You are on page 1of 59

Jo

Ti b
m
e

Time Table
Day 1

Filling Slops
Line Flushing
No 1 COT P
No 1 COT S
No 2 COT P
No 2 COT S
No 3 COT P
No 3 COT S
No 4 COT P
No 4 COT S
No 5 COT P
No 5 COT S
No 6 COT P
No 6 COT S
No SLOP P
No SLOP S

1
2
Filling Slops

10

11

12

Line Flushing
Purging (G1A)

Purging
Purging (G3A)
Purging (G1B)

Purging (G3B)
Filling Slops

Purging Slop P
Purging Slop S

Engine Pre

13

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

Tank Washing (G1)


Stripping 15min per tanks
Tank Washing (G2)
Stripping 15min per tanks

Purging (G2A)

Tank Washi
Stripping 15mi
Tank Washing (G1)
Stripping 15min per tanks
Purging (G2B)

Tank Washing (G2)


Stripping 15min per tanks

Tank Washi
Stripping 15mi

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

Gas Freeing (G1A)


Gas Freeing (G2A)
Tank Washing (G1)
Stripping 15min per tanks

Tank Washing (G1)


Stripping 15min per tanks
Slop P

Gas Freeing with Water Driven Fan

43

ater Driven Fan

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

Gas Freeing (G3A)


Gas Freeing (G1B)
Gas Freeing

59

60

61

62

63

64

65

66

67

68

69

70

71

72

73

74

Gas Freeing (G2B)


Gas Freeing (G3B)
Slop Discharging

74

75

Slop Discharging

76

77

78

79

80

81

82

83

84

85

86

87

88

89

89

90

91

92

93

94

95

96

Jo
Ti b
m
e

Day 1
0

10

11

13

14

15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30

Line Flushing
No 1 COT P
Purging (G1A)
No 1 COT S
No 2 COT P
No 2 COT S
No 3 COT P
No 3 COT S
No 4 COT P
No 4 COT S
No 5 COT P
No 5 COT S
No 6 COT P
No 6 COT S
SLOP P
Purging
SLOP S
Slops
Filling Slops
Heating
Cargo Line Test
Cargo Line Vent.
Bunker Tank Vent.
Void Space Vent.
Resposile Officer
Master
Trainee Master
Chf Officer
Second Officer
Third Officer
Fourth Officer
Extra Officer
Pump Man
Bosun
AB 1
AB 2
AB 3

Time Table
12

Line Flushing
Tank Washing ( G 1)

Gas Free

Purging (G2A)

Tank Wa
Purging (G1B)

Tank Washing ( G 1)
Purging

Tank Wa

Chief Officer is the overall responsible officer entire operation. The Responsible office

Jo
Ti b
m
e

Time Table
14

15

16

17

18

19

20

21

22

23

45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60

Line Flushing
No 1 COT PGas Freeing with Water Driven Fan
No 1 COT S
No 2 COT P
Tank Washing ( G3)
No 2 COT S
No 3 COT PTank Washing ( G2)
Purging (G3A)
No 3 COT S
No 4 COT P
No 4 COT S
No 5 COT PPurging (G2B)
Tank Washing ( G3)
No 5 COT S
No 6 COT PTank Washing ( G3)
No 6 COT S
SLOP P
SLOP S
Heating
Cargo Line Test
Cargo Line Vent.
Bunker Tank Vent.
Void Space Vent.

tion.
The Responsible
Resposile
Officer officer may change during operation.
Master
Trainee Master
Chf Officer
Second Officer
Third Officer
Fourth Officer
Extra Officer
Pump Man
Bosun
AB 1
AB 2
AB 3

Purging (G3B)

Jo
Ti b
m
e

Line Flushing
No 1 COT P
No 1 COT S
No 2 COT P
No 2 COT S
No 3 COT P
No 3 COT S
No 4 COT P
No 4 COT S
No 5 COT P
No 5 COT S
No 6 COT P
No 6 COT S
SLOP P
SLOP S
Heating
Cargo Line Test
Cargo Line Vent.
Bunker Tank Vent.
Void Space Vent.
Resposile Officer
Master
Trainee Master
Chf Officer
Second Officer
Third Officer
Fourth Officer
Extra Officer
Pump Man
Bosun
AB 1
AB 2
AB 3

Day 2
24

25

26

27

28

29

30

31

32

33

34

35

Time Table
36

37

38

15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30

Gas Freeing G 2A

Gas Freeing G2B

Slop Washing

Chief Officer is the overall responsible officer entire operation. The Responsible office

Jo
Ti b
m
e

Time Table
38

39

40

41

42

43

44

45

46

47

45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60

Line Flushing
No 1 COT P
No 1 COT S
No 2 COT P
No 2 COT S
No 3 COT P
No 3 COT S
No 4 COT P
No 4 COT S
No 5 COT P
No 5 COT S
No 6 COT P
No 6 COT S
SLOP P
SLOP S
Heating
Cargo Line Test
Cargo Line Vent.
Bunker Tank Vent.
Void Space Vent.

tion.
The Responsible
Resposile
Officer officer may change during operation.
Master
Trainee Master
Chf Officer
Second Officer
Third Officer
Fourth Officer
Extra Officer
Pump Man
Bosun
AB 1
AB 2
AB 3

Gas Freeing G3A

Jo
Ti b
m
e

Line Flushing
No 1 COT P
No 1 COT S
No 2 COT P
No 2 COT S
No 3 COT P
No 3 COT S
No 4 COT P
No 4 COT S
No 5 COT P
No 5 COT S
No 6 COT P
No 6 COT S
SLOP P
SLOP S
Heating
Cargo Line Test
Cargo Line Vent.
Bunker Tank Vent.
Void Space Vent.
Resposile Officer
Master
Trainee Master
Chf Officer
Second Officer
Third Officer
Fourth Officer
Extra Officer
Pump Man
Bosun
AB 1
AB 2
AB 3

Day3
48

49

50

51

52

53

54

55

56

57

58

59

Time Table
60

61

62

15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30

Gas Freeing G3B

Chief Officer is the overall responsible officer entire operation. The Responsible office

Jo
Ti b
m
e

Time Table
62

Line Flushing
No 1 COT P
No 1 COT S
No 2 COT P
No 2 COT S
No 3 COT P
No 3 COT S
No 4 COT P
No 4 COT S
No 5 COT P
No 5 COT S
No 6 COT P
No 6 COT S
SLOP P
SLOP S
Heating
Cargo Line Test
Cargo Line Vent.
Bunker Tank Vent.
Void Space Vent.

63

64

65

66

67

68

69

70

71

45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60

Gas Freeing G1B

tion.
The Responsible
Resposile
Officer officer may change during operation.
Master
Trainee Master
Chf Officer
Second Officer
Third Officer
Fourth Officer
Extra Officer
Pump Man
Bosun
AB 1
AB 2
AB 3

Jo
Ti b
m
e

Line Flushing
No 1 COT P
No 1 COT S
No 2 COT P
No 2 COT S
No 3 COT P
No 3 COT S
No 4 COT P
No 4 COT S
No 5 COT P
No 5 COT S
No 6 COT P
No 6 COT S
SLOP P
SLOP S
Heating
Cargo Line Test
Cargo Line Vent.
Bunker Tank Vent.
Void Space Vent.
Resposile Officer
Master
Trainee Master
Chf Officer
Second Officer
Third Officer
Fourth Officer
Extra Officer
Pump Man
Bosun
AB 1
AB 2
AB 3

Day 4
72

73

74

75

76

77

78

79

80

81

82

83

Time Table
84

85

86

15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30

Gas Freeing G1A

Slop Disc
Line Test

Chief Officer is the overall responsible officer entire operation. The Responsible office

Jo
Ti b
m
e

Time Table
86

87

88

89

90

91

92

93

94

95

45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60

Line Flushing
No 1 COT P
No 1 COT S
No 2 COT P
No 2 COT S
No 3 COT P
No 3 COT S
No 4 COT P
No 4 COT S
No 5 COT P
No 5 COT S
No 6 COT P
No 6 COT S
SLOP P
SLOP S Slop Discharging
Heating
Cargo Line Test
Cargo Line Vent.
Bunker Tank Vent.
Void Space Vent.

tion.
The Responsible
Resposile
Officer officer may change during operation.
Master
Trainee Master
Chf Officer
Second Officer
Third Officer
Fourth Officer
Extra Officer
Pump Man
Bosun
AB 1
AB 2
AB 3

Jo
Ti b
m
e

Day 5
96

97

99

100

101

102

103

104

105

106

110

15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30

Line Flushing
No 1 COT P
No 1 COT S
No 2 COT P
No 2 COT S
No 3 COT P
No 3 COT S
No 4 COT P
No 4 COT S
No 5 COT P
No 5 COT S
No 6 COT P
No 6 COT S
SLOP P
SLOP S
Slop Washing
Heating
Cargo Line Test
Cargo Line Vent.
Bunker Tank Vent.
Void Space Vent.
Resposile Officer
Master
Trainee Master
Chf Officer
Second Officer
Third Officer
Fourth Officer
Extra Officer
Pump Man
Bosun
AB 1
AB 2
AB 3

98

Time Table
107
108
109

Gas Freeing

Slop Washing

Gas Freeing
Gas Freeing

Chief Officer is the overall responsible officer entire operation. The Responsible office

Jo
Ti b
m
e

Time Table
110

111

112

113

114

115

116

117

118

119

45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60

Line Flushing
No 1 COT P
No 1 COT S
No 2 COT P
No 2 COT S
No 3 COT P
No 3 COT S
No 4 COT P
No 4 COT S
No 5 COT P
No 5 COT S
No 6 COT P
No 6 COT S
SLOP P
SLOP S
Heating
Cargo Line Test
Cargo Line Vent.
Bunker Tank Vent.
Void Space Vent.

tion.
The Responsible
Resposile
Officer officer may change during operation.
Master
Trainee Master
Chf Officer
Second Officer
Third Officer
Fourth Officer
Extra Officer
Pump Man
Bosun
AB 1
AB 2
AB 3

Jo
Ti b
m
e

Day 1
0

10

11

Time Table
12

13

14

15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30

AB 4
AB 5
Cadet

Heating Slops up to 65C


Filling Slops
Slop water stabilition
Slop Discharging

Slop Washing
Main Inert Fan
Line Flushing
Engine Preparedness

Gas Freeing (Main Inert Fan)


Gas Freeing (Water Driven Fan)
Slop Washing/Discharging will be
simultaneously performed

Bridge Watch
Deck Watch
Purging (Mai

Jo
Ti b
m
e

Time Table
14

15

16

17

18

19

20

21

22

23

45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60

AB 4
AB 5
Cadet

Bridge Watch
Deck Watch
Purging (Main Fan)

G 1A 1P/S COT
G 2A 2P/S COT
G 3A 3P/S COT

G 1B 4P/S COT
G 2B 5P/S COT
G 3B 6P/S COT

Jo
Ti b
m
e

Day 2
24

25

26

27

28

29

30

31

32

33

34

35

Time Table
36

37

38

15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30

AB 4
AB 5
Cadet

Heating Slops up to 65C


Filling Slops
Slop water stabilition
Slop Discharging

Slop Washing
Main Inert Fan
Line Flushing
Engine Preparedness

Gas Freeing (Main Inert Fan)


Gas Freeing (Water Driven Fan)
Slop Washing/Discharging will be
simultaneously performed

Bridge Watch
Deck Watch
Purging (Mai

Jo
Ti b
m
e

Time Table
38

39

40

41

42

43

44

45

46

47

45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60

AB 4
AB 5
Cadet

Bridge Watch
Deck Watch
Purging (Main Fan)

G 1A 1P/S COT
G 2A 2P/S COT
G 3A 3P/S COT

G 1B 4P/S COT
G 2B 5P/S COT
G 3B 6P/S COT

Jo
Ti b
m
e

Day3
48

49

50

51

52

53

54

55

56

57

58

59

Time Table
60

61

62

15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30

AB 4
AB 5
Cadet

Heating Slops up to 65C


Filling Slops
Slop water stabilition
Slop Discharging

Slop Washing
Main Inert Fan
Line Flushing
Engine Preparedness

Gas Freeing (Main Inert Fan)


Gas Freeing (Water Driven Fan)
Slop Washing/Discharging will be
simultaneously performed

Bridge Watch
Deck Watch
Purging (Mai

Jo
Ti b
m
e

Time Table
62

63

64

65

66

67

68

69

70

71

45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60

AB 4
AB 5
Cadet

Bridge Watch
Deck Watch
Purging (Main Fan)

G 1A 1P/S COT
G 2A 2P/S COT
G 3A 3P/S COT

G 1B 4P/S COT
G 2B 5P/S COT
G 3B 6P/S COT

Jo
Ti b
m
e

Day 4
72

73

74

75

76

77

78

79

80

81

82

83

Time Table
84

85

86

15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30

AB 4
AB 5
Cadet

Heating Slops up to 65C


Filling Slops
Slop water stabilition
Slop Discharging

Slop Washing
Main Inert Fan
Line Flushing
Engine Preparedness

Gas Freeing (Main Inert Fan)


Gas Freeing (Water Driven Fan)
Slop Washing/Discharging will be
simultaneously performed

Bridge Watch
Deck Watch
Purging (Mai

Jo
Ti b
m
e

Time Table
86

87

88

89

90

91

92

93

94

95

45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60

AB 4
AB 5
Cadet

Bridge Watch
Deck Watch
Purging (Main Fan)

G 1A 1P/S COT
G 2A 2P/S COT
G 3A 3P/S COT

G 1B 4P/S COT
G 2B 5P/S COT
G 3B 6P/S COT

Jo
Ti b
m
e

Day 5
96

97

98

99

100

101

102

103

104

105

106

Time Table
107
108
109

110

15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30

AB 4
AB 5
Cadet

Heating Slops up to 65C


Filling Slops
Slop water stabilition
Slop Discharging

Slop Washing
Main Inert Fan
Line Flushing
Engine Preparedness

Gas Freeing (Main Inert Fan)


Gas Freeing (Water Driven Fan)
Slop Washing/Discharging will be
simultaneously performed

Bridge Watch
Deck Watch
Purging (Mai

Jo
Ti b
m
e

Time Table
110

111

112

113

114

115

116

117

118

119

45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60 15 30 45 60

AB 4
AB 5
Cadet

Bridge Watch
Deck Watch
Purging (Main Fan)

G 1A 1P/S COT
G 2A 2P/S COT
G 3A 3P/S COT

G 1B 4P/S COT
G 2B 5P/S COT
G 3B 6P/S COT

Engine
Load

RPM

Run
No

59

59

69

69

75

75

80

80

40

60

75

90

Fwd
Return

Lat

Long

Speed
(SOG)
STW
Log
GPS
Log

Fwd

03 17.4 N

105 03.2 E

10.90 10.60 11.20

F 16 28 58 Return

03 00.1 N

104 51.5 E

11.40 12.00 11.50

S 16 57 34

03 00.8 N

104 51.7 E

10.60 10.80 11.10

F 17 55 10 Return

03 09.1 N

104 57.8 E

11.20 11.70 12.10

S 19 00 45

03 17.2 N

105 03.2 E

11.50 12.60 12.50

F 20 32 26 Return

02 59.8 N

104 51.7 E

13.20 13.90 14.10

S 20 57 24

03 00.0 N

104 51.7 E

11.70 12.40 13.00

F 22 29 34 Return

03 17.5 N

105 03.3 E

13.60 14.20 14.40

S 22 45 38

03 17.3 N

105 03.3 E

13.00 13.70 13.30

F 00 12 11 Return

02 59.8 N

104 51.5 E

14.50 15.30 14.40

S 00 33 05

03 00.0 N

104 51.6 E

12.30 13.00 14.00

F 02 02 10 Return

03 17.5 N

105 03.3 E

14.00 14.70 15.60

S 02 23 50

03 17.5 N

105 03.2 E

14.90 15.70 14.90

F 03 41 45 Return

03 30.0 N

104 51.5 E

15.40 16.20 15.90

S 04 06 31

Fwd

03 00.1 N

104 51.5 E

13.80 14.50 15.36

Return

--

--

Time
H M'S"
S 14 36 20

--

Fwd
Fwd
Fwd
Fwd
Fwd
Fwd

Position

--

--

--

1 Mile RUN
Time in
Average
second

Speed

304.6

11.82 Kts

308.5

11.67 Kts

263.86

13.64 Kts

271

13.28 Kts

238.19

15.11 Kts

259.65

13.86 Kts

222.91

16.15 Kts

245.88

14.64 Kts

Run
No

Time
(utc+8)

Fwd
Return

Position
Lat

Long

Heading
Gyro COG

Speed
Weather Element
(SOG)
Speed(STW)
Sea
Swel
Log
GPS
Log
GPS Temp Depth Current State Driction Height Period Height

Run
No

Time
(utc+8)

Fwd
Return

Position
Lat

Long

Heading
Gyro COG

Speed
Weather Element
(SOG)
Speed(STW)
Sea
Swel
Log
GPS
Log
GPS Temp Depth Current State Driction Height Period Height

Run
No

Time
(utc+8)

Fwd
Return

Position
Lat

Long

Heading
Gyro COG

Speed
Weather Element
(SOG)
Speed(STW)
Sea
Swel
Log
GPS
Log
GPS Temp Depth Current State Driction Height Period Height

Run
No

Time
(utc+8)

Fwd
Return

Position
Lat

Long

Heading
Gyro COG

Speed
Weather Element
(SOG)
Speed(STW)
Sea
Swel
Log
GPS
Log
GPS Temp Depth Current State Driction Height Period Height

Run
No

Time
(utc+8)

Fwd
Return

Position
Lat

Long

Heading
Gyro COG

Speed
Weather Element
(SOG)
Speed(STW)
Sea
Swel
Log
GPS
Log
GPS Temp Depth Current State Driction Height Period Height

Run
No

Time
(utc+8)

Fwd
Return

Position
Lat

Long

Heading
Gyro COG

Speed
Weather Element
(SOG)
Speed(STW)
Sea
Swel
Log
GPS
Log
GPS Temp Depth Current State Driction Height Period Height

Run
No

Time
(utc+8)

Fwd
Return

Position
Lat

Long

Heading
Gyro COG

Speed
Weather Element
(SOG)
Speed(STW)
Sea
Swel
Log
GPS
Log
GPS Temp Depth Current State Driction Height Period Height

Run
No

Time
(utc+8)

Fwd
Return

Position
Lat

Long

Heading
Gyro COG

Speed
Weather Element
(SOG)
Speed(STW)
Sea
Swel
Log
GPS
Log
GPS Temp Depth Current State Driction Height Period Height

Run
No

Time
(utc+8)

Fwd
Return

Position
Lat

Long

Heading
Gyro COG

Speed
Weather Element
(SOG)
Speed(STW)
Sea
Swel
Log
GPS
Log
GPS Temp Depth Current State Driction Height Period Height

Run
No

Time
(utc+8)

Fwd
Return

Position
Lat

Long

Heading
Gyro COG

Speed
Weather Element
(SOG)
Speed(STW)
Sea
Swel
Log
GPS
Log
GPS Temp Depth Current State Driction Height Period Height

Run
No

Time
(utc+8)

Fwd
Return

Position
Lat

Long

Heading
Gyro COG

Speed
Weather Element
(SOG)
Speed(STW)
Sea
Swel
Log
GPS
Log
GPS Temp Depth Current State Driction Height Period Height

Run
No

Time
(utc+8)

Fwd
Return

Position
Lat

Long

Heading
Gyro COG

Speed
Weather Element
(SOG)
Speed(STW)
Sea
Swel
Log
GPS
Log
GPS Temp Depth Current State Driction Height Period Height

Run
No

Time
(utc+8)

Fwd
Return

Position
Lat

Long

Heading
Gyro COG

Speed
Weather Element
(SOG)
Speed(STW)
Sea
Swel
Log
GPS
Log
GPS Temp Depth Current State Driction Height Period Height

Run
No

Time
(utc+8)

Fwd
Return

Position
Lat

Long

Heading
Gyro COG

Speed
Weather Element
(SOG)
Speed(STW)
Sea
Swel
Log
GPS
Log
GPS Temp Depth Current State Driction Height Period Height

Run
No

Time
(utc+8)

Fwd
Return

Position
Lat

Long

Heading
Gyro COG

Speed
Weather Element
(SOG)
Speed(STW)
Sea
Swel
Log
GPS
Log
GPS Temp Depth Current State Driction Height Period Height

ment
Swell

Wind
Wind(T)
Direction
Driction Period Speed
Speed Direction

Engine
RPM Load

ment
Swell

Wind
Wind(T)
Direction
Driction Period Speed
Speed Direction

Engine
RPM Load

ment
Swell

Wind
Wind(T)
Direction
Driction Period Speed
Speed Direction

Engine
RPM Load

ment
Swell

Wind
Wind(T)
Direction
Driction Period Speed
Speed Direction

Engine
RPM Load

ment
Swell

Wind
Wind(T)
Direction
Driction Period Speed
Speed Direction

Engine
RPM Load

ment
Swell

Wind
Wind(T)
Direction
Driction Period Speed
Speed Direction

Engine
RPM Load

ment
Swell

Wind
Wind(T)
Direction
Driction Period Speed
Speed Direction

Engine
RPM Load

ment
Swell

Wind
Wind(T)
Direction
Driction Period Speed
Speed Direction

Engine
RPM Load

ment
Swell

Wind
Wind(T)
Direction
Driction Period Speed
Speed Direction

Engine
RPM Load

ment
Swell

Wind
Wind(T)
Direction
Driction Period Speed
Speed Direction

Engine
RPM Load

ment
Swell

Wind
Wind(T)
Direction
Driction Period Speed
Speed Direction

Engine
RPM Load

ment
Swell

Wind
Wind(T)
Direction
Driction Period Speed
Speed Direction

Engine
RPM Load

ment
Swell

Wind
Wind(T)
Direction
Driction Period Speed
Speed Direction

Engine
RPM Load

ment
Swell

Wind
Wind(T)
Direction
Driction Period Speed
Speed Direction

Engine
RPM Load

ment
Swell

Wind
Wind(T)
Direction
Driction Period Speed
Speed Direction

Engine
RPM Load

You might also like