Federal Register / Vol. 72, No.

2 / Thursday, January 4, 2007 / Notices 341

Filed Date: 12/20/2006. a compliance filing if you have DEPARTMENT OF ENERGY


Accession Number: 20061221–0233. previously intervened in the same
Comment Date: 5 p.m. Eastern Time docket. Protests will be considered by Federal Energy Regulatory
on Wednesday, January 10, 2007. the Commission in determining the Commission
Docket Numbers: ER07–344–000; appropriate action to be taken, but will [Project No.: P–906–006]
EL06–67–001. not serve to make protestants parties to
Applicants: PJM Interconnection, the proceeding. Anyone filing a motion Virginia Electric and Power Company;
L.L.C. to intervene or protest must serve a copy Notice of Application Ready for
Description: PJM Interconnection, of that document on the Applicant. In Environmental Analysis and Soliciting
LLC submits revised tariff sheets reference to filings initiating a new Comments, Recommendations, Terms
containing revisions to its OATT. proceeding, interventions or protests and Conditions, and Prescriptions
Filed Date: 12/18/2006. submitted on or before the comment December 26, 2006.
Accession Number: 20061222–0153. deadline need not be served on persons
Comment Date: 5 p.m. Eastern Time Take notice that the following
other than the Applicant. hydroelectric application has been filed
on Monday, January 08, 2007.
The Commission encourages with the Commission and is available
Docket Numbers: ER07–345–000. for public inspection.
electronic submission of protests and
Applicants: Southwest Power Pool, a. Type of Application: New Major
interventions in lieu of paper, using the
Inc. License.
Description: Southwest Power Pool, FERC Online links at http://
www.ferc.gov. To facilitate electronic b. Project No.: P–906–006.
Inc submits proposed revisions to c. Date filed: June 12, 2006.
portions of its OATT relating to its real- service, persons with Internet access
d. Applicant: Virginia Electric and
time energy imbalance service market. who will eFile a document and/or be
Power Company, doing business as
Filed Date: 12/20/2006. listed as a contact for an intervenor
Dominion Virginia Power.
Accession Number: 20061222–0072. must create and validate an e. Name of Project: Cushaw
Comment Date: 5 p.m. Eastern Time eRegistration account using the Hydroelectric Project.
on Wednesday, January 10, 2007. eRegistration link. Select the eFiling f. Location: On the James River in near
Docket Numbers: ER07–346–000. link to log on and submit the Glasgow, Virginia, in Bedford and
Applicants: Southern California intervention or protests. Amherst Counties, Virginia. The project
Edison Company. Persons unable to file electronically occupies 4.1 acres of United States
Description: Southern California should submit an original and 14 copies Forest Service lands.
Edison Co submits a Letter Agreement of the intervention or protest to the g. Filed Pursuant to: Federal Power
with Stirling Energy Systems Solar One Federal Energy Regulatory Commission, Act 16 U.S.C. 791(a)–825(r).
Incorporated. 888 First St., NE., Washington, DC h. Applicant Contact: James
Filed Date: 12/21/2006. 20426. Thornton, Dominion Virginia Power,
Accession Number: 20061222–0071. 5000 Dominion Boulevard, 1 NE, Glen
Comment Date: 5 p.m. Eastern Time The filings in the above proceedings Allen, VA 23060 (804) 273–3257.
on Thursday, January 11, 2007. are accessible in the Commission’s i. FERC Contact: Kristen Murphy,
eLibrary system by clicking on the (202) 502–6236 or
Docket Numbers: ER07–347–000.
appropriate link in the above list. They kristen.murphy@ferc.gov.
Applicants: Southern California
are also available for review in the j. Deadline for filing comments,
Edison Company.
Commission’s Public Reference Room in recommendations, terms and
Description: Southern California
Washington, DC. There is an conditions, and prescriptions: February
Edison Co submits a Letter Agreement
eSubscription link on the Web site that 24, 2007; reply comments are due: April
with Walnut Creek Energy, LLC.
enables subscribers to receive e-mail 10, 2007.
Filed Date: 12/21/2006.
notification when a document is added All documents (original and eight
Accession Number: 20061222–0070.
to a subscribed dockets(s). For copies) should be filed with: Magalie R.
Comment Date: 5 p.m. Eastern Time
assistance with any FERC Online Salas, Secretary, Federal Energy
on Thursday, January 11, 2007.
service, please e-mail Regulatory Commission, 888 First
Docket Numbers: ER07–348–000. Street, NE., Washington, DC 20426.
Applicants: Cleco Power LLC. FERCOnlineSupport@ferc.gov. or call
The Commission’s Rules of Practice
Description: Cleco Power, LLC (866) 208–3676 (toll free). For TTY, call
require all intervenors filing documents
submits revisions to the three-party 9/1/ (202) 502–8659.
with the Commission to serve a copy of
51 System Interconnection Agreement Magalie R. Salas, that document on each person on the
with Entergy Gulf States, Inc and official service list for the project.
Secretary.
Entergy Louisiana, LLC. Further, if an intervenor files comments
Filed Date: 12/21/2006. [FR Doc. E6–22527 Filed 1–3–07; 8:45 am]
or documents with the Commission
Accession Number: 20061222–0146. BILLING CODE 6717–01–P
relating to the merits of an issue that
Comment Date: 5 p.m. Eastern Time may affect the responsibilities of a
on Thursday, January 11, 2007. particular resource agency, they must
Any person desiring to intervene or to also serve a copy of the document on
protest in any of the above proceedings that resource agency.
must file in accordance with Rules 211 Comments, recommendations, terms
mstockstill on PROD1PC61 with NOTICES

and 214 of the Commission’s Rules of and conditions, and prescriptions may
Practice and Procedure (18 CFR 385.211 be filed electronically via the Internet in
and § 385.214) on or before 5 p.m. lieu of paper. The Commission strongly
Eastern time on the specified comment encourages electronic filings. See 18
date. It is not necessary to separately CFR 385.2001(a)(1)(iii) and the
intervene again in a subdocket related to instructions on the Commission’s Web

VerDate Aug<31>2005 15:51 Jan 03, 2007 Jkt 211001 PO 00000 Frm 00016 Fmt 4703 Sfmt 4703 E:\FR\FM\04JAN1.SGM 04JAN1
342 Federal Register / Vol. 72, No. 2 / Thursday, January 4, 2007 / Notices

site (http://www.ferc.gov) under the ‘‘e- For assistance, contact FERC Online ADDRESSES: Direct all PRA comments to
Filing’’ link. Support. Allison E. Zaleski, Office of
k. This application has been accepted, n. A license applicant must file no Management and Budget, Room 10236
and is ready for environmental analysis later than 60 days following the date of NEOB, Washington, DC 20503, (202)
at this time. issuance of this notice: (1) A copy of the 395–6466, or via fax at 202–395–5167 or
l. Description of Project: The Cushaw water quality certification; (2) a copy of via Internet at
Project consists of the following: (1) A the request for certification, including Allison_E._Zaleski@.omb.eop.gov and to
1,550-foot-long and 27-foot-high proof of the date on which the certifying Judith-B.Herman@fcc.gov, Federal
reinforced concrete dam extending agency received the request; or (3) Communications Commission, Room 1–
diagonally across the James River; (2) a evidence of waiver of water quality B441, 445 12th Street, SW., DC 20554 or
138-acre reservoir with a surface certification. an e-mail to PRA@fcc.gov. If you would
elevation of 656 feet mean sea level; (3) like to obtain or view a copy of this
an integral powerhouse with the dam Magalie R. Salas,
information collection, you may do so
containing five generating units with a Secretary. by visiting the FCC PRA Web page at:
total installed capacity of 7,500 [FR Doc. E6–22525 Filed 1–3–07; 8:45 am] http://www.fcc.gov/omd/pra.
kilowatts; (4) a 2.3-kVcable connecting BILLING CODE 6717–01–P
FOR FURTHER INFORMATION CONTACT: For
the powerhouse to the Cushaw
additional information or copies of the
substation; and (5) appurtenant
information collection(s), contact Judith
facilities. The project is operated in a
FEDERAL COMMUNICATIONS B. Herman at 202–418–0214 or via the
run-of-river mode, and the average
COMMISSION Internet at Judith-B.Herman@fcc.gov.
annual electrical generation is
approximately 16,971,000 SUPPLEMENTARY INFORMATION:
Notice of Public Information OMB Control Number: 3060–0853.
kilowatthours.
Collection(s) Being Submitted for Title: Compliance with Children’s
m. A copy of the application is
Review to the Office of Management Internet Protection Act; Receipt of
available for review at the Commission
in the Public Reference Room or may be and Budget Service Confirmation; and Funding
viewed on the Commission’s Web site at December 18, 2006. Commitment (FRN) Change Request.
http://www.ferc.gov using the Form Nos.: FCC Forms 479, 486 and
SUMMARY: The Federal Communications 500.
‘‘eLibrary’’ link. Enter the docket
Commission, as part of its continuing Type of Review: Revision of a
number excluding the last three digits in
effort to reduce paperwork burden currently approved collection.
the docket number field to access the
invites the general public and other Respondents: Business or other for-
document. For assistance, contact FERC
Federal agencies to take this profit, not-for-profit institutions and
Online Support at
opportunity to comment on the state, local or tribal government.
FERCOnlineSupport@ferc.gov or toll-
following information collection(s), as Number of Respondents: 45,000
free at 1–866–208–3676, or for TTY,
(202) 502–8659. A copy is also available required by the Paperwork Reduction respondents; 45,000 responses.
for inspection and reproduction at the Act (PRA) of 1995, Public Law 104–13. Estimated Time Per Response: 1–1.5
address in item h above. An agency may not conduct or sponsor hours.
All filings must (1) bear in all capital a collection of information unless it Frequency of Response: On occasion
letters the title ‘‘COMMENTS’’, ‘‘REPLY displays a currently valid control and annual reporting requirements and
COMMENTS’’, number. No person shall be subject to third party disclosure requirement.
‘‘RECOMMENDATIONS,’’ ‘‘TERMS any penalty for failing to comply with Obligation to Respond: Required to
AND CONDITIONS,’’ or a collection of information subject to the obtain or retain benefits.
‘‘PRESCRIPTIONS;’’ (2) set forth in the Paperwork Reduction Act (PRA) that Total Annual Burden: 62,500 hours.
heading the name of the applicant and does not display a valid control number. Total Annual Cost: N/A.
the project number of the application to Comments are requested concerning (a) Privacy Act Impact Assessment: N/A.
which the filing responds; (3) furnish whether the proposed collection of Nature and Extent of Confidentiality:
the name, address, and telephone information is necessary for the proper The Commission is not requesting that
number of the person submitting the performance of the functions of the respondents submit confidential
filing; and (4) otherwise comply with Commission, including whether the information to the Commission. If the
the requirements of 18 CFR 385.2001 information shall have practical utility; Commission requests applicants to
through 385.2005. All comments, (b) the accuracy of the Commission’s submit information that the respondents
recommendations, terms and conditions burden estimate; (c) ways to enhance believe is confidential, respondents may
or prescriptions must set forth their the quality, utility, and clarity of the request confidential treatment of such
evidentiary basis and otherwise comply information collected; and (d) ways to information under section 47 CFR 0.459
with the requirements of 18 CFR 4.34(b). minimize the burden of the collection of of the Commission’s rules.
Agencies may obtain copies of the information on the respondents, Needs and Uses: The Commission
application directly from the applicant. including the use of automated will submit this information collection
Each filing must be accompanied by collection techniques or other forms of to OMB as a revision during this
proof of service on all persons listed on information technology. comment period to obtain the full three-
the service list prepared by the DATES: Written Paperwork Reduction year clearance from them. The
Commission in this proceeding, in Act (PRA) comments should be Commission has revised this collection
accordance with 18 CFR 4.34(b), and submitted on or before February 5, 2007. since it was last submitted to OMB. The
mstockstill on PROD1PC61 with NOTICES

385.2010. If you anticipate that you will be Commission has eliminated the FCC
You may also register online at submitting PRA comments, but find it Form 486–T which was a temporary
http://www.ferc.gov/docs-filing/ difficult to do so within the period of form to be used in Funding Year 2003.
esubscription.asp to be notified via e- time allowed by this notice, you should That date has sunset and the form has
mail of new filings and issuances advise the FCC contact listed below as been eliminated. The Commission has
related to this or other pending projects. soon as possible. also updated the Privacy Act and PRA

VerDate Aug<31>2005 15:51 Jan 03, 2007 Jkt 211001 PO 00000 Frm 00017 Fmt 4703 Sfmt 4703 E:\FR\FM\04JAN1.SGM 04JAN1

You might also like