You are on page 1of 2

14260 Federal Register / Vol. 72, No.

58 / Tuesday, March 27, 2007 / Notices

DEPARTMENT OF COMMERCE FOR FURTHER INFORMATION CONTACT: the company submitted documentation
Christopher Hargett, or Victoria Cho, at establishing the date of the sale of
International Trade Administration (202) 482–4161 or (202) 482–5075, subject merchandise to an unaffiliated
respectively; AD/CVD Operations, customer in the United States, date of
[A–580–816] Office 3, Import Administration, shipment, quantity, volume, and price
International Trade Administration, of the shipment, and lack of‘subsequent
Corrosion–Resistant Carbon Steel Flat U.S. Department of Commerce, 14th shipments.3
Products from Korea: Notice of Street and Constitution Avenue, NW.,
Initiation of Antidumping Duty New Washington, DC 20230. Initiation of Review
Shipper Review for the period August SUPPLEMENTARY INFORMATION:
1, 2006, through January 31, 2007 In accordance with section
Background 751(a)(2)(B) of the Act and 19 CFR
AGENCY: Import Administration, On February 28, 2007, the Department 351.214, and based on information on
International Trade Administration, received a timely request from Haewon, the record, we are initiating an AD new
Department of Commerce. in accordance with 19 CFR 351.214(c), shipper review for Haewon. The
EFFECTIVE DATE: March 27, 2007. for a new shipper review of the AD standard period of review in a new
SUMMARY: The Department of Commerce order on CORE Korea, which has a shipper review initiated following the
(‘‘the Department’’) has received a August anniversary month.1 semiannual anniversary month is the six
request to conduct a new shipper review As required by 19 CFR months preceding the semiannual
of the antidumping duty (‘‘AD’’) order 351.214(b)(2)(i) and (iii)(A), Haewon anniversary month.4 We intend to issue
on corrosion–resistant carbon steel flat certified that it did not export subject the preliminary results of this new
products from Korea (‘‘CORE Korea’’). In merchandise to the United States during shipper review not later than 180 days
accordance with section 751(a)(2)(B) of the period of investigation (‘‘POI’’), and after initiation of this review and issue
the Tariff Act of 1930, as amended (‘‘the that it has never been affiliated with any final results of this review no later than
Act’’), and 19 CFR 351.214, we are exporter or producer which exported 90 days after the date on which the
initiating an AD new shipper review for subject merchandise during the POI.2 preliminary results are issued. See 19
Haewon MSC Co., Ltd. (‘‘Haewon’’). Pursuant to 19 CFR 351.214(b)(2)(iv), CFR 351.214(i).

New Shipper Review Proceeding Period to be Reviewed

Haewon ...................................................................................................................................................................... 08/01/2006 - 01/31/2007

On August 17, 2006, the Pension Dated: March 21, 2007. (aroberts@cns.gov); (TTY/TDD) at (202)
Protection Act of 2006 (H.R. 4) was Stephen J. Claeys, 606–5256 between the hours of 9 a.m.
signed into law. Section 1632 of H.R. 4 Deputy Assistant Secretaryfor Import and 4 p.m. Eastern Time, Monday
temporarily suspends the authority of Administration. through Friday.
the Department to instruct U.S. Customs [FR Doc. E7–5580 Filed 3–26–07; 8:45 am] DATES: Comments may be submitted,
and Border Protection to collect a bond BILLING CODE 3510–DS–S identified by the title of the information
or other security in lieu of a cash collection activity, by any of the
deposit in new shipper reviews. following two methods listed in the
Therefore, the posting of a bond under CORPORATION FOR NATIONAL AND address section, within 30 days from the
section 751(a)(2)(B)(iii) of the Act in lieu COMMUNITY SERVICE date of publication in this Federal
of a cash deposit is not available in this Register.
Information Collection; Submission for
case. Importers of subject merchandise ADDRESSES: Comments may be
OMB Review; Comment Request
manufactured and exported by Haewon submitted, identified by the title of the
must continue to pay a cash deposit of AGENCY: Corporation for National and information collection activity, by any
estimated antidumping duties on each Community Service. of the following two methods:
entry of subject merchandise at the ACTION: Notice. (1) By fax to: (202) 395–6974,
current all–others rate of 17.70 percent. Attention: Ms. Katherine Astrich, OMB
SUMMARY: The Corporation for National
Interested parties requiring access to Desk Officer for the Corporation for
and Community Service (hereinafter the
proprietary information in this new National and Community Service; and
‘‘Corporation’’) has submitted a public
shipper review should submit (2) Electronically by e-mail to:
information collection request (ICR) to
applications for disclosure under Katherine_T._Astrich@omb.eop.gov.
the Office of Management and Budget
administrative protective order in (OMB) for review and approval in SUPPLEMENTARY INFORMATION: The OMB
accordance with 19 CFR 351.305 and accordance with the Paperwork is particularly interested in comments
351.306. Reduction Act of 1995, Pub. L. 104–13, which:
This initiation and notice are (44 U.S.C. Chapter 35). Copies of this • Evaluate whether the proposed
published in accordance with section ICR, with applicable supporting collection of information is necessary
751(a)(2)(B) of the Act and 19 CFR documentation, may be obtained by for the proper performance of the
351.214 and 351.221(c)(1)(i). calling the Corporation for National and functions of the Corporation, including
Community Service, Ms. Angela whether the information will have
sroberts on PROD1PC70 with NOTICES

Roberts, at (202) 606–6822, practical utility;


1 See Antidumping Duty Orders on Certain Cold- 2 See submission from Haewon MSC Co., Ltd., 4 See Certain Pasta From Italy: Initiation of New

Rolled Carbon Steel Flat Products and Certain regarding Request for New Shipper Review, Case A- Shipper Antidumping Duty Administrative Review,
Corrosion-Resistant Carbon Steel Flat Products from 580-816, dated February 28, 2007. 62 FR 8927 (February 27, 1997).
Korea, 58 FR 44159 (August 19, 1993). 3 Id.

VerDate Aug<31>2005 16:38 Mar 26, 2007 Jkt 211001 PO 00000 Frm 00003 Fmt 4703 Sfmt 4703 E:\FR\FM\27MRN1.SGM 27MRN1
Federal Register / Vol. 72, No. 58 / Tuesday, March 27, 2007 / Notices 14261

• Evaluate the accuracy of the policy that applies to all of the agency’s Dated: March 21, 2007.
agency’s estimate of the burden of the programs. The standard is currently 30 Tess Scannell,
proposed collection of information, days. The Senior Corps will share this Director, Senior Corps.
including the validity of the request for a 45-day due date with the [FR Doc. E7–5585 Filed 3–26–07; 8:45 am]
methodology and assumptions used; agency-wide Compliance Working BILLING CODE 6050–$$–P
• Enhance the quality, utility and Group for consideration.
clarity of the information to be Type of Review: Revision of a
collected; and currently approved collection.
• Minimize the burden of the DEPARTMENT OF DEFENSE
collection of information on those who Agency: Corporation for National and
Community Service. Office of the Secretary of Defense
are to respond, including the use of
appropriate automated, electronic, Title: National Senior Service Corps Sunshine Act; Notice of Partially-
mechanical, or other technological (Senior Corps) Project Progress Report. Closed Meeting
collection techniques or other forms of OMB Number: 3045–0033.
information technology, e.g., permitting AGENCY: Office of the Assistant
Agency Number: CNCS Form 1020. Secretary of Defense (Health Affairs);
electronic submissions of responses.
Affected Public: Sponsors of Senior DoD.
Comments Corps grants. SUMMARY: Pursuant to the Federal
A 60-day public comment Notice, Total Respondents: 1,350. Advisory Committee Act of 1972 (5
regarding modification of the Project Frequency: Semi-annual. U.S.C., Appendix as amended), the
Progress Report was published in the Sunshine in the Government Act of
Average Time Per Respondent: 8 1976 (5 U.S.C. 552b, as amended), and
Federal Register on January 17, 2007.
hours annually based on reporting semi- 41 CFR 102–3.150, the following
This comment period ended on March
annually without Data Demographics meeting notice is announced. In
19, 2007. A total of 10 responses were
and reporting Data Supplement accordance with section 10(a)(2) of
received, some of which contained
annually. Public Law.
multiple comments, representing a total
of 31 individuals. The summary of Estimated Total Burden Hours: NAME OF COMMITTEE: Defense Health
comments received is as follows: 10,800. Board (DHB).
In Summary: Total Burden Cost (capital/startup): DATES: April 10, 2007 (Closed Session).
(a) Six comments supported the None. April 11, 2007 (Open Session).
suggested changes and noted that the Total Burden Cost (operating/ TIMES: 8:30 a.m.–12 p.m. (April 10,
proposed revisions will make reporting maintenance): $2,000. 2007). 1 p.m.–4 p.m. (April 10, 2007). 9
easier and more streamlined.
(b) One comment suggested that the Description: The Corporation seeks to a.m.–12 p.m. (April 11, 2007). 2 p.m.–
semi-annual ‘‘Data Demographic’’ renew and revise the current OMB 4 p.m. (April 11, 2007).
section be retained, and that the approved Progress Report. When LOCATION:
proposed annual Data Supplemental revised, the Progress Report will: (a) April 10, 2007, Executive Board
Sheet (known as the Project Profile and Eliminate all quarterly submissions of Room, Walter Reed Army Institute of
Volunteer Activity) be eliminated. The the PPR; (b) change the submission Research, 503 Robert Grant Avenue,
Corporation believes that its proposal frequency of narrative and work plan Building 503, Silver Spring, Maryland
will result in more streamlined sections to 100 percent semi-annual 20910–7500.
reporting and greater data accuracy, and; (c) eliminate the ‘‘Data April 11, 2007, Walter Reed Army
since all projects would report activities Demographic’’ section of the PPR; and Medical Center, 6900 Georgia Avenue,
and outputs within the same time (d) change the submission frequency of NW., Washington, DC 20307.
period. This is currently not the case, the ‘‘Data Supplemental’’ section from PURPOSE OF THE MEETING: The purpose of
due to the fact that grantees submit biennial to annual. The revised PPR will the meeting is to address and deliberate
Project Progress Reports according to be used in the same manner as the pending and new Board issues and
their own grant cycle. existing PPR to report progress toward provide briefing for Board members on
(c) Four comments were beyond the accomplishing work plan goals and topics to ongoing Board business.
scope of this information collection. objectives, reporting volunteer and AGENDA: The Defense Health Board will
They included one observation that service outputs; reporting actual receive briefings in classified session
overall burden has increased at the local outcomes related to self-nominated relating to biological warfare
level due to the greater emphasis on performance measures meeting countermeasures on the April 10, 2007.
outcome-based programming. The challenges encountered, describing On April 11, 2007 during the morning
emphasis on quantifiable outputs and significant activities, and requesting session, the Board will receive updates
outcomes transcends the Corporation technical assistance. These proposed on the activities Defense Health Board
and applies to all federal agencies under modifications will continue to ensure subcommittees; The Mental Health Task
the Government Performance and that the information collection captures Force and The Task Force on the Future
Results Act (GPRA) and as such, the appropriate data for the Corporation’s of the Military Health Care. In the
Corporation lacks discretion to required performance measurement and afternoon at 2 p.m., The Board will
implement changes resulting in lack of other reporting. deliberate in open session the draft
outcome performance. Another The Project Progress Report (PPR) was findings and recommendations of the
comment requested that deadline for designed to assure that Senior Corps Independent Review Group To Report
report submission be increased from the grantees address and fulfill legislated On Rehabilitative Care And
sroberts on PROD1PC70 with NOTICES

current 30 days after the close of the 6- program purposes, meet agency program Administrative Processes At Walter
month period to 45 days after the close management and grant requirements, Reed Army Medical Center And
of the 6-month period. The due dates of and assess progress toward work plan National Naval Medical Center, a
reports after the close of the reporting objectives agreed upon in the granting of Defense Health Board subcommittee.
period is determined by Corporation the award. The Board will also receive a briefing on

VerDate Aug<31>2005 16:38 Mar 26, 2007 Jkt 211001 PO 00000 Frm 00004 Fmt 4703 Sfmt 4703 E:\FR\FM\27MRN1.SGM 27MRN1

You might also like