Professional Documents
Culture Documents
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
Asked At
IBM
IBM
IBM / Wipro
IBM
IBM
IBM
IBM
IBM
IBM
IBM
IBM / Wipro
IBM / Wipro
Wipro
Wipro
Wipro
Wipro
Wipro
Colgate
Colgate
Colgate
Colgate
Colgate
Colgate
Colgate
Colgate
Colgate
Online, Background, Single Item Multi Level, Single Item single Level,
Consistant, Level by Level & Delta
Static, Time based and Dynamic
14 Step process recording for uploading data into SAPdb
Only capacity will be planned
Discreat and Repititive
Through Alternate material Group
Basic Date Scheduling is
Lead Time scheduling is
Planned order generation after 4 days.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
Mr. Shayam
Give your brief introduction
Other projects of company
Team Size
Different types of MRP
Different types of MRP type
Different types of SOP
Lot sizing procedure
LSMW / BDC
Production Order > Backward > Forward > Capacity
Production Scenario
BOM > How to add alternate material
MRP > Scheduling Key > Basic Date Scheduling vs Lead Time Scheduling
Schedule Marging Key > 1+1+1+1 > What will happen if ordered today
PP views in Material Master
Variant Configuration Dependency Type
Variant Configuration Dependency Type Difference
PP-QM Integration
How to add inspection check points in routing
1
1
0
0
0
0
1
0
0
1
2
2
2
0
0
10
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
30
Fully Answered
Partially Answered
Not Answered
33.33%
01/03/2009 to 22/09/2009
to 22/09/2009
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
0
2
0
2
0
0
2
2
0
0
0
0
0
2
0
0
10
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
32
Fully Answered
Partially Answered
Not Answered
31.25%
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
19
20
21
22
23
24
18
Split Valuation
MRP
Material Master Views
Production strategies 10, 11, 20 and 40
X Plant Material Status
MRP Screen Description
What is the error in Material master if MRP gives 1000 PrdOrd against 60
What is the error in Material master if MRP gives 0 PrdOrd against 60
Safety Stock
Safety Stock Example
MRP Area
Planning time fence
Range of coverage
MRP for 50 plants
MRP Run types
Planning time fence in calender days or in work days
Tick in MRP3 function
Valuation class
Valuation class function
Valuation class linking to GL account
Engineering Change Management
How many document numbers if BOM with Alternate Material Group is created
NETCH, NETPL, NETUPL
Order settlement
2
2
2
2
0
2
0
0
2
2
0
2
0
0
2
2
0
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
32
46
Fully Answered
Partially Answered
Not Answered
69.57%
MRP Type
Key that determines whether and how the material is planned. You have the following options:
Manual reorder point planning
Automatic reorder point planning
Forecast-based planning
Material requirements planning with forecasts for unplanned consumption
Master production scheduling (MPS)
Specifies the number of the MRP controller or group of MRP controllers responsible for material plannin
Key for a buyer or a group of buyers, who is/are responsible for certain purchasing activities.
Use
Internally, the purchasing group is responsible for the procurement of a material or a class of material
Externally, it is the medium through which contacts with the vendor are maintained.
MRP Controller is responsible for Planning the material whereas the Purchasing Group is responsible fo
MD01
MDBT
MD40
10-Net Requirements Planning: This planning strategy is particularly useful in mass production en
determined by a production plan (Demand Management) and if you do not want sales orders to influe
program.
11-Gross Requirements Planning: The make-to-stock strategy gross requirements planning is part
useful if you need to produce, regardless of whether you have stock or not. For instance, steel or ceme
continue to produce, even if this means having to produce to stock.
Stock is not considered for calculating Planned Orders
30-Production by Lot Size: This strategy is particularly useful for companies that mainly produce fo
40-Planning with Final Assembly: This strategy is probably the most widely used make-to-stock st
Planned independent requirements are consumed by incoming sales orders so that the master plan is
you can react quickly to customers requirements. The smoothing of the master plan is less important
50-Planning w/o Final Assembly: Use this planning strategy when the main value-added process is
This strategy and Planning with a Planning Material (60) are probably the most widely-used strategies
every customer; in other words, it is not possible to change the stock for different sales orders.
63-Planning w/ a Planning Material and w/o MTO: This strategy allows you to procure non-variab
is based on actual sales orders. This procedure allows you to react quickly to customer requirements,
First Round
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
Second Round
1
2
3
4
5
6
7
8
9
econd Round
Production Strategies
Manufacturing Techniques
How Manufacturing Techniques are mapped in SAP
Gaps handling
How handled the enhancement for GAPS
What will happen if changes are made in Standard BOM
How to make different T Code for enhancement for GAPS
What document given to ABAPer for manking Enhancement
T Code for Routing
0
2
2
2
2
0
2
0
2
2
2
2
2
2
2
2
2
28
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
34
0
1
0
0
1
0
1
0
2
2
2
2
2
2
2
2
0
3
20
36
Fully Answered
Partially Answered
Not Answered
82.35%
8.33%
2
2
20
24
0.00%
First Round
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Second Round
1
2
3
4
5
6
7
8
9
econd Round
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
30
Fully Answered
Partially Answered
Not Answered
0.00%
2
2
2
2
2
2
2
2
20
36
0.00%