78182 Federal Register / Vol. 71, No.

249 / Thursday, December 28, 2006 / Notices

DEPARTMENT OF ENERGY k. This application has been accepted All filings must: (1) Bear in all capital
for filing, but is not ready for letters the title ‘‘PROTEST’’ or
Federal Energy Regulatory environmental analysis at this time. ‘‘MOTION TO INTERVENE;’’ (2) set
Commission l. The proposed project would utilize forth in the heading the name of the
the existing U.S. Army Corps of applicant and the project number of the
[Project No. 12667–003] Engineers’ Captain Anthony Meldahl application to which the filing
Locks and Dam, and would consist of: responds; (3) furnish the name, address,
City of Hamilton, OH; Notice of (1) An intake approach channel; (2) an and telephone number of the person
Application Accepted for Filing and intake structure, (3) a 248-foot-long by protesting or intervening; and (4)
Soliciting Motions To Intervene and 210-foot-wide powerhouse containing otherwise comply with the requirements
Protests three generating units having a total of 18 CFR 385.2001 through 385.2005.
installed capacity of 105 megawatts, (4) Agencies may obtain copies of the
December 18, 2006. application directly from the applicant.
a tailrace channel; (5) a 5-mile-long,
Take notice that the following 138-kilovolt transmission line; and (6) A copy of any protest or motion to
hydroelectric application has been filed appurtenant facilities. The City of intervene must be served upon each
with the Commission and is available Hamilton (Hamilton) is a municipal representative of the applicant specified
for public inspection. entity that owns and operates an in the particular application.
a. Type of Application: Original Major electrical system. The project would o. Procedural schedule: The
License. have an estimated annual generation of application will be processed according
b. Project No.: 12667–003. 489 gigawatt-hours, which would be to the following revised Hydro
c. Date filed: October 6, 2006. used to serve the needs of the customers Licensing Schedule. Revisions to the
d. Applicant: City of Hamilton, Ohio. of Hamilton’s electric system. schedule will be made if the
e. Name of Project: Meldahl m. A copy of the application is Commission determines it necessary to
Hydroelectric Project. available for review at the Commission do so:
f. Location: On the Ohio River, near in the Public Reference Room or may be
viewed on the Commission’s website at Ten-
the City of Augusta, Bracken County, Action tative
Kentucky. The existing dam is owned http://www.ferc.gov using the date
and operated by the U.S. Army Corps of ‘‘eLibrary’’ link. Enter the docket
Engineers (Corps). The project would number, excluding the last three digits Scoping Document for comments .. March
occupy approximately 81 acres of in the docket number field to access the 2007
United States lands administered by the document. For assistance, contact FERC Notice of application is ready for June
Online Support at environmental analysis. 2007
Corps.
Notice of the availability of the draft Decem-
g. Filed Pursuant to: Federal Power FERCOnlineSupport@ferc.gov or toll- EA. ber
Act 16 U.S.C. 791(a)—825(r). free at 1–866–208–3676, or for TTY, 2007
h. Applicant Contact: Mr. Michael (202) 502–8659. A copy is also available Notice of the availability of the final June
Perry, Director of Electric, City of for inspection and reproduction at the EA. 2008
Hamilton, OH, 345 High Street, address in item h above.
Hamilton, OH 45011, (513) 785–7229. You may also register online at http:// Magalie R. Salas,
i. FERC Contact: Peter Leitzke at (202) www.ferc.gov/docs-filing/ Secretary.
502–6059; or e-mail at esubscription.asp to be notified via
[FR Doc. E6–22206 Filed 12–27–06; 8:45 am]
peter.leitzke@ferc.gov. email of new filings and issuances
BILLING CODE 6717–01–P
j. Deadline for filing motions to related to this or other pending projects.
intervene and protests: 60 days from the For assistance, contact FERC Online
issuance date of this notice. Support. n. Competing development DEPARTMENT OF ENERGY
All documents (original and eight applications, notices of intent to file
copies) should be filed with: Magalie R. such an application, and applications Federal Energy Regulatory
Salas, Secretary, Federal Energy for preliminary permits will not be Commission
Regulatory Commission, 888 First accepted in response to this notice.
Street, NE., Washington, DC 20426. Anyone may submit a protest or a Notice of Application Accepted for
The Commission’s Rules of Practice motion to intervene in accordance with Filing and Soliciting Motions To
and Procedures require all intervenors the requirements of Rules of Practice Intervene, Protests, and Comments
filing documents with the Commission and Procedure, 18 CFR 385.210,
December 19, 2006.
to serve a copy of that document on 385.211, and 385.214. In determining
Take notice that the following
each person on the official service list the appropriate action to take, the
hydroelectric application has been filed
for the project. Further, if an intervenor Commission will consider all protests
with the Commission and is available
files comments or documents with the filed, but only those who file a motion
for public inspection:
Commission relating to the merits of an to intervene in accordance with the a. Type of Application: Preliminary
issue that may affect the responsibilities Commission’s Rules may become a Permit.
of a particular resource agency, they party to the proceeding. Any protests or b. Project No.: 12748–000.
must also serve a copy of the document motions to intervene must be received c. Date filed: November 1, 2006.
on that resource agency. on or before the specified deadline date d. Applicant: The City of Corpus
Motions to intervene and protests may for the particular application. Christi (City).
be filed electronically via the Internet in When the application is ready for e. Name of Project: City of Corpus
sroberts on PROD1PC70 with NOTICES

lieu of paper. The Commission strongly environmental analysis, the Christi Hydroelectric Project.
encourages electronic filing. See 18 CFR Commission will issue a public notice f. Location: The project would be
385.2001(a)(1)(iii) and the instructions requesting comments, located at the City’s existing Wesley E.
on the Commission’s Web site (http:// recommendations, terms and Seale Dam, on the Nueces River in
www.ferc.gov) under the ‘‘e-Filing’’ link. conditions, or prescriptions. Nueces County, Texas.

VerDate Aug<31>2005 20:03 Dec 27, 2006 Jkt 211001 PO 00000 Frm 00055 Fmt 4703 Sfmt 4703 E:\FR\FM\28DEN1.SGM 28DEN1