You are on page 1of 2

8376 Federal Register / Vol. 72, No.

37 / Monday, February 26, 2007 / Notices

Filed Date: 2/14/2007. submits revisions & amendments to its (866) 208–3676 (toll free). For TTY, call
Accession Number: 20070216–0244. Open Access Transmission & Energy (202) 502–8659.
Comment Date: 5 p.m. Eastern Time Markets Tariff relating to proposed Magalie R. Salas,
on Wednesday, March 7, 2007. amendments to the BA Agreement. Secretary.
Docket Numbers: ER07–543–000. Filed Date: 2/15/2007. [FR Doc. E7–3230 Filed 2–23–07; 8:45 am]
Applicants: Linden VFT, LLC.
Description: Linden VFT, LLC Accession Number: 20070216–0155. BILLING CODE 6717–01–P

submits a petition for authority to make Comment Date: 5 p.m. Eastern Time
sales of transmission rights at negotiated on Friday, March 23, 2007. DEPARTMENT OF ENERGY
rates acceptance of open season report Any person desiring to intervene or to
and request for waivers. protest in any of the above proceedings Federal Energy Regulatory
Filed Date: 2/14/2007. must file in accordance with Rules 211 Commission
Accession Number: 20070216–0245. and 214 of the Commission’s Rules of [Project No. 2277]
Comment Date: 5 p.m. Eastern Time Practice and Procedure (18 CFR 385.211
on Wednesday, March 7, 2007. and 385.214) on or before 5 p.m. Eastern AmerenUE; Notice of Scoping
Docket Numbers: ER07–544–000. time on the specified comment date. It Meetings and Intent To Prepare an
Applicants: PacifiCorp. is not necessary to separately intervene Environmental Document
Description: PacifiCorp submits again in a subdocket related to a
Jurisdictional Agreement w/Lehi City February 13, 2007.
compliance filing if you have previously
Power pursuant to Section 205 of the intervened in the same docket. Protests By letter dated February 2, 2007 to the
Federal Power Act. Federal Energy Regulatory Commission,
will be considered by the Commission
Filed Date: 2/14/2007. AmerenUE (licensee) affirmed its
in determining the appropriate action to
Accession Number: 20070216–0246. intention to rebuild the upper reservoir
Comment Date: 5 p.m. Eastern Time be taken, but will not serve to make
of the Taum Sauk Pumped Storage
on Wednesday, March 7, 2007. protestants parties to the proceeding.
Project (FERC No. 2277). The Taum
Anyone filing a motion to intervene or Sauk Project is located in Reynolds
Docket Numbers: ER07–545–000.
protest must serve a copy of that County, Missouri near the town of
Applicants: Commonwealth Edison
document on the Applicant. In reference Lesterville.
Company.
Description: Exelon Corporation on to filings initiating a new proceeding, The upper reservoir was severely
behalf of Commonwealth Edison interventions or protests submitted on damaged during an uncontrolled breach
Company submits a Construction or before the comment deadline need of the northwest corner of the reservoir
Agreement with High Trail Wind Farm, not be served on persons other than the on December 14, 2005. The proposed
LLC. Applicant. project involves rebuilding the upper
Filed Date: 2/14/2007. The Commission encourages reservoir with a concrete-faced,
Accession Number: 20070216–0247. electronic submission of protests and symmetrical, roller compacted concrete
Comment Date: 5 p.m. Eastern Time interventions in lieu of paper, using the (RCC) dam. The work would involve the
on Wednesday, March 7, 2007. FERC Online links at http:// complete removal of the existing rockfill
Docket Numbers: ER07–548–000. www.ferc.gov. To facilitate electronic dike that forms the upper reservoir and
Applicants: NSTAR Electric service, persons with Internet access the construction of an RCC dam using
Company. the existing rockfill as the aggregate.
who will eFile a document and/or be The Commission intends to prepare
Description: NSTAR Electric Co listed as a contact for an intervenor an environmental document under the
submits an executed wholesale must create and validate an National Environmental Policy Act
distribution service agreement for eRegistration account using the (NEPA) for the Taum Sauk upper
service to MATEP, LLC. eRegistration link. Select the eFiling reservoir rebuilding project. The NEPA
Filed Date: 2/15/2007. link to log on and submit the document will be used by the
Accession Number: 20070216–0147. intervention or protests. Commission to identify environmental
Comment Date: 5 p.m. Eastern Time
Persons unable to file electronically impacts and to identify measures that
on Thursday, March 8, 2007.
should submit an original and 14 copies would help mitigate the impacts caused
Docket Numbers: ER07–549–000. of the intervention or protest to the by construction activities. To support
Applicants: NSTAR Electric Federal Energy Regulatory Commission, and assist our environmental review, we
Company. are beginning a public scoping process
888 First St. NE., Washington, DC
Description: NSTAR Electric to ensure that all pertinent issues are
20426.
Company submits a Revised Schedule identified and analyzed, and that the
21 pursuant to Section II of the ISO New The filings in the above proceedings
environmental document is thorough
England Inc. Transmission, Markets and are accessible in the Commission’s and balanced.
Services Tariff, and requesting Waiver eLibrary system by clicking on the We invite the participation of
of the Commission’s 60-day notice appropriate link in the above list. They governmental agencies, non-
requirements. are also available for review in the governmental organizations, and the
Filed Date: 2/14/2007. Commission’s Public Reference Room in general public in the scoping process,
Accession Number: 20070216–0146. Washington, DC. There is an and will be preparing Scoping
Comment Date: 5 p.m. Eastern Time eSubscription link on the Web site that Document (SD) to provide information
on Wednesday, March 7, 2007. enables subscribers to receive e-mail on the proposed project and to solicit
ycherry on PROD1PC64 with NOTICES

Docket Numbers: ER07–550–000. notification when a document is added written and verbal comments and
Applicants: Midwest Independent to a subscribed dockets(s). For suggestions on our preliminary list of
Transmission System Operator, Inc. assistance with any FERC Online issues and alternatives to be addressed
Description: Midwest Independent service, please e-mail in the NEPA document. The SD will be
Transmission System Operator, Inc. FERCOnlineSupport@ferc.gov. or call distributed to parties on the mailing list

VerDate Aug<31>2005 16:03 Feb 23, 2007 Jkt 211001 PO 00000 Frm 00040 Fmt 4703 Sfmt 4703 E:\FR\FM\26FEN1.SGM 26FEN1
Federal Register / Vol. 72, No. 37 / Monday, February 26, 2007 / Notices 8377

for this project, as well as other issues to be addressed in the NEPA increase in flashboard height would
individuals and organizations that we document. Interested parties may also help maintain the river level at
have identified as having an interest in file written scoping comments. All such Willamette Falls at an elevation which
the Taum Sauk Project. The SD will be comments (original and eight copies) would allow the fish bypass systems to
available from our Public Reference should be filed with: Magalie R. Salas, operate at their intended design with
Room at (202) 208–1371. It will also be Secretary, Federal Energy Regulatory full powerhouse operation.
accessible online at http://www.ferc.gov Commission, 888 First Street, NE., Additionally, Portland General Electric
using the ‘‘eLibrary’’ link—select Washington, DC 20426. The deadline for Company proposes to install temporary
‘‘General Search’’, and enter ‘‘P–2277’’ filing scoping comments is April 11, adult lamprey passage structures
in the ‘‘Docket Number’’ box. You may 2007. between flashboard sections, extending
also call (202)–208–2222 for assistance. Scoping comments may be filed downstream of the dam cap to the rock
Following distribution of the SD, electronically via the Internet in lieu of shelf to provide areas for upstream adult
Commission staff will hold two scoping paper. See 18 CFR 385.2001(a)(1)(iii) or lamprey passage.
meetings on March 12, 2007, to receive the instructions on the Commission’s l. Locations of the Application: A
input on the appropriate scope of the Web site (http://www.ferc.gov) under the copy of the application is available for
environmental analysis. The first ‘‘e-Filing’’ link. inspection and reproduction at the
meeting will be with the resource Please direct any questions about the Commission’s Public Reference Room,
agencies to focus on their concerns and scoping process to Thomas J. LoVullo at located at 888 First Street, NE., Room
the second meeting will be with the (202) 502–8900. 2A, Washington, DC 20426, or by calling
general public to receive their input. (202) 502–8371. Information about this
Magalie R. Salas, filing may also be viewed on the
Each meeting is open and the public
and agencies may attend either or both Secretary. Commission’s Web site at http://
meetings. The times and locations of [FR Doc. E7–3185 Filed 2–23–07; 8:45 am] www.ferc.gov; using the ‘‘eLibrary’’ link.
these meetings are as follows: BILLING CODE 6717–01–P Enter the docket number excluding the
last three digits in the docket number
Agency Scoping Meeting field to access the document. You may
Date: March 12, 2007. DEPARTMENT OF ENERGY also register online at http://
Time: 9 a.m. to 11:30 a.m. (CST). www.ferc.gov/docs-filing/
Location: Missouri Department of Federal Energy Regulatory esubscription.asp to be notified via e-
Natural Resources, Elm Street Commission mail of new filings and issuances
Conference Center, 1738 East Elm related to this or other pending projects.
Street, Jefferson City, Missouri 65102. Notice of Application for Amendment
For assistance, call 1–866–208–3676 or
of License and Soliciting Comments,
Public Scoping Meeting e-mail FERCOnlineSupport@ferc.gov;
Motions To Intervene, and Protests
for TTY, call (202) 502–8659. A copy is
Date: March 12, 2007. February 16, 2007. also available for inspection and
Time: 7 p.m. to 9 p.m. (CST). reproduction at the address in item (h)
Location: Lesterville High School, Take notice that the following
application has been filed with the above.
State Highway 21, Lesterville, Missouri m. Individuals desiring to be included
63654. Commission and is available for public
inspection: on the Commission’s mailing list should
At the scoping meetings, Commission a. Application Type: Non-Capacity so indicate by writing to the Secretary
staff will: (1) Summarize the Amendment of License. of the Commission.
environmental issues tentatively b. Project No.: 2233–066. n. Comments, Protests, or Motions to
identified for analysis in the c. Date Filed: December 29, 2006. Intervene—Anyone may submit
environmental document; (2) solicit d. Applicant: Portland General comments, a protest, or a motion to
from the meeting participants all Electric Company. intervene in accordance with the
available information, especially e. Name of Project: Willamette Falls requirements of Rules of Practice and
quantifiable data, on the resources at Hydroelectric Project. Procedure, 18 CFR 385.210, .211, .214.
issue; (3) encourage statements from f. Location: The Willamette Falls In determining the appropriate action to
experts and the public on issues that Project is located on the Willamette take, the Commission will consider all
should be analyzed in the Commission’s River near the cities of West Linn and protests or other comments filed, but
NEPA document, including viewpoints Oregon City, Oregon. only those who file a motion to
in opposition to, or in support of, staff’s g. Filed Pursuant to: Federal Power intervene in accordance with the
preliminary views expressed in the SD; Act, 16 U.S.C. 791a—825r. Commission’s Rules may become a
(4) determine the resource issues to be h. Applicant Contact: Ms. Julie A. party to the proceeding. Any comments,
addressed in the NEPA document; and Keil, Director, Hydro Licensing, protests, or motions to intervene must
(5) identify those issues that require a Portland General Electric Company, 121 be received on or before the specified
detailed analysis, as well as those issues SW. Salmon Street, Portland, Oregon comment date for the particular
that do not require a detailed analysis. 97204, telephone: (503) 464–8864. application.
Staff will also be soliciting input on i. FERC Contact: Any questions on o. Filing and Service of Responsive
potential measures that could be this notice should be addressed to Ms. Documents—Any filings must bear in
implemented to minimize construction- Linda Stewart at (202) 502–6680, or e- all capital letters the title
related impacts. The meetings will be mail address: linda.stewart@ferc.gov. ‘‘COMMENTS’’, ‘‘PROTEST’’, or
recorded by a stenographer and become j. Deadline for filing comments and or ‘‘MOTION TO INTERVENE’’, as
part of the formal record for this project. motions: March 15, 2007. applicable, and the Project Number of
ycherry on PROD1PC64 with NOTICES

Individuals, organizations, and k. Description of Request: Portland the particular application to which the
agencies with environmental expertise General Electric Company proposes to filing refers. All documents (original
and concerns are encouraged to attend increase the flashboard height on the and eight copies) should be filed with:
the meetings and assist Commission concrete dam along the crest of Magalie R. Salas, Secretary, Federal
staff in defining and clarifying the Willamette Falls from 2 to 3.5 feet. The Energy Regulatory Commission, 888

VerDate Aug<31>2005 16:03 Feb 23, 2007 Jkt 211001 PO 00000 Frm 00041 Fmt 4703 Sfmt 4703 E:\FR\FM\26FEN1.SGM 26FEN1

You might also like