Professional Documents
Culture Documents
to intervene in accordance with the d. Applicant: Fairhaven OPT Ocean 1–866–208–3676 or e-mail
Commission’s Rules may become a Power, LLC. FERCOnlineSupport@ferc.gov. For TTY,
party to the proceeding. Any comments, e. Name of Project: Fairhaven OPT call (202) 502–8659. A copy is also
protests, or motions to intervene must Wave Power Project. available for inspection and
be received on or before the specified f. Location: The project would be reproduction at the address in item h
comment date for the particular located in the Pacific Ocean in Humbolt above.
application. County, California. m. Individuals desiring to be included
Comments, protests and interventions g. Filed Pursuant to: Federal Power on the Commission’s mailing list should
may be filed electronically via the Act, 16 U.S.C. 791(a)—825(r). so indicate by writing to the Secretary
Internet in lieu of paper. See 18 CFR h. Applicant Contacts: Charles F. of the Commission.
385.2001 (a)(1)(iii) and the instructions Dunleavy, Fairhaven OPT Ocean Power, n. Competing Preliminary Permit:
on the Commission’s Web site under ‘‘e- LLC, 1590 Reed Road, Pennington, NJ Anyone desiring to file a competing
filing’’ link. The Commission strongly 08534, phone: (609)–730–0400. application for preliminary permit for a
encourages electronic filing. i. FERC Contact: Robert Bell, (202) proposed project must submit the
s. Filing and Service of Responsive 502–6062. competing application itself, or a notice
Documents: Any filings must bear in all j. Deadline for filing comments, of intent to file such an application, to
capital letters the title ‘‘COMMENTS’’, protests, and motions to intervene: 60 the Commission on or before the
‘‘COMPETING APPLICATION’’, days from the issuance date of this specified comment date for the
‘‘RECOMMENDATIONS FOR TERMS notice. particular application (see 18 CFR 4.36).
AND CONDITIONS’’, ‘‘PROTEST’’, OR All documents (original and eight Submission of a timely notice of intent
‘‘MOTION TO INTERVENE’’, as copies) should be filed with: Kimberly allows an interested person to file the
applicable, and the Project Number of D. Bose, Secretary, Federal Energy competing preliminary permit
the particular application to which the Regulatory Commission, 888 First application no later than 30 days after
filing refers. Any of the above-named Street, NE., Washington, DC 20426. the specified comment date for the
documents must be filed by providing Comments, protests, and interventions particular application. A competing
the original and the number of copies may be filed electronically via the preliminary permit application must
provided by the Commission’s Internet in lieu of paper; see 18 CFR conform with 18 CFR 4.30(b) and 4.36.
regulations to: The Secretary, Federal 385.2001(a)(1)(iii) and the instructions o. Competing Development
Energy Regulatory Commission, 888 on the Commission’s web site under the Application: Any qualified development
First Street, NE., Washington, DC 20426. ‘‘e-Filing’’ link. The Commission applicant desiring to file a competing
A copy of any motion to intervene must strongly encourages electronic filings. development application must submit to
also be served upon each representative Please include the project number (P– the Commission, on or before a
of the Applicant specified in the 12770–000) on any comments or specified comment date for the
particular application. motions filed. particular application, either a
t. Agency Comments: Federal, state, The Commission’s Rules of Practice competing development application or a
and local agencies are invited to file and Procedure require all intervenors notice of intent to file such an
comments on the described application. filing documents with the Commission application. Submission of a timely
A copy of the application may be to serve a copy of that document on notice of intent to file a development
obtained by agencies directly from the each person in the official service list application allows an interested person
Applicant. If an agency does not file for the project. Further, if an intervenor to file the competing application no
comments within the time specified for files comments or documents with the later than 120 days after the specified
filing comments, it will be presumed to Commission relating to the merits of an comment date for the particular
have no comments. One copy of an issue that may affect the responsibilities application. A competing license
agency’s comments must also be sent to of a particular resource agency, they application must conform with 18 CFR
the Applicant’s representatives. must also serve a copy of the document 4.30(b) and 4.36.
on that resource agency. p. Notice of Intent: A notice of intent
Philis J. Posey, k. Description of Project: The must specify the exact name, business
Acting Secretary. proposed project would consist of: (1) address, and telephone number of the
[FR Doc. E7–6919 Filed 4–11–07; 8:45 am] 40 to 80 Power Buoys having a total prospective applicant, and must include
BILLING CODE 6717–01–P installed capacity of 20 megawatts, (2) a an unequivocal statement of intent to
proposed 300-foot-long, 69 kilovolt submit, if such an application may be
transmission line, and (3) appurtenant filed, either a preliminary permit
DEPARTMENT OF ENERGY facilities. The project is estimated to application or a development
have an average annual generation of application (specify which type of
Federal Energy Regulatory 1.534 gigawatt-hours, which would be application). A notice of intent must be
Commission sold to a local utility. served on the applicant(s) named in this
l. Locations of Applications: A copy of public notice.
Notice of Application Accepted for the application is available for q. Proposed Scope of Studies under
Filing and Soliciting Motions to inspection and reproduction at the Permit: A preliminary permit, if issued,
Intervene, Protests, and Comments Commission in the Public Reference does not authorize construction. The
April 6, 2007. Room, located at 888 First Street NE., term of the proposed preliminary permit
Take notice that the following Room 2A, Washington DC 20426, or by would be 36 months. The work
hydroelectric application has been filed calling (202) 502–8371. This filing may proposed under the preliminary permit
also be viewed on the Commission’s would include economic analysis,
rmajette on PROD1PC67 with NOTICES
VerDate Aug<31>2005 15:49 Apr 11, 2007 Jkt 211001 PO 00000 Frm 00016 Fmt 4703 Sfmt 4703 E:\FR\FM\12APN1.SGM 12APN1
Federal Register / Vol. 72, No. 70 / Thursday, April 12, 2007 / Notices 18473
VerDate Aug<31>2005 15:49 Apr 11, 2007 Jkt 211001 PO 00000 Frm 00017 Fmt 4703 Sfmt 4703 E:\FR\FM\12APN1.SGM 12APN1