DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY located in Oklahoma City, Oklahoma,
for calendar years 2007 and 2008. Federal Energy Regulatory Federal Energy Regulatory Any person desiring to intervene or to Commission Commission protest this filing must file in [Docket No. ER06–1094–002] [Docket No. RM05–30–000] accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Midwest Independent Transmission Rules Concerning Certification of Procedure (18 CFR 385.211, 385.214). System Operator, Inc.; Notice of Electronic Reliability Organization; and Protests will be considered by the Supplemental Request for Waiver Procedures for the Establishment, Commission in determining the Approval and Enforcement of Electric appropriate action to be taken, but will November 22, 2006. not serve to make protestants parties to Reliability Standards; Notice of Take notice that on July 24, 2006, the Availability of Filing the proceeding. Any person wishing to Midwest Independent Transmission become a party must file a notice of System Operator, Inc. (Midwest ISO) November 22, 2006. intervention or motion to intervene, as filed a request to amend its June 1, 2006 Take notice that, on November 21, appropriate. Such notices, motions, or request for waiver of standards for 2006, the Commission received the protests must be filed on or before the business practices. In addition, on 2006/2007 Winter Assessment prepared comment date. Anyone filing a motion November 3, 2006, Midwest ISO, filed by the North American Electric to intervene or protest must serve a copy an Affidavit of James F. Pewarski in Reliability Council (NERC). of that document on the Applicant and further support of the waiver request. Section 39.11 of the Commission’s all the parties in this proceeding. Any person desiring to intervene or to regulations provides that the Electric The Commission encourages protest this filing must file in Reliability Organization (ERO) shall electronic submission of protests and accordance with Rules 211 and 214 of conduct assessments of, among other interventions in lieu of paper using the the Commission’s Rules of Practice and things, the adequacy of the Bulk-Power ‘‘eFiling’’ link at http://www.ferc.gov. Procedure (18 CFR 385.211, 385.214). System in North America and report its Persons unable to file electronically Protests will be considered by the findings to the Commission, the should submit an original and 14 copies Commission in determining the Secretary of Energy, each Regional of the protest or intervention to the appropriate action to be taken, but will Entity, and each Regional Advisory Federal Energy Regulatory Commission, not serve to make protestants parties to Body annually or more frequently if so 888 First Street, NE., Washington, DC the proceeding. Any person wishing to ordered by the Commission. According 20426. become a party must file a notice of to NERC, the 2006/2007 Winter This filing is accessible on-line at intervention or motion to intervene, as Assessment is the second assessment http://www.ferc.gov, using the appropriate. Such notices, motions, or filed by NERC in its capacity as the ‘‘eLibrary’’ link and is available for protests must be filed on or before the ERO. review in the Commission’s Public comment date. Anyone filing a motion This assessment is filed under Docket Reference Room in Washington, DC. to intervene or protest must serve a copy No. RM05–30–000 and is accessible on- There is an ‘‘eSubscription’’ link on the of that document on the Applicant and line at http://www.ferc.gov, using the Web site that enables subscribers to all the parties in this proceeding. ‘‘eLibrary’’ link and is available for receive e-mail notification when a The Commission encourages review in the Commission’s Public document is added to a subscribed electronic submission of protests and Reference Room. For assistance with docket(s). For assistance with any FERC interventions in lieu of paper using the any FERC Online service, please e-mail Online service, please e-mail ‘‘eFiling’’ link at http://www.ferc.gov. FERCOnlineSupport@ferc.gov, or call FERCOnlineSupport@ferc.gov, or call Persons unable to file electronically (866) 208–3676 (toll free). For TTY, call (866) 208–3676 (toll free). For TTY, call should submit an original and 14 copies (202) 502–8659. (202) 502–8659. of the protest or intervention to the Magalie R. Salas, Comment Date: 5 p.m. Eastern Time Federal Energy Regulatory Commission, Secretary. on December 18, 2006. 888 First Street, NE., Washington, DC 20426. [FR Doc. E6–20257 Filed 11–29–06; 8:45 am] Magalie R. Salas, This filing is accessible on-line at BILLING CODE 6717–01–P Secretary. http://www.ferc.gov, using the [FR Doc. E6–20261 Filed 11–29–06; 8:45 am] ‘‘eLibrary’’ link and is available for BILLING CODE 6717–01–P review in the Commission’s Public DEPARTMENT OF ENERGY Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Federal Energy Regulatory DEPARTMENT OF ENERGY Web site that enables subscribers to Commission receive e-mail notification when a [Docket No. EL07–17–000, QF86–36–003] Federal Energy Regulatory document is added to a subscribed Commission docket(s). For assistance with any FERC PowerSmith Cogeneration Project Online service, please e-mail Limited Partnership; Notice of Filing Combined Notice of Filings # 1 FERCOnlineSupport@ferc.gov, or call November 22, 2006. (866) 208–3676 (toll free). For TTY, call November 22, 2006. Take notice that on November 16, Take notice that the Commission (202) 502–8659. Comment Date: 5 p.m. Eastern Time 2006, PowerSmith Cogeneration Project received the following electric rate on December 4, 2006. Limited Partnership filed a request for a filings. pwalker on PRODPC60 with NOTICES
limited waiver of the operating Docket Numbers: ER04–441–014;
Magalie R. Salas, standards, pursuant to 18 CFR ER04–445–019; ER04–443–015; ER04– Secretary. 292.205(a)(2), and efficiency standards, 435–022. [FR Doc. E6–20259 Filed 11–29–06; 8:45 am] pursuant to 18 CFR 292.205(a)(1), for a Applicants: California Independent BILLING CODE 6717–01–P topping-cycle cogeneration facility System Operator Corporation.
VerDate Aug<31>2005 16:44 Nov 29, 2006 Jkt 211001 PO 00000 Frm 00009 Fmt 4703 Sfmt 4703 E:\FR\FM\30NON1.SGM 30NON1