company; Notice of Request Under Any person or the Commission’s Staff Complainants’’ tendered for filing,
Blanket Authorization may, within 60 days after the issuance pursuant to sections 205 and 206 of the
of the instant notice by the Commission, Federal Power Act, 16 U.S.C. 824d and
April 18, 2007. 824e (2006) and Rule 206 of
Take notice that on April 9, 2007, file pursuant to Rule 214 of the
Commission’s Rules of Practice and
Williston Basin Interstate Pipeline Commission’s Procedural Rules (18 CFR
Procedure, 18 CFR 385.206, a complaint
Company (Williston Basin), 1250 West 385.214) a motion to intervene or notice for a Show Cause Order and assurances
Century Avenue, Bismarck, North of intervention and, pursuant to section from PJM Interconnection, L.L.C. that it
Dakota 58503, filed in Docket No. CP07– 157.205 of the Commission’s has not violated, and will not violate, its
131–000, a prior notice request pursuant Regulations under the Natural Gas Act tariff requirements pertaining to market
to sections 157.205 and 157.210 of the (NGA) (18 CFR 157.205) a protest to the monitoring.
Federal Energy Regulatory request. If no protest is filed within the Any person desiring to intervene or to
Commission’s regulations under the time allowed therefore, the proposed protest this filing must file in
Natural Gas Act for authorization to activity shall be deemed to be accordance with Rules 211 and 214 of
construct and operate mainline natural authorized effective the day after the the Commission’s Rules of Practice and
gas facilities consisting of compression, time allowed for protest. If a protest is Procedure (18 CFR 385.211, 385.214).
piping, and measurement, located in filed and not withdrawn within 30 days Protests will be considered by the
Fallon County, Montana, all as more after the time allowed for filing a Commission in determining the
fully set forth in the application, which protest, the instant request shall be appropriate action to be taken, but will
is on file with the Commission and open treated as an application for not serve to make protestants parties to
to public inspection. The filing may also authorization pursuant to Section 7 of the proceeding. Any person wishing to
be viewed on the Web at http:// the NGA. become a party must file a notice of
www.ferc.gov using the ‘‘eLibrary’’ link. intervention or motion to intervene, as
Enter the docket number excluding the The Commission strongly encourages appropriate. The Respondent’s answer
last three digits in the docket number electronic filings of comments, protests, and all interventions, or protests must
field to access the document. For and interventions via the internet in lieu be filed on or before the comment date.
assistance, contact FERC at of paper. See 18 CFR 385.2001(a) (1) (iii) The Respondent’s answer, motions to
FERCOnlineSupport@ferc.gov or call and the instructions on the intervene, and protests must be served
toll-free, (886) 208–3676 or TYY, (202) Commission’s Web site (http:// on the Complainants.
502–8659. www.ferc.gov) under the ‘‘e-Filing’’ link. The Commission encourages
Specifically, Williston Basin proposes electronic submission of protests and
cprice-sewell on PRODPC61 with NOTICES

Kimberly D. Bose,
to construct a new compressor station, interventions in lieu of paper using the
the Sandstone Creek Compressor Secretary. ‘‘eFiling’’ link at http://www.ferc.gov.
Station, comprised of two 1,680 [FR Doc. E7–7806 Filed 4–24–07; 8:45 am] Persons unable to file electronically
horsepower units, totaling 3,360 BILLING CODE 6717–01–P should submit an original and 14 copies
horsepower, and appurtenant facilities, of the protest or intervention to the
including gas and jacket water coolers, Federal Energy Regulatory Commission,