You are on page 1of 1

18490 Federal Register / Vol. 72, No.

70 / Thursday, April 12, 2007 / Notices

T. 15 N., R. 27 E., accepted December Avenue, Portland, Oregon 97204, upon criteria for flood protection. An increase
29, 2006 required payment. A person or party from 0.5 to 1.5 feet is anticipated for
T. 15 N., R. 26 E., accepted December who wishes to protest against a survey approximately 5.1 miles of levee. The
29, 2006 must file a notice that they wish to increase in levee height would expand
T. 13 N., R. 28 E., accepted December protest (at the above address) with the the levee footprint by lateral extension
29, 2006 Oregon/Washington State Director, of the structure. Levee footprint
T. 12 N., R. 28 E., accepted December Bureau of Land Management, Portland, increases in this reach will occur within
29, 2006 Oregon. the USIBWC right-of-way (ROW) and
The plats of survey of the following For further information contact: Chief, may extend primarily toward the
described lands were officially filed in Branch of Geographic Sciences, Bureau riverside of the existing levee or to the
the Bureau of Land Management of Land Management, (333 S.W. 1st landside given available ROW.
Oregon/Washington State Office, Avenue) P.O. Box 2965, Portland,
Oregon 97208. FEMA decertification of USIBWC
Portland, Oregon, on March 19, 2007.
levees in El Paso County, Texas has
Willamette Meridian Dated: April 4, 2007.
resulted in the need to rehabilitate the
Pamela J. Chappel,
Oregon levees to FEMA criteria; draft Digital
Branch of Lands and Minerals Resources. Flood Insurance Rate Maps will be
T. 29 S., R. 9 W., accepted January 19, [FR Doc. E7–6907 Filed 4–11–07; 8:45 am] issued in spring of 2007. The USIBWC
2007 BILLING CODE 4310–33–P plans on raising approximately 5.1
T. 30 S., R. 5 W., accepted January 26, miles of USIBWC levees within the
2007 International Dam to Riverside
T.31 S., R. 4 W., accepted January 26, INTERNATIONAL BOUNDARY AND Diversion Dam to meet the minimum 3
2007 WATER COMMISSION, UNITED feet of freeboard criteria.
T. 15 S., R. 6 W., accepted February 15, STATES AND MEXICO
2007 The Environmental Assessment
T. 10 S., R. 1 E., accepted February 15, United States Section; Notice of assesses potential environmental
2007 Availability of a Draft Environmental impacts of the Proposed Action and the
T. 13 S., R. 8 W., accepted February 15, Assessment and Finding of No No Action Alternative. A Draft Finding
2007 Significant Impact for Flood Control of No Significant Impact was issued for
T. 7 S., R. 4 E., accepted February 15, Improvements From International Dam the Proposed Action, including
2007 to Riverside Diversion Dam, Within the mitigation measures, based on a review
T. 29 S., R. 10 W., accepted February 15, Rio Grande Rectification Project, of the facts and analyses contained in
2007 Located in El Paso County, TX the Environmental Assessment. An
T. 15 S., R. 2 W., accepted February 15, environmental impact statement will
2007 AGENCY: United States Section,
International Boundary and Water not be prepared unless additional
T. 8 S., R. 4 E., accepted February 23, information which may affect this
2007 Commission.
Proposed Action: Levee height decision is brought to our attention
Willamette Meridian improvements within an approximate within 30-days from the date of this
15-mile reach from International Dam to Notice.
Washington
Riverside Diversion Dam in El Paso, El Availability: Copies of the Draft
T. 5 N., R. 23 E., accepted January 26, Paso County, Texas to meet the current Environmental Assessment and Finding
2007 Federal Emergency Management Agency of No Significant Impact may be
T. 4 N., R. 23 E., accepted January 26, (FEMA) freeboard requirements. obtained by request from Mr. Daniel
2007 Report Designation: Environmental Borunda, 4171 North Mesa, Suite C–
T. 31 N., R. 7 W., accepted February 23, Assessment. 100, El Paso, Texas 79902, e-mail:
2007 SUMMARY: The United States Section of danielborunda@ibwc.state.gov.
The plats of survey of the following the International Boundary and Water Electronic copies may also be obtained
described lands were officially filed in Commission (USIBWC) has prepared an from the USIBWC Home Page at
the Bureau of Land Management Environmental Assessment (EA) for a
http://www.ibwc.state.gov. Written
Oregon/Washington State Office, proposed action to raise the levee
comments will be accepted for 30-days
Portland, Oregon, on March 27, 2007. system from International Dam to
Riverside Diversion Dam, in El Paso following the date of this Notice.
Willamette Meridian
County, Texas. The levee system under Dated: April 5, 2007.
Oregon consideration for this EA, Susan Daniel,
T. 15 S., R. 13 E., accepted March 15, approximately 15-miles long, is located General Counsel.
2007 entirely within the city limits of El Paso, [FR Doc. E7–6827 Filed 4–11–07; 8:45 am]
Texas.
BILLING CODE 7010–01–P
Willamette Meridian This reach of levee system was
Washington recently identified as one of the priority
areas within the Rio Grande
T. 19 N., R. 3 W., accepted March 9, Rectification Project for flood control
2007 improvements. The need for
T. 39 N., R. 33 E., accepted March 9, improvements to the levee system was
rmajette on PROD1PC67 with NOTICES

2007 determined by hydraulic modeling


A copy of the plats may be obtained completed by the USIBWC in 2003. The
from the Land Office at the Oregon/ USIBWC hydraulic study for this reach
Washington State Office, Bureau of indicated that an increase in levee
Land Management, 333 SW., 1st height would be required to meet design

VerDate Aug<31>2005 15:49 Apr 11, 2007 Jkt 211001 PO 00000 Frm 00034 Fmt 4703 Sfmt 4703 E:\FR\FM\12APN1.SGM 12APN1

You might also like