8370 Federal Register / Vol. 72, No.

37 / Monday, February 26, 2007 / Notices

Also take notice that on January 31, Commission staff will either: complete two copies of their comments to the
2007, Sonora filed pursuant to Section its environmental assessment (EA) and Secretary of the Commission.
7(c) of the NGA and the Commission’s place it into the Commission’s public Environmental commenters will be
regulations: (1) An application in record (eLibrary) for this proceeding; or placed on the Commission’s
Docket No. CP07–74–000 for a issue a Notice of Schedule for environmental mailing list, will receive
certificate of public convenience and Environmental Review. If a Notice of copies of the environmental documents,
necessity authorizing the construction Schedule for Environmental Review is and will be notified of meetings
and operation of 20.2 miles of 30-inch issued, it will indicate, among other associated with the Commission’s
pipeline, the Mission Line, and 8.7 milestones, the anticipated date for the environmental review process.
miles of 30-inch pipeline, the Progresso Commission staff’s issuance of the final Environmental commenters will not be
Line, which will extend from the two environmental impact statement (FEIS) required to serve copies of filed
proposed border crossing facilities; (2) or EA for this proposal. The filing of the documents on all other parties.
an application in Docket No. CP07–76– EA in the Commission’s public record However, the non-party commenters
000 for a blanket construction certificate for this proceeding or the issuance of a will not receive copies of all documents
under Part 157, Subpart F of the Notice of Schedule for Environmental filed by other parties or issued by the
Commission’s regulations; and (3) an Review will serve to notify federal and Commission (except for the mailing of
application in Docket No. CP07–77–000 state agencies of the timing for the environmental documents issued by the
for a blanket transportation certificate completion of all necessary reviews, and Commission) and will not have the right
under Part 284 Subpart G of the the subsequent need to complete all to seek court review of the
Commission’s regulations. federal authorizations within 90 days of Commission’s final order.
Take further notice that certain the date of issuance of the Commission Protests and interventions may be
additional information is required, and staff’s FEIS or EA. filed electronically via the Internet in
Commission staff has identified this There are two ways to become lieu of paper; see 18 CFR
information to the applicant. To the involved in the Commission’s review of 285.2001(a)(1)(iii) and the instructions
extent that such information is not filed this Project. First, any person wishing to on the Commission’s Web site under the
with the Secretary by February 20, 2007, obtain legal status by becoming a party ‘‘e-filing’’ link. The Commission
Sonora’s application is subject to to the proceeding for this project should strongly encourages electronic filings.
rejection pursuant to 18 CFR 157.8 (c). file with the Federal Energy Regulatory Comment Date: March 8, 2007.
These filings are available for review Commission, 888 First Street, NE., Magalie R. Salas,
at the Commission’s Washington, DC Washington, DC 20426, a motion to
Secretary.
offices or may be viewed on the intervene in accordance with the
Commission’s Web site at http:// requirements of the Commission’s Rules [FR Doc. E7–3191 Filed 2–23–07; 8:45 am]
www.ferc.gov the ‘‘e-Library’’ link. Enter of Practice and Procedure (18 CFR BILLING CODE 6717–01–P
the docket number, excluding the last 385.214 or 385.211) and the Regulations
three digits, in the docket number field under the NGA (18 CFR 157.10) by the
to access the document. For assistance, comment date, below. A person DEPARTMENT OF ENERGY
please contact FERC Online Support at obtaining party status will be placed on Federal Energy Regulatory
FERCOnlinesupport@ferc.gov or the service list maintained by the Commission
Telephone: 202–502–6652; Toll-free: 1– Secretary of the Commission and will
866–208–3676; or for TTY, contact (202) receive copies of all documents filed by [Project No. 12486–001]
502–8659. the applicant and by all other parties. A
Any questions regarding these party must submit 14 copies of filings Twin Lakes Canal Company; Notice of
applications should be directed to James made with the Commission and must Intent To File License Application,
B. Smith, Sonora Pipeline, LLC, 1862 mail a copy to the applicant and to Filing of Pre-Application Document,
West Bitters, Bldg. #1, San Antonio, every other party in the proceeding. Commencement of Licensing
Texas 78248, or phone at (210)764– Only parties to the proceeding can ask Proceeding, Scoping Meetings,
8642. for court review of Commission orders Solicitation of Comments on the Pad
On June 6, 2005, the Commission staff in the proceeding. and Scoping Document, and
granted Sonora’s request to utilize the However, a person does not have to Identification of Issues and Associated
Pre-Filing Process and assigned Docket intervene to have comments considered. Study Requests
No. PF05–15–000 to staff activities The second way to participate is by February 16, 2007.
involving Sonora’s project. Now, as of filing with the Secretary of the a. Type of Filing: Notice of Intent to
the filing of Sonora’s applications on Commission, as soon as possible, an File License Application for an original
January 31, 2007, the Pre-Filing Process original and two copies of comments in License and Pre-Application Document.
for this project has officially concluded. support of or in opposition to this b. Project No.: 12486–001.
And while the PF Docket Number is project and/or associated pipeline. The c. Date Filed: December 15, 2006.
now closed, all of the information Commission will consider these d. Submitted by: Twin Lakes Canal
contained in the Pre-Filing Process will comments in determining the Company.
become part of the proceeding. From appropriate action to be taken, but the e. Name of Project: Bear River
this time forward, Sonora’s proceeding filing of a comment alone will not serve Narrows Hydroelectric Project.
will be conducted in Docket Nos. CP07– to make the filer a party to the f. Location: The proposed Bear River
74–000, CP07–75–000, CP07–76–000, proceeding. The Commission’s rules Narrows Hydroelectric Project would be
and CP07–77–000 as noted in the require that persons filing comments in located in Southeastern Idaho on the
caption of this Notice. All future opposition to the project provide copies Bear River. The project would be
ycherry on PROD1PC64 with NOTICES

correspondence should refer to these CP of their protests only to the party or located entirely within Franklin County
docket numbers only. parties directly involved in the protest. approximately nine miles Northeast of
Pursuant to Section 157.9 of the Persons who wish to comment only Preston, Idaho.
Commission’s rules, 18 CFR 157.9, on the environmental review of this g. Filed Pursuant to: 18 CFR Part 5 of
within 90 days of this Notice the project should submit an original and the Commission’s Regulations.

VerDate Aug<31>2005 16:03 Feb 23, 2007 Jkt 211001 PO 00000 Frm 00034 Fmt 4703 Sfmt 4703 E:\FR\FM\26FEN1.SGM 26FEN1
Federal Register / Vol. 72, No. 37 / Monday, February 26, 2007 / Notices 8371

h. Potential Applicant Contact: Nick Commission at the following address: Scoping Document 1 (SD1), which
Josten, Project Engineer, GeoSense, 2742 Magalie R. Salas, Secretary, Federal outlines the subject areas to be
Saint Charles Ave., Idaho Falls, ID Energy Regulatory Commission, 888 addressed in the environmental
83404, (208) 528–6152. First Street, NE., Washington, DC 20426. document, has been mailed to the
i. FERC Contact: Shana Murray (202) All filings with the Commission must individuals and entities on the
502–8333 or via e-mail at include on the first page, the project Commission’s mailing list. Copies of
shana.murray@ferc.gov. name (Bear River Narrows Hydroelectric SD1 will be available at the scoping
j. We are asking Federal, State, local, Project) and number (P–12486–001), meetings, or may be viewed on the Web
and tribal agencies with jurisdiction and bear the heading ‘‘Comments on at http://www.ferc.gov, using the
and/or special expertise with respect to Pre-Application Document,’’ ‘‘Study ‘‘eLibrary’’ link. Follow the directions
environmental issues to cooperate with Requests,’’ ‘‘Comments on Scoping for accessing information in paragraph
us in the preparation of the Document 1,’’ ‘‘Request for Cooperating p. Depending on the extent of comments
environmental document. Agencies who Agency Status,’’ or ‘‘Communications to received, a Scoping Document 2 (SD2)
would like to request cooperating status and from Commission Staff.’’ Any may or may not be issued.
should follow the instructions for filing individual or entity interested in
comments described in paragraph n Site Visit
submitting study requests, commenting
below. on the PAD or SD1, and any agency The potential applicant and
k. With this notice, we are initiating requesting cooperating status must do so Commission staff will conduct a site
informal consultation with: (a) The U.S. by April 14, 2007. visit of the proposed project on
Fish and Wildlife Service and/or NOAA Comments on the PAD and SD1, Tuesday, March 13, 2007, starting at 10
Fisheries under section 7 of the study requests, requests for cooperating a.m. All participants should meet at the
Endangered Species Act and the joint Twin Lakes Canal Company, located at
agency status, and other permissible
agency regulations thereunder at 50 CFR 2 North State Street, Preston, Idaho
forms of communications with the
Part 402; and (b) the State Historic 83263. All participants are responsible
Commission may be filed electronically
Preservation Officer, as required by for their own transportation. Anyone
via the Internet in lieu of paper. The
section 106, National Historical with questions about the site visit
Commission strongly encourages
Preservation Act, and the implementing should contact Mr. Clair Bosen at (208)
electronic filings. See 18 CFR
regulations of the Advisory Council on 852–1612 on or before March 13, 2007.
385.2001(a)(1)(iii) and the instructions
Historic Preservation at 36 CFR 800.2.
l. Twin Lakes Canal Company filed a on the Commission’s Web site (http:// Scoping Meeting Objectives
Pre-Application Document (PAD); www.ferc.gov) under the ‘‘e-filing’’ link.
o. At this time, Commission staff At the scoping meeting, staff will: (1)
including a proposed process plan and Present the proposed list of issues to be
schedule with the Commission, intends to prepare an Environmental
Assessment for the project, in addressed in the EA; (2) review and
pursuant to 18 CFR 5.6 of the discuss existing conditions and resource
Commission’s regulations. accordance with the National
Environmental Policy Act. However, agency management objectives; (3)
m. Copies of the PAD and Scoping review and discuss existing information
Document 1 (SD1) are available for there is the possibility that an
Environmental Impact Statement (EIS) and identify preliminary information
review at the Commission in the Public and potential study needs; (4) review
Reference Room or may be viewed on will be required. Nevertheless, the
scoping meetings will satisfy the NEPA and discuss the process plan and
the Commission’s Web site (http:// schedule for pre-filing activity that
www.ferc.gov), using the ‘‘eLibrary’’ scoping requirements, irrespective of
whether an EA or EIS is issued by the incorporates the time frames provided
link. Enter the docket number, for in Part 5 of the Commission’s
excluding the last three digits in the Commission.
regulations and, to the extent possible,
docket number field to access the Scoping Meetings maximizes coordination of federal, state,
document. For assistance, contact FERC and tribal permitting and certification
Online Support at We will hold a daytime and nighttime
scoping meeting at the times and places processes; and (5) discuss requests by
FERCONlineSupport@ferc.gov or toll any federal or state agency or Indian
free at 1–866–208–3676, of for TTY, noted below. We invite all interested
individuals, organizations, and agencies tribe acting as a cooperating agency for
(202) 502–8659. A copy is also available development of an environmental
for inspection and reproduction at the to attend one or both of the meetings,
and to assist staff in identifying document.
address in paragraph n. Meeting participants should come
Register online at http://ferc.gov/ particular study needs, as well as the
prepared to discuss their issues and/or
esubscribenow.htm to be notified via e- scope of environmental issues to be
concerns. Please review the Pre-
mail of new filing and issuances related addressed in the environmental
Application Document in preparation
to this or other pending projects. For document. The time and location of
for the scoping meeting. Directions on
assistance, contact FERC Online these meetings are as follows:
how to obtain a copy of the PAD and
Support. Date and Time: Wednesday,
SD1 are included in item m of this
n. With this notice, we are soliciting March 14, 2007, 1 p.m.
document.
comments on the PAD and SD1 as well Location: Fairgrounds, Robinson
as study requests. All comments on the Building, 146 West 2nd Street North, Scoping Meeting Procedures
PAD and SD1, and study requests Preston, Idaho 83263. The scoping meeting will be recorded
should be sent to the address above in Date and Time: Wednesday, by a stenographer and will become part
paragraph h. In addition, all comments March 14, 2007, 7 p.m. of the formal Commission record on the
on the PAD and SD1, study requests, Location: Fairgrounds, Robinson project.
ycherry on PROD1PC64 with NOTICES

requests for cooperating agency status, Building, 146 West 2nd Street North,
and all communications to Commission Preston, Idaho 83263. Magalie R. Salas,
staff related to the merits of the For Directions: Please call Clair Secretary.
potential application (original and eight Bosen, of Twin Lakes Canal Company at [FR Doc. E7–3216 Filed 2–23–07; 8:45 am]
copies) must be filed with the (208) 852–1612. BILLING CODE 6717–01–P

VerDate Aug<31>2005 16:03 Feb 23, 2007 Jkt 211001 PO 00000 Frm 00035 Fmt 4703 Sfmt 4703 E:\FR\FM\26FEN1.SGM 26FEN1