You are on page 1of 2

Federal Register / Vol. 72, No.

37 / Monday, February 26, 2007 / Notices 8369

appropriate action to be taken, but will Fifth Revised Sheet No. 34A DEPARTMENT OF ENERGY
not serve to make protestants parties to Fourth Revised Sheet No. 66
the proceeding. Any person wishing to Original Sheet No. 66A Federal Energy Regulatory
become a party must file a notice of Commission
Overthrust states it is proposing to
intervention or motion to intervene, as modify its gas quality specifications to
appropriate. Such notices, motions, or [Project No. 12580–001]
control hydrocarbon liquid dropout by
protests must be filed in accordance setting a maximum Cricondentherm Shenango Dam Hydroelectric
with the provisions of Section 154.210 Hydrocarbon Dew Point (CHDP) with a Company, LLC; Notice of Surrender of
of the Commission’s regulations (18 CFR safe harbor provision. Preliminary Permit
154.210). Anyone filing an intervention
or protest must serve a copy of that Overthrust states that copies of the February 16, 2007.
document on the Applicant. Anyone filing have been served upon
Take notice that Shenango Dam
filing an intervention or protest on or Overthrust’s customers and the public
Hydroelectric Company, LLC, permittee
before the intervention or protest date service commissions of Utah and
for the proposed Shenango Dam Project,
need not serve motions to intervene or Wyoming.
has requested that its preliminary
protests on persons other than the Any person desiring to intervene or to permit be terminated. The permit was
Applicant. protest this filing must file in issued on August 18, 2005, and would
The Commission encourages accordance with Rules 211 and 214 of have expired on July 31, 2008.1 The
electronic submission of protests and the Commission’s Rules of Practice and project would have been located on the
interventions in lieu of paper using the Procedure (18 CFR 385.211 and Shenango River in Mercer County,
‘‘eFiling’’ link at http://www.ferc.gov. 385.214). Protests will be considered by Pennsylvania.
Persons unable to file electronically the Commission in determining the The permittee filed the request on
should submit an original and 14 copies appropriate action to be taken, but will February 6, 2007, and the preliminary
of the protest or intervention to the not serve to make protestants parties to permit for Project No. 12580 shall
Federal Energy Regulatory Commission, the proceeding. Any person wishing to remain in effect through the thirtieth
888 First Street, NE., Washington, DC become a party must file a notice of day after issuance of this notice unless
20426. intervention or motion to intervene, as that day is a Saturday, Sunday, part-day
This filing is accessible on-line at appropriate. Such notices, motions, or holiday that affects the Commission, or
http://www.ferc.gov, using the protests must be filed in accordance legal holiday as described in section 18
‘‘eLibrary’’ link and is available for with the provisions of Section 154.210 CFR 385.2007, in which case the
review in the Commission’s Public of the Commission’s regulations (18 CFR effective date is the first business day
Reference Room in Washington, DC. 154.210). Anyone filing an intervention following that day. New applications
There is an ‘‘eSubscription’’ link on the or protest must serve a copy of that involving this project site, to the extent
Web site that enables subscribers to document on the Applicant. Anyone provided for under 18 CFR Part 4, may
receive e-mail notification when a filing an intervention or protest on or be filed on the next business day.
document is added to a subscribed before the intervention or protest date
docket(s). For assistance with any FERC need not serve motions to intervene or Magalie R. Salas,
Online service, please e-mail protests on persons other than the Secretary.
FERCOnlineSupport@ferc.gov, or call Applicant. [FR Doc. E7–3217 Filed 2–23–07; 8:45 am]
(866) 208–3676 (toll free). For TTY, call The Commission encourages BILLING CODE 6717–01–P
(202) 502–8659. electronic submission of protests and
Magalie R. Salas, interventions in lieu of paper using the
‘‘eFiling’’ link at http://www.ferc.gov. DEPARTMENT OF ENERGY
Secretary.
[FR Doc. E7–3226 Filed 2–23–07; 8:45 am]
Persons unable to file electronically Federal Energy Regulatory
should submit an original and 14 copies Commission
BILLING CODE 6717–01–P
of the protest or intervention to the
Federal Energy Regulatory Commission, [Docket Nos. CP07–74–000, CP07–75–000,
DEPARTMENT OF ENERGY 888 First Street, NE., Washington, DC CP07–76–000, CP07–77–000]
20426.
Federal Energy Regulatory This filing is accessible on-line at Sonora Pipeline, LLC; Notice of
Commission http://www.ferc.gov, using the Applications
[Docket No. RP07–169–000] ‘‘eLibrary’’ link and is available for February 15, 2007.
review in the Commission’s Public
Questar Overthrust Pipeline Company; Reference Room in Washington, DC. Take notice that on January 31, 2007,
Notice of Proposed Changes in FERC There is an ‘‘eSubscription’’ link on the Sonora Pipeline, LLC (Sonora), 1862
Gas Tariff Web site that enables subscribers to West Bitters, Bldg. #1, San Antonio,
receive e-mail notification when a Texas 78248, filed an application in
February 20, 2007. document is added to a subscribed Docket No. CP07–75–000 pursuant to
Take notice that on February 12, 2007, docket(s). For assistance with any FERC section 3 of the Natural Gas Act (NGA)
Questar Overthrust Pipeline Company Online service, please e-mail and Part 153 of the Commission’s
(Overthrust) tendered for filing as part FERCOnlineSupport@ferc.gov, or call regulations requesting issuance of an
of its FERC Gas Tariff, First Revised (866) 208–3676 (toll free). For TTY, call order and a Presidential Permit
Volume No. 1–A, the following tariff (202) 502–8659. authorizing Sonora to site, construct,
ycherry on PROD1PC64 with NOTICES

sheets, to be effective March 12, 2007: operate, and maintain two bidirectional
Magalie R. Salas, border crossing facilities in Hidalgo
First Revised Volume No. 1–A
Secretary. County, Texas.
Fourth Revised Sheet No. 31
Fifth Revised Sheet No. 32 [FR Doc. E7–3225 Filed 2–23–07; 8:45 am]
Seventh Revised Sheet Nos. 33 and 34 BILLING CODE 6717–01–P 1 112 FERC ¶62,154.

VerDate Aug<31>2005 16:03 Feb 23, 2007 Jkt 211001 PO 00000 Frm 00033 Fmt 4703 Sfmt 4703 E:\FR\FM\26FEN1.SGM 26FEN1
8370 Federal Register / Vol. 72, No. 37 / Monday, February 26, 2007 / Notices

Also take notice that on January 31, Commission staff will either: complete two copies of their comments to the
2007, Sonora filed pursuant to Section its environmental assessment (EA) and Secretary of the Commission.
7(c) of the NGA and the Commission’s place it into the Commission’s public Environmental commenters will be
regulations: (1) An application in record (eLibrary) for this proceeding; or placed on the Commission’s
Docket No. CP07–74–000 for a issue a Notice of Schedule for environmental mailing list, will receive
certificate of public convenience and Environmental Review. If a Notice of copies of the environmental documents,
necessity authorizing the construction Schedule for Environmental Review is and will be notified of meetings
and operation of 20.2 miles of 30-inch issued, it will indicate, among other associated with the Commission’s
pipeline, the Mission Line, and 8.7 milestones, the anticipated date for the environmental review process.
miles of 30-inch pipeline, the Progresso Commission staff’s issuance of the final Environmental commenters will not be
Line, which will extend from the two environmental impact statement (FEIS) required to serve copies of filed
proposed border crossing facilities; (2) or EA for this proposal. The filing of the documents on all other parties.
an application in Docket No. CP07–76– EA in the Commission’s public record However, the non-party commenters
000 for a blanket construction certificate for this proceeding or the issuance of a will not receive copies of all documents
under Part 157, Subpart F of the Notice of Schedule for Environmental filed by other parties or issued by the
Commission’s regulations; and (3) an Review will serve to notify federal and Commission (except for the mailing of
application in Docket No. CP07–77–000 state agencies of the timing for the environmental documents issued by the
for a blanket transportation certificate completion of all necessary reviews, and Commission) and will not have the right
under Part 284 Subpart G of the the subsequent need to complete all to seek court review of the
Commission’s regulations. federal authorizations within 90 days of Commission’s final order.
Take further notice that certain the date of issuance of the Commission Protests and interventions may be
additional information is required, and staff’s FEIS or EA. filed electronically via the Internet in
Commission staff has identified this There are two ways to become lieu of paper; see 18 CFR
information to the applicant. To the involved in the Commission’s review of 285.2001(a)(1)(iii) and the instructions
extent that such information is not filed this Project. First, any person wishing to on the Commission’s Web site under the
with the Secretary by February 20, 2007, obtain legal status by becoming a party ‘‘e-filing’’ link. The Commission
Sonora’s application is subject to to the proceeding for this project should strongly encourages electronic filings.
rejection pursuant to 18 CFR 157.8 (c). file with the Federal Energy Regulatory Comment Date: March 8, 2007.
These filings are available for review Commission, 888 First Street, NE., Magalie R. Salas,
at the Commission’s Washington, DC Washington, DC 20426, a motion to
Secretary.
offices or may be viewed on the intervene in accordance with the
Commission’s Web site at http:// requirements of the Commission’s Rules [FR Doc. E7–3191 Filed 2–23–07; 8:45 am]
www.ferc.gov the ‘‘e-Library’’ link. Enter of Practice and Procedure (18 CFR BILLING CODE 6717–01–P
the docket number, excluding the last 385.214 or 385.211) and the Regulations
three digits, in the docket number field under the NGA (18 CFR 157.10) by the
to access the document. For assistance, comment date, below. A person DEPARTMENT OF ENERGY
please contact FERC Online Support at obtaining party status will be placed on Federal Energy Regulatory
FERCOnlinesupport@ferc.gov or the service list maintained by the Commission
Telephone: 202–502–6652; Toll-free: 1– Secretary of the Commission and will
866–208–3676; or for TTY, contact (202) receive copies of all documents filed by [Project No. 12486–001]
502–8659. the applicant and by all other parties. A
Any questions regarding these party must submit 14 copies of filings Twin Lakes Canal Company; Notice of
applications should be directed to James made with the Commission and must Intent To File License Application,
B. Smith, Sonora Pipeline, LLC, 1862 mail a copy to the applicant and to Filing of Pre-Application Document,
West Bitters, Bldg. #1, San Antonio, every other party in the proceeding. Commencement of Licensing
Texas 78248, or phone at (210)764– Only parties to the proceeding can ask Proceeding, Scoping Meetings,
8642. for court review of Commission orders Solicitation of Comments on the Pad
On June 6, 2005, the Commission staff in the proceeding. and Scoping Document, and
granted Sonora’s request to utilize the However, a person does not have to Identification of Issues and Associated
Pre-Filing Process and assigned Docket intervene to have comments considered. Study Requests
No. PF05–15–000 to staff activities The second way to participate is by February 16, 2007.
involving Sonora’s project. Now, as of filing with the Secretary of the a. Type of Filing: Notice of Intent to
the filing of Sonora’s applications on Commission, as soon as possible, an File License Application for an original
January 31, 2007, the Pre-Filing Process original and two copies of comments in License and Pre-Application Document.
for this project has officially concluded. support of or in opposition to this b. Project No.: 12486–001.
And while the PF Docket Number is project and/or associated pipeline. The c. Date Filed: December 15, 2006.
now closed, all of the information Commission will consider these d. Submitted by: Twin Lakes Canal
contained in the Pre-Filing Process will comments in determining the Company.
become part of the proceeding. From appropriate action to be taken, but the e. Name of Project: Bear River
this time forward, Sonora’s proceeding filing of a comment alone will not serve Narrows Hydroelectric Project.
will be conducted in Docket Nos. CP07– to make the filer a party to the f. Location: The proposed Bear River
74–000, CP07–75–000, CP07–76–000, proceeding. The Commission’s rules Narrows Hydroelectric Project would be
and CP07–77–000 as noted in the require that persons filing comments in located in Southeastern Idaho on the
caption of this Notice. All future opposition to the project provide copies Bear River. The project would be
ycherry on PROD1PC64 with NOTICES

correspondence should refer to these CP of their protests only to the party or located entirely within Franklin County
docket numbers only. parties directly involved in the protest. approximately nine miles Northeast of
Pursuant to Section 157.9 of the Persons who wish to comment only Preston, Idaho.
Commission’s rules, 18 CFR 157.9, on the environmental review of this g. Filed Pursuant to: 18 CFR Part 5 of
within 90 days of this Notice the project should submit an original and the Commission’s Regulations.

VerDate Aug<31>2005 16:03 Feb 23, 2007 Jkt 211001 PO 00000 Frm 00034 Fmt 4703 Sfmt 4703 E:\FR\FM\26FEN1.SGM 26FEN1

You might also like