11352 Federal Register / Vol. 72, No.

48 / Tuesday, March 13, 2007 / Notices

contact FERCOnLineSupport@ferc.gov. DEPARTMENT OF ENERGY lieu of paper; see 18 CFR


For TTY, contact (202) 502–8659. 385.2001(a)(1)(iii) and the instructions
Federal Energy Regulatory on the Commission’s Web site (http://
m. Individuals desiring to be included
Commission www.ferc.gov) under the ‘‘e-Filing’’ link.
on the Commission’s mailing list should
[Project No. 2175–014] After logging into the e-Filing system,
so indicate by writing to the Secretary
select ‘‘Comment on Filing’’ from the
of the Commission.
Southern California Edison Company; Filing Type Selection screen and
n. Comments, Protests, or Motions to Notice of Application and Amended continue with the filing and process.
Intervene: Anyone may submit Preliminary Draft Environmental The Commission strongly encourages
comments, a protest, or a motion to Assessment Tendered for Filing With electronic filing.
intervene in accordance with the the Commission, and Establishing l. Status: This application has not
requirements of Rules of Practice and Procedual Schedule for Licensing and been accepted for filing. We are not
Procedure, 18 CFR 385.210, .211, .214. Deadline for Submission of Final soliciting motions to intervene, protests,
In determining the appropriate action to Amendments or final terms and conditions at this
take, the Commission will consider all time.
protests or other comments filed, but March 7, 2007. m. Description of Project: The existing
Take notice that the following Big Creek Nos. 1 and 2 Hydroelectric
only those who file a motion to
hydroelectric application has been filed Power Project consists of two
intervene in accordance with the
with the Commission and is available powerhouses, four major dams forming
Commission’s Rules may become a one major reservoir, one moderate dam
for public inspection.
party to the proceeding. Any comments, a. Type of Application: New License and impoundment, three small
protests, or motions to intervene must for Major Project-Existing Dam. diversions, and three water conveyance
be received on or before the specified b. Project No: P–2175–014. systems. The project would have an
comment date for the particular c. Date Filed: February 23, 2007. average annual generation of 657,072
application. d. Applicant: Southern California megawatt-hours.
o. Filing and Service of Responsive Edison Company. • Powerhouses (i) Powerhouse No. 1
Documents: Any filings must bear in all e. Name of Project: Big Creek Nos. 1 with four turbine/generator units and a
capital letters the title ‘‘COMMENTS’’, and 2 Hydroelectric Power Project. total dependable operating capacity of
‘‘RECOMMENDATIONS FOR TERMS f. Location: In Fresno County, about 82.9 MW; and (ii) Powerhouse No.
California, and within the Sierra 2, with four turbine/generator units and
AND CONDITIONS’’, ‘‘PROTEST’’, OR
National Forest. The project is situated a total dependable operating capacity of
‘‘MOTION TO INTERVENE’’, as
along Big Creek, a tributary to the San about 67.1 MW.
applicable, and the Project Number of Joaquin River. The project affects • Major dams and reservoirs (i) Dams
the particular application to which the 1,877.96 acres of Federal land 1, 2, 3, and 3a, which form Huntington
filing refers. A copy of any motion to administered by the Sierra National Lake, with a capacity of about 89,166
intervene must also be served upon each Forest. ac–ft, at an elevation of about 6,950 ft
representative of the Applicant g. Filed Pursuant to: Federal Power above mean sea level (msl).
specified in the particular application. Act 16 U.S.C. 791 (a)–825(r). • Moderate dam (i) Dam 4, which
p. Agency Comments: Federal, State, h. Applicant Contact: Russ W. forms Dam 4 Impoundment
and local agencies are invited to file Krieger, Vice President, Power (Powerhouse 2 Forebay), with a capacity
comments on the described Production, Southern California Edison of about 60 ac–ft, at an elevation of
applications. A copy of the applications Company, 300 North Lone Hill Ave., about 4,810 ft above msl.
may be obtained by agencies directly San Dimas, California 91773. Phone: • Small diversions (i) Balsam Creek
from the Applicant. If an agency does (909) 394–8667. Diversion, with a usable capacity of less
i. FERC Contact: Jim Fargo, (202) 502– than 1 ac–ft, at an elevation of about
not file comments within the time
6095, or e-mail: james.fargo@ferc.gov. 4,880 ft above msl; (ii) Ely Creek
specified for filing comments, it will be j. Cooperating Agencies: We are Diversion, with a usable capacity of less
presumed to have no comments. One asking Federal, State, local, and tribal than 1 ac–ft, at an elevation of about
copy of an agency’s comments must also agencies with jurisdiction and/or 4,844 ft above msl; and (iii) Adit 8
be sent to the Applicant’s special expertise with respect to Diversion, with a usable capacity of less
representatives. environmental issues to cooperate with than 1 ac–ft, at an elevation of about
q. Comments, protests and us in the preparation of the 4,825 ft above msl.
interventions may be filed electronically environmental document. Agencies who • Water conveyance systems (i)
via the Internet in lieu of paper. See, 18 would like to request cooperating status Tunnel No. 1, about 2 miles long,
CFR 385.2001(a)(1)(iii) and the should follow the instructions for filing conveys water from Huntington Lake
instructions on the Commission’s Web comments described in item k below. through an 84-inch diameter pipe to Big
site at http://www.ferc.gov under the ‘‘e- Agencies granted cooperating status will Creek Powerhouse No. 1.; (ii) Tunnel
Filing’’ link. be precluded from being an intervenor No. 2, approximately 4.1 miles long,
in this proceeding consistent with the conveys water from the Dam 4
Philis J. Posey, Commission’s regulations. impoundment just downstream of
Acting Secretary. k. Deadline for requests for Powerhouse 1 to Big Creek Powerhouse
[FR Doc. E7–4478 Filed 3–12–07; 8:45 am] cooperating agency status: 60 days from No. 2. Water from Ely and Balsam Creek
the date of this notice. All documents diversions also enter into Tunnel No. 2
cprice-sewell on PROD1PC66 with NOTICES

BILLING CODE 6717–01–P


(original and eight copies) should be between the forebay and powerhouse;
filed with: Philis J. Posey, Acting and (iii) The Shoo Fly, conveys water
Secretary, Federal Energy Regulatory from Shaver Lake (FERC Project No. 67)
Commission, 888 First Street, NE., through Tunnel 5 and into Tunnel 2
Washington, DC 20426. Comments may leading to Powerhouse No. 2. The Shoo
be filed electronically via the Internet in fly was used during the construction of

VerDate Aug<31>2005 14:58 Mar 12, 2007 Jkt 211001 PO 00000 Frm 00033 Fmt 4703 Sfmt 4703 E:\FR\FM\13MRN1.SGM 13MRN1
Federal Register / Vol. 72, No. 48 / Tuesday, March 13, 2007 / Notices 11353

Shaver Lake Dam and Powerhouse No. document. For assistance, please contact o. With this notice, we are initiating
2A to keep water off the dam and to get FERC Online Support at consultation with the California State
more generation from Powerhouse No. FERCOnlineSupport@ferc.gov or toll Historic Preservation Officer (SHPO), as
2. Although not currently in use, the free at (866) 208–3676, or for TTY, required by section 106, National
Shoo fly Complex gives SCE the contact (202) 502–8659. A copy is also Historic Preservation Act, and the
flexibility to divert water from Shaver available for inspection and regulations of the Advisory Council on
Lake to Powerhouse No. 2, if required. reproduction at the address in item h Historic Preservation, 36 CFR 800.4.
n. A copy of the application is above.
available for review at the Commission You may also register online at http:// p. Procedural schedule and final
in the Public Reference Room or may be www.ferc.gov/docs-filing/ amendments: The application will be
viewed on the Commission’s Web site at esubscription.asp to be notified via e- processed according to the following
http://www.ferc.gov using the mail of new filings and issuances Hydro Licensing Schedule. Revisions to
‘‘eLibrary’’ link. Enter the docket related to this or other pending projects. the schedule will be made if the
number excluding the three digits in the For assistance, contact FERC Online Commission determines it necessary to
docket number field to access the Support. do so:

Milestone Tentativedate

Issue Acceptance/Deficiency Letter and request Additional Information, if needed ............................................................. June 2007.
Notice asking for final terms and conditions ......................................................................................................................... September 2007.
Notice of the availability of the draft EIS ............................................................................................................................... March 2008.
Notice of the availability of the final EIS ................................................................................................................................ September 2008.

Final amendments to the application Creek, and Stevenson Creek watersheds. The Commission strongly encourages
must be filed with the Commission no The project affects 2,143.25 acres of electronic filing.
later than 30 days from the issuance Federal lands. l. Status: This application has not
date of the notice soliciting final terms g. Filed Pursuant to: Federal Power been accepted for filing. We are not
and conditions. Act 16 U.S.C. 791 (a)–825(r). soliciting motions to intervene, protests,
h. Applicant Contact: Russ W. or final terms and conditions at this
Philis J. Posey,
Krieger, Vice President, Power time.
Acting Secretary. m. Description of Project: The existing
[FR Doc. E7–4479 Filed 3–12–07; 8:45 am] Production, Southern California Edison
Company, 300 North Lone Hill Ave., Big Creek Nos. 2A, 8 and Eastwood
BILLING CODE 6717–01–P
San Dimas, California 91773. Phone: Power Station Hydroelectric Power
(909) 394–8667. Project consists of two powerhouses and
an underground power station; two
DEPARTMENT OF ENERGY i. FERC Contact: Jim Fargo, (202) 502– major dams and reservoirs; five
6095, or e-mail: james.fargo@ferc.gov. moderate-sized dams forming two
Federal Energy Regulatory j. Cooperating Agencies: We are forebays and three small diversion
Commission asking Federal, State, local, and tribal pools; eight small diversions; six water
[Project No. 67–113] agencies with jurisdiction and/or conveyance systems; and one
special expertise with respect to transmission line. The project would
Southern California Edison Company; environmental issues to cooperate with have an average annual generation of
Notice of Application and Amended us in the preparation of the 1,125,429 megawatt-hours.
Preliminary Draft Environmental environmental document. Agencies who • Powerhouses and powerstation (i)
Assessment Tendered for Filing With would like to request cooperating status Big Creek Powerhouse No. 2A with two
the Commission, and Establishing should follow the instructions for filing turbine/generator units and a total
Procedual Schedule for Licensing and comments described in item k below. dependable operating capacity of about
Deadline for Submission of Final Agencies granted cooperating status will 98.5 MW; (ii) Powerhouse No. 8 with
Amendments be precluded from being an intervenor two turbine/generator units and a
in this proceeding consistent with the dependable operating capacity of about
March 7, 2007. Commission’s regulations.
Take notice that the following 64.5 MW; and (iii) Eastwood Power
k. Deadline for requests for Station, with one turbine/pump/
hydroelectric application has been filed
cooperating agency status: 60 days from generator unit and a dependable
with the Commission and is available
the date of this notice. All documents operating capacity of about 207 MW.
for public inspection.
a. Type of Application: New License (original and eight copies) should be • Major dams and reservoirs (i)
for Major Project-Existing Dam. filed with: Philis J. Posey, Acting Shaver Dam, forming Shaver Lake,
b. Project No.: P–67–113. Secretary, Federal Energy Regulatory which has a usable storage capacity of
c. Date Filed: February 23, 2007. Commission, 888 First Street, NE., about 135,568 ac-ft, at an elevation of
d. Applicant: Southern California Washington, DC 20426. Comments may about 5,370 ft above mean sea level
Edison Company. be filed electronically via the Internet in (msl); and (ii) Florence Dam, forming
e. Name of Project: Big Creek Nos. 2A, lieu of paper; see 18 CFR Florence Lake, which has a usable
8 and Eastwood Power Station 385.2001(a)(1)(iii) and the instructions storage capacity of about 64,406 ac-ft, at
cprice-sewell on PROD1PC66 with NOTICES

Hydroelectric Power Project. on the Commission’s Web site (http:// an elevation of about 7,327 ft above msl.
f. Location: The Big Creek Nos. 2A, 8 www.ferc.gov) under the ‘‘e-Filing’’ link. • Moderate-sized dams, forebays and
and Eastwood Hydroelectric Project is After logging into the e-Filing system, diversion pools (i) Balsam Forebay, with
located in Fresno County, California select ‘‘Comment on Filing’’ from the a usable storage capacity of about 1,547
near the town of Shaver Lake within the Filing Type Selection screen and ac-ft, at an elevation of about 6,670 ft
South Fork San Joaquin River, Big continue with the filing and process. above msl; (ii) Dam 5 Impoundment