You are on page 1of 2

2260 Federal Register / Vol. 72, No.

11 / Thursday, January 18, 2007 / Notices

pine), in a multistoried arrangement. The proposed action could have both statements must structure their
Existing canopy closures and stem beneficial and adverse effects on forest participation in the environmental
densities are very high and these resources. In addition to the proposed review of the proposal so it is
conditions do not favor the regeneration action, a range of alternatives will be meaningful and alerts the agency to the
of shade intolerant species such as larch developed in response to issues reviewer’s position and contentions
and ponderosa pine. Historically, identified during scoping. One of these (Vermont Yankee Nuclear Power Corp.
wildfires at roughly 15–40 year intervals will be the ‘‘no-action’’ alternative, v. NRDC, 435 U.S. 519, 533 (1978)).
created conditions in which these low- which would not allow vegetation Also, environmental objections that
to-moderate severity burned forests manipulation through harvest or any could be raised at the draft
were generally more open but also more road decommissioning under this environmental impact statement stage
spatially diverse at the stand, watershed analysis. Other alternatives may but are not raised until after completion
and landscape scales. In addition, these examine various combinations of of the final environmental impact
fires resulted in site preparation for treatment areas. The Forest Service will statement may be waived or dismissed
larch and ponderosa pine regeneration, analyze and document the direct, by the courts (City of Angoon v. Hodel,
created fire killed patches of wildlife indirect, and cumulative environmental 803 F.2d 1016, 1022 (9th Cir. 1986) and
habitat, and also scarred large diameter effects of the alternatives. In addition, Wisconsin Heritages v. Harris, 490 F.
trees, resulting in long standing snags. the EIS will include site specific Supp. 1334, 1338 (E.D. Wis. 1980)).
Species dependant on large diameter mitigation measures and discussions Because of these court rulings, it is very
snags, old forests with open understory about their effectiveness. important those interested in this
and a heterogeneous distribution of Public participation is important to proposed action participate by the close
habitat conditions across the landscape the analysis. People may visit with of the 45-day comment period so
benefit under these conditions. Such Forest Service officials at any time substantive comments and objections
species include Flammulated owls, during the analysis and prior to the are made available to the Forest Service
northern goshawks and pileated decision. No formal scoping meetings at a time when it can meaningfully
woodpeckers. are planned. However, two periods are consider them and respond to them in
The decision to be made is to what specifically designated for comments on the final environmental impact
extent, if at all, the Forest Service the analysis: statement.
should conduct timber harvest, (1) During this scoping process and To assist the Forest Service in
prescribed burning, road construction or (2) During the draft EIS comment identifying and considering issues and
reconstruction, road reclamation, and period. concerns on the proposed action,
road closures in the Lolo Creek During the scoping process, the Forest comments on the draft environmental
drainage, given the above purpose and Service is seeking information and impact statement should be as specific
need. This is a site-specific project comments from Federal, State, and local as possible. It is also helpful if
decision, not a general management agencies and other individuals or comments refer to specific pages or
plan nor a programmatic analysis. organizations that may be interested in chapters of the draft statement.
Public scoping has been conducted on or affected by the proposed action. A Comments may also address the
most elements of this proposal both scoping document will be mailed to adequacy of the draft environmental
with this proposal and an earlier version parties known to be interested in the impact statement or the merits of the
of this proposal. proposed action. The agency invites alternatives formulated and discussed in
While quite a number of issues have written comments and suggestions on the statement. Reviews may wish to
been identified for environmental this action, particularly in terms of refer to the council on Environmental
effects analysis, the following issues issues and alternatives. Persons who quality Regulations for implementing
have been found significant enough to provided comments in the past on this the procedural provisions of the
guide alternative development and project do not have to resubmit them. National Environmental Policy Act at 40
provide focus for the EIS: Those previously stated concerns will CFR 1503.3 in addressing these points.
(1) Water quality and fisheries habitat be incorporated into this analysis. I am the responsible official for this
effects resulting from timber harvest and The Forest Service will continue to environmental impact statement. My
road construction and rehabilitation involve the public and will inform address is Lolo National Forest,
activities; interested and affected parties as to how Building 24, Fort Missoula, MT 59804.
(2) Wildlife habitat effects resulting they may participate and contribute to
from timber harvest and road the final decision. Another formal Dated: January 11, 2007.
construction and rehabilitation opportunity for public response will be Deborah L. R. Austin,
activities; provided following completion of a Forest Supervisor, Lolo National Forest.
(3) Effects of treatments on site draft EIS. [FR Doc. 07–158 Filed 1–17–07; 8:45 am]
productivity, forest health, vegetative The draft EIS should be available for BILLING CODE 3410–11–M
condition, and species composition, review in June 2007. The final EIS is
individually and cumulatively, scheduled for completion in September
(4) Effects of treatment on area scenic of 2007. DEPARTMENT OF AGRICULTURE
values, and The comment period on the draft EIS
(5) Economic effects on local will be 45 days from the date the Forest Service
communities resulting from different Environmental Protection Agency
intensities of restoration treatments and publishes the notice of availability in Black Hills National Forest Advisory
resulting timber values. the Federal Register. Board Public Meeting Dates
The Lolo Forest Plan provides the The Forest Service believes it is Announced
pwalker on PROD1PC71 with NOTICES

overall guidance for management important, at this early, to give AGENCY: Forest Service, USDA.
activities in the project area through its reviewers notice of several court rulings ACTION: Notice of Meetings.
Goals, Objectives, Standards and related to public participation in the
Guidelines, and Management Area environmental review process. First, SUMMARY: The Black Hills National
direction. reviewers of draft environmental impact Forest Advisory Board (NFAB) has

VerDate Aug<31>2005 17:52 Jan 17, 2007 Jkt 211001 PO 00000 Frm 00009 Fmt 4703 Sfmt 4703 E:\FR\FM\18JAN1.SGM 18JAN1
Federal Register / Vol. 72, No. 11 / Thursday, January 18, 2007 / Notices 2261

announced its meeting dates for 2007. Briefing Agenda currently due no later than January 31,
These meetings are open to the public, No Child Left Behind and Supplemental 2007.
and public comment is accepted at any Educational Services. Extension of Time Limit for Preliminary
time in writing and during the last 15 • Introductory Remarks by Chairman. Results of Antidumping Duty
minutes of each meeting for spoken • Speakers’ Presentation. Administrative Reviews
comments. Persons wishing to speak are • Questions by Commissioners and
given three minutes to address the Staff Director. Section 751(a)(3)(A) of the Tariff Act
Board. of 1930, as amended (the Act), requires
CONTACT PERSON FOR FURTHER
Meeting dates are the third the Department to make a preliminary
INFORMATION: Manuel Alba, Press
and
Wednesday of each month unless determination within 245 days after the
Communications, (202) 376–8582.
otherwise indicated: January 3 last day of the anniversary month of an
(Previously announced), February 21, Kenneth L. Marcus, order for which a review is requested
March 21, April 18, May 16, June 20, Staff Director. and a final determination within 120
July 18, August 15 (Summer Field [FR Doc. 07–215 Filed 1–16–07; 3:03 pm] days after the date on which the
Trip—TBA), September 19, October 17, BILLING CODE 6335–01–P
preliminary determination is published.
November 21. No meeting in December, If it is not practicable to complete the
January 2, 2007 (Tentative). review within these time periods,
ADDRESSES: Meetings will begin at 1 DEPARTMENT OF COMMERCE section 751(a)(3)(A) of the Act allows
p.m. and end no later than 5 p.m. at the the Department to extend the time limit
Forest Service Center, 8221 S. Highway International Trade Administration for the preliminary determination to a
16, Rapid City, SD 57702. maximum of 365 days after the last day
A–427–801, A–428–801, A–475–801, A–588– of the anniversary month.
Agendas: The Board will consider a 804, A–559–801, A–412–801
variety of issues related to national We determine that it is not practicable
forest management. Agendas will be Ball Bearings and Parts Thereof From to complete the preliminary results of
announced in advance in the news France, Germany, Italy, Japan, these reviews within the original time
media but principally concern Singapore, and the United Kingdom: limit because of the number of
implementing phase two of the forest Extension of Time Limit for Preliminary respondents in these reviews, plans to
land and resource management plan, Results of Antidumping Duty verify certain respondents’ information,
travel planning, and key issues related Administrative Reviews and the complexity of the issues under
to the Chief of the Forest Service’s Four analysis, such as further–manufacturing
AGENCY: Import Administration, operations in the United States and the
Threats; fire and fuels, off highway
International Trade Administration, ‘‘collapsing’’ of companies. Therefore,
vehicle management, open space, and
Department of Commerce. we are extending the time period for
invasive species control. The Board will
consider such topics as biomass and EFFECTIVE DATE: January 18, 2007. issuing the preliminary results of these
Bioenergy, recreation use fees, facility FOR FURTHER INFORMATION CONTACT: reviews by 45 days until March 19,
master planning, and an integrated Yang Jin Chun or Richard Rimlinger, 2007.
lands programs, among others. AD/CVD Operations Office 5, Import This notice is published in
Administration, International Trade accordance with section 751(a)(3)(A) of
FOR FURTHER INFORMATION CONTACT: the Act and 19 CFR 351.213(h)(2).
Administration, U.S. Department of
Frank Carroll, Committee Management
Commerce, 14th Street and Constitution Dated: January 11, 2007.
Officer, or Twila Morris, Executive
Avenue, NW, Washington, DC 20230; Stephen J. Claeys,
Assistant, Black Hills National Forest,
telephone: (202) 482–5760 and (202) Deputy Assistant Secretaryfor Import
1019 N. 5th Street, Custer, SD 57730,
482–4477, respectively. Administration.
(605) 673–9200.
SUPPLEMENTARY INFORMATION: [FR Doc. E7–657 Filed 1–17–07; 8:45 am]
Dated: January 10, 2007.
BILLING CODE 3510–DS–S
Craig Bobzien, Background
Forest Supervisor. At the request of interested parties,
[FR Doc. 07–157 Filed 1–17–07; 8:45 am] the Department of Commerce (the DEPARTMENT OF COMMERCE
BILLING CODE 3410–11–M Department) initiated administrative
reviews of the antidumping duty orders International Trade Administration
on ball bearings and parts thereof from
France, Germany, Italy, Japan, (A–401–806)
COMMISSION ON CIVIL RIGHTS Singapore, and the United Kingdom for
the period May 1, 2005, through April Notice of Extension of Time Limit for
Sunshine Act Notice 30, 2006. See Initiation of Antidumping Final Results of Antidumping Duty
and Countervailing Duty Administrative Administrative Review: Stainless Steel
DATE AND TIME: Friday, January 26, 2007, Reviews, 71 FR 37892 (July 3, 2006). On Wire Rod from Sweden
9 a.m. October 16, 2006, we rescinded in part
PLACE: U.S. Commission on Civil Rights, the administrative reviews of the AGENCY: Import Administration,
624 Ninth Street, NW., Rm. 540, antidumping duty orders on ball International Trade Administration,
Washington, DC 20425. bearings and parts thereof from France, U.S. Department of Commerce.
Germany, Japan, and the United EFFECTIVE DATE: January 18, 2007.
Meeting Agenda
Kingdom. See Ball Bearings and Parts FOR FURTHER INFORMATION CONTACT:
pwalker on PROD1PC71 with NOTICES

I. Approval of Agenda. Thereof from France, et al.: Notice of Brian Smith, AD/CVD Operations,
II. Approval of Minutes of December 14, Partial Rescission of Antidumping Duty Office 2, Import Administration,
Meeting. Administrative Reviews, 71 FR 60688 International Trade Administration,
III. Announcements. (October 16, 2006). The preliminary U.S. Department of Commerce, 14th
IV. Adjourn. results of the reviews still underway are Street and Constitution Avenue, NW,

VerDate Aug<31>2005 18:26 Jan 17, 2007 Jkt 211001 PO 00000 Frm 00010 Fmt 4703 Sfmt 4703 E:\FR\FM\18JAN1.SGM 18JAN1

You might also like