You are on page 1of 3

Federal Register / Vol. 71, No.

227 / Monday, November 27, 2006 / Notices 68569

ACTION: Notice. qualified for commission in the U.S. of the Federal Coordination Summit
Navy or U.S. Navy Reserve. held in July 2006 and subsequent inter-
SUMMARY: The Navy Recruiting Affected Public: Individuals or agency coordination efforts.
Command announces a proposed households. The subjects of the public hearing to
extension of a public information Annual Burden Hours: 23,400. be held during the 1:30 p.m. business
collection and seeks public comment on Number of Respondents: 11,700. meeting include the dockets listed
the provisions thereof. Comments are Responses per Respondent: 1. below:
invited on: (a) Whether the proposed Average Burden per Response: 2 1. Matamoras Municipal Authority D–
collection of information is necessary hours. 81–76 CP–6. An application to expand
for the proper performance of the Frequency: On occasion. the existing service area to include
functions of the agency, including SUPPLEMENTARY INFORMATION:
property within Westfall Township
whether the information shall have north and south of Mountain Avenue.
practical utility; (b) the accuracy of the Summary of Collection The applicant requests to retain the
agency’s estimate of the burden of the All persons interested in entering the existing allocation of 11.7 million
proposed information collection; (c) U.S. Navy or U.S. Navy Reserve, in a gallons per thirty days (mg/30 days)
ways to enhance the quality, utility, and commissioned status must provide from existing Wells Nos. 3, 5, 7, 8 and
clarity of the information to be various personal data in order for a 8A. The project is located in Matamoras
collected; and (d) ways to minimize the Selection Board to determine their Borough and Westfall Township, Pike
burden of the information collection on qualifications for naval service and for County, Pennsylvania within the
respondents, including through the use specific fields of endeavor which the drainage area to a section of the non-
of automated collection techniques or applicant intends to pursue. This tidal Delaware River known as the
other forms of information technology. Middle Delaware, which is classified as
information is used to recruit and select
Special Protection Waters.
DATES: Consideration will be given to all applicants who are qualified for
2. Joseph Jackewicz, Sr. D–91–53–2.
comments received by January 26, 2007. commission in the U.S. Navy or U.S. An application for the renewal of a
ADDRESSES: You may submit comments, Navy Reserve. ground and surface water withdrawal
identified by docket number and title, Dated: November 17, 2006. project to continue withdrawal of 219.8
by any of the following methods: Patricia L. Toppings, mg/30 days to supply the applicant’s
• Federal eRulemaking Portal: http:// Alternate OSD Federal Register, Liaison agricultural irrigation system from
www.regulations.gov. Follow the Officer, Department of Defense. replacement Well No. Townsend 3,
instructions for submitting comments. [FR Doc. 06–9401 Filed 11–24–06; 8:45 am] eight existing wells and one existing
• Mail: Federal Docket Management BILLING CODE 5001–06–M surface water intake. The project is
System Office, 1160 Defense Pentagon, located in the Tidbury Creek, Cypress
Washington, DC 20301–1160. Branch and Double Run watersheds in
• Instructions: All submissions DELAWARE RIVER BASIN the Town of Magnolia, Kent County,
received must include the agency name, COMMISSION Delaware.
docket number and title for this Federal 3. Magnesium Elektron, Inc. D–94–73–
Register document. The general policy Notice of Commission Meeting and 2. An application for approval of a
for comments and other submissions Public Hearing ground water withdrawal project to
from members of the public is to make supply up to 9.8 mg/30 days of water to
these submissions available for public Notice is hereby given that the the applicant’s industrial facility and
viewing on the Internet at http:// Delaware River Basin Commission will ground water remediation project from
www.regulations.gov as they are hold an informal conference followed new Well No. 9 and to retain the
received without change, including any by a public hearing on Tuesday, existing withdrawal from all wells of 9.8
personal identifiers or contact December 12, 2006. The hearing will be mg/30 days. The project is located in the
information. part of the Commission’s regular Lockatong Formation in the
business meeting. Both the conference Wickechoeke Creek Watershed in
FOR FURTHER INFORMATION CONTACT: To session and business meeting are open Kingwood Township, Hunterdon
request additional information or to to the public and will be held at the County, New Jersey and within the
obtain a copy of the proposal and Commission’s office building, located at drainage area to the section of the non-
associated collection instruments, write 25 State Police Drive in West Trenton, tidal Delaware River known as the
to Commander, Navy Recruiting New Jersey. Lower Delaware, which is classified as
Command (N35B), 5722 Integrity Drive, The conference among the Special Protection Waters.
Millington, TN 38054–5057, or contact commissioners and staff will begin at 4. Horsehead Corporation D–67–196–
Mr. Ken Saxion at (901) 874–9045. 10:15 a.m. Topics of discussion include 2. An application for a change of
Title and OMB Number: Application a report on progress to date of the Flood ownership and a docket modification
for Commission in the U.S. Navy/U.S. Mitigation Task Force, the planned for the discharge of non-contact cooling
Navy Reserve; OMB Control Number release of task force recommendations, water, boiler blow-down, and effluent
0703–0029. and the process by which public from metal recovery zones (MRZs) for
Needs and Uses: All persons comment will be solicited on these the Palmerton East Plant. The
interested in entering the U.S. Navy or recommendations; a report on the status discharges consists of approximately
U.S. Navy Reserve, in a commissioned of development of a long-term multi- 0.15 million gallons per day (mgd) of
status must provide various personal objective management plan for the New non-contact cooling water from Outfall
data in order for a Selection Board to York City Delaware Basin reservoirs; a 004, 0.31 mgd of non-contact cooling
sroberts on PROD1PC70 with NOTICES

determine their qualifications for naval presentation on the draft State of the water and boiler blow-down from
service and for specific fields of Basin Report; a status report on the Outfall 005, a 0.128 mgd MRZ discharge
endeavor which the applicant intends to process for establishing a Total from Outfall 015, a 0.036 mgd MRZ
pursue. This information is used to Maximum Daily Load (TMDL) for PCBs discharge from Outfall 019 and a 0.040
recruit and select applicants who are for the Delaware Bay; and a discussion mgd MRZ related discharge from Outfall

VerDate Aug<31>2005 18:21 Nov 24, 2006 Jkt 211001 PO 00000 Frm 00041 Fmt 4703 Sfmt 4703 E:\FR\FM\27NON1.SGM 27NON1
68570 Federal Register / Vol. 71, No. 227 / Monday, November 27, 2006 / Notices

022. The discharges from Outfall Nos. Recreational’’ in the Comprehensive withdrawal from 32.12 mg/30 days to
004, 005, 015, 019 and 022 are to the Plan. The project is located south of 43.113 mg/30 days to supply the
Aquashicola Creek, which is a tributary State Route 422 at the former Occidental applicant’s public water supply
to the Lehigh River. The discharges are Chemical Corporation facility in Lower distribution system from existing Wells
located in the drainage area of the Pottsgrove Township, Montgomery Nos. RH–1, RH–2, RH–3, TUHA–1,
Lower Delaware Special Protection County, Pennsylvania. Occidental TUHA–2, TUHA–3, TUHA–4 and
Water Area. The facility is located in Chemical Corporation remains the Kemmerer Spring in the Brunswick and
Palmerton Borough, Carbon County, owner of the property, but its affiliate, Leithsville Formations. The increased
Pennsylvania. Glenn Springs Holdings, Inc. is the allocation is requested in order to meet
5. Cabot Corporation D–70–72–3. An operator of the ground and storm water projected increases in service area
application for approval to modify treatment facility. Currently, up to 0.5 demand. The project is located in the
planned improvements to the mgd of flow containing volatile organic Perkiomen and Macoby Creek
applicant’s industrial wastewater chemicals is treated by carbon Watersheds in Upper Hanover
treatment plant (IWTP) upgrade project, absorption and air stripping before it is Township, Montgomery County,
approved by the Commission on discharged to the Pottstown City Sewage Pennsylvania and within the
October 24, 2004, and to implement Treatment Plant. Approval is requested Southeastern Pennsylvania Ground
manufacturing operation improvements to discharge the treated effluent directly Water Protected Area.
necessary to meet water quality to the Schuylkill River through storm 11. Middle Smithfield Township
objectives in Swamp Creek. The water Outfall 005, as a cost-savings Municipal Authority D–73–209 CP–1.
applicant produces inorganic chemicals measure. No increase in capacity is An application for the expansion and
and primary nonferrous metals and proposed, nor are any new production reconstruction of the existing Winona
alloys at its Boyertown Facility, which or recovery wells necessary. The Lakes WWTP from 0.022 mgd to 0.050
is located off Swamp Creek Road and industrial waste treatment plant and mgd. The project includes the
straddles the borders of Douglass surface water supply intake described in construction of a new 50,000 gallons per
Township, Montgomery County and DRBC Docket No. D–76–17 will remain day (gpd) phased isolation ditch
Colebrookdale Township, Berks County, inactive. The production (water supply) wastewater treatment facility to replace
both in Pennsylvania. Based upon wells that were referenced in that the existing 22,000 gpd extended
revised production rate projections, the docket will remain in use as recovery aeration wastewater treatment facility.
applicant has determined that wells. The combined allocation for The expansion of the plant is to
modification of the existing IWTP Recovery Wells Nos. 1, 1R, 4, 5, 6, 8, 8A, accommodate expected wastewater
would be more cost effective than 9, 9A, 10A, A, B and C will be a total flows from Sections 12, 13 and 14 of the
constructing new facilities. In addition, of 15 mg/30 days. The wells are located Winona Lakes community. The WWTP
the average design flow is proposed to in the Brunswick Formation within the will discharge to the Bushkill Creek, a
be reduced to 0.15 mgd from the Southeastern Pennsylvania Ground tributary to the Middle Delaware River
previously approved 0.222 mgd. The Water Protected Area. Special Protection Waters. The facility
plant effluent, along with storm water, 8. Borough of Alburtis D–91–42 CP–3. is located in Middle Smithfield
cooling water and water supply An application to replace the Township, Monroe County,
treatment wastewater, will continue to withdrawal of water from Well No. 3 in Pennsylvania.
be discharged via the existing outfall to the applicant’s water supply system 12. Artesian Water Company D–2003–
Swamp Creek in the Schuylkill River with a withdrawal from Well No. 3A, 22 CP–3. An application for approval of
Watershed. The project is located within because Well No. 3 has become an a ground water withdrawal project to
the Southeastern Pennsylvania Ground unreliable source of supply. The supply up to 8.7 mg/30 days of water to
Water Protected Area, within the applicant requests that the withdrawal the applicant’s public water supply
drainage area of a portion of the from replacement Well No. 3A be distribution system from new Well
Schuylkill River that is conditionally limited to 7.5 mg/30 days of water, and Thomas Cove 2 and to retain the
designated as ‘‘Modified Recreational’’ that the total withdrawal from all wells existing withdrawal from all wells in 9
in DRBC’s Comprehensive Plan. be increased to 11.487 mg/30 days from wellfields in the applicant’s Southern
6. Village of Deposit D–74–57 CP–2. the previous allocation of 6.5 mg/30 Distribution System of 150 mg/30 days.
An application for approval of a days in order to meet projected The project is located in the Mt. Laurel
wastewater treatment plant (WWTP) increases in service area demand. The Formation in the Appoquinimink River
expansion project to provide secondary project is located in the Leithsville and Watershed in New Castle County,
treatment to up to 0.7 mgd, a proposed Hornblende Gneiss formations in the Delaware.
increase of 0.1 mgd from the existing Swabia Creek Watershed in Alburtis 13. Bear Creek Management
capacity. The WWTP discharges effluent Borough, Lehigh County, Pennsylvania. Company, LLC D–2005–16–1. An
to the West Branch Delaware River in 9. New Hanover Township Authority application for approval to construct a
DRBC Water Quality Zone W1. The D–99–40 CP–2. An application for new WWTP to serve the applicant’s
project is located in the Upper Delaware approval of the expansion of the New Bear Creek Ski Area and to operate an
Special Protection Waters drainage area Hanover Township Authority’s WWTP on-site iron abatement system. The
in the Village of Deposit, Broome and from 0.825 mgd to 1.925 mgd. The 0.045 mgd treatment plant will
Delaware Counties, New York. The WWTP will continue to discharge to discharge to sixteen holding tanks used
WWTP will continue to serve the Swamp Creek, a tributary of the for post treatment equalization prior to
Village of Deposit and may serve the Perkiomen Creek, which is tributary to being pumped to a drip field at a
Town of Deposit, Delaware County, the Schuylkill River. The facility is maximum daily rate not to exceed 0.035
New York in the future. located in New Hanover Township, mgd. The facility is located in the
sroberts on PROD1PC70 with NOTICES

7. Glenn Springs Holdings, Inc. D–76– Montgomery County, Pennsylvania. Swabia Creek Watershed, a tributary to
17–2. An application to discharge 10. The Upper Hanover Authority D– the Little Lehigh River in Long Swamp
treated storm and ground water into the 2002–10 CP–2. An application for the Township, Berks County, Pennsylvania.
Schuylkill River in an area that is renewal of a ground water withdrawal The on-site iron abatement system will
conditionally designated as ‘‘Modified project to increase the total system include water quality monitoring,

VerDate Aug<31>2005 16:58 Nov 24, 2006 Jkt 211001 PO 00000 Frm 00042 Fmt 4703 Sfmt 4703 E:\FR\FM\27NON1.SGM 27NON1
Federal Register / Vol. 71, No. 227 / Monday, November 27, 2006 / Notices 68571

sediment sampling, removal of iron In addition to the public hearing on Eligible Applicants: A State
from the water column and removal of the dockets listed above, the educational agency (SEA) of one of the
iron precipitate from the wetland Commission’s 1:30 p.m. business 50 States, the District of Columbia, or
substrate. The project is located in the meeting will include: A public hearing the Commonwealth of Puerto Rico or an
drainage area to a section of the non- and consideration of a resolution to re- outlying area (United States Virgin
tidal Delaware River known as the authorize the Commission’s Monitoring Islands, Guam, American Samoa, and
Lower Delaware, which is classified as Advisory Committee and a resolution to the Commonwealth of the Northern
Special Protection Waters. adopt the 2007–2012 Water Resources Mariana Islands). Current State Program
14. Delaware River Joint Toll Bridge Program. Improvement Grant grantees with multi-
Commission D–2006–7 CP–1. An The meeting will also include: year awards who wish to apply for a
application for approval of a bridge adoption of the Minutes of the grant under the State Personnel
modification project, located in a Commission’s September 27, 2006 Development Grants Program may do
recreational area which is included in business meeting; announcements of so, subject to section 651(e) of the
the DRBC Comprehensive Plan. The upcoming advisory committee meetings Individuals with Disabilities Education
U.S. Route 1 Toll Bridge connects the and other events; a report by the Act (IDEA), which prohibits a State
Borough of Morrisville, Bucks County, Executive Director; a report by the requesting a continuation award under
Pennsylvania with the City of Trenton, Commission’s General Counsel; and an the State Improvement Grant Program,
Mercer County, New Jersey and is opportunity for public dialogue. as in effect prior to December 3, 2004,
located at the base of DRBC Water Draft dockets scheduled for public from receiving any other award under
Quality Zone 1E. The bridge will be hearing on December 12, 2006 will be this program authority for that fiscal
widened at a point where it passes over posted on the Commission’s Web site, year.
the Delaware Canal, formerly known as http://www.drbc.net, where they can be Estimated Available Funds:
Roosevelt State Park. accessed through the Notice of $28,600,000.
15. Ingersoll-Rand Company D–2006– Commission Meeting and Public Estimated Range of Awards: In the
14–1. An application for the approval of Hearing. Additional documents relating case of the 50 States, the District of
an existing groundwater remediation to the dockets and other items may be Columbia, and the Commonwealth of
discharge project located at the examined at the Commission’s offices. Puerto Rico, award amounts will be not
Ingersoll-Rand facility in Phillipsburg, Please contact William Muszynski at less than $500,000, nor more than
New Jersey. The existing remediation 609–883–9500, extension 221, with any $4,000,000. In the case of an outlying
system discharges approximately 0.090 docket-related questions. area, awards will be not less than
mgd via Outfall 002 to Lopatcong Creek, Individuals in need of an $80,000.
which converges with the Delaware accommodation as provided for in the
River at River Mile 182, within a reach Americans with Disabilities Act who Note: Consistent with 34 CFR § 75.104(b) of
wish to attend the informational the Education Department General
classified as ‘‘Significant Resource Administrative Regulations (EDGAR), we
Waters.’’ The facility is located in the meeting, conference session or hearings
will reject, without consideration or
Town of Phillipsburg and Lopatcong should contact the commission evaluation, any application that proposes a
Township, Warren County, New Jersey. secretary directly at 609–883–9500 ext. project funding level for any fiscal year that
16. Spring Ford Country Club D– 203 or through the Telecommunications exceeds the stated maximum award amount
2006–16–1. An application for approval Relay Services (TRS) at 711, to discuss of $4,000,000 for that fiscal year.
of a ground and surface water how the Commission can accommodate
withdrawal project to supply up to 11.2 your needs. We will set the amount of each grant
mg/30 days of water to the applicant’s after considering—
Dated: November 20, 2006.
golf course irrigation system from (1) The amount of funds available for
Pamela M. Bush,
existing Well No. 1 and up to 21.6 mg/ making grants;
Commission Secretary.
30 days from a pond on an unnamed (2) The relative population of the
[FR Doc. E6–19997 Filed 11–24–06; 8:45 am] State or outlying area;
tributary to Mingo Creek and to limit the
BILLING CODE 6360–01–P
existing withdrawal from all sources to (3) The types of activities proposed by
21.6 mg/30 days. The project is located the State or outlying area;
in the Brunswick Formation in the (4) The alignment of proposed
Mingo Creek Watershed in Limerick DEPARTMENT OF EDUCATION activities with section 612(a)(14) of
Township, Montgomery County, Office of Special Education and IDEA;
Pennsylvania and is located in the Rehabilitative Services; Overview (5) The alignment of proposed
Southeastern Pennsylvania Ground Information activities with State plans and
Water Protected Area. applications submitted under sections
17. Pocono Township D–2006–17 CP– State Personnel Development Grants 1111 and 2112, respectively, of the
1. An application for the construction of Program Elementary and Secondary Education
a new 2.0 mgd WWTP to accommodate Notice inviting applications for new Act of 1965, as amended (ESEA); and
flows from existing WWTPs and awards for fiscal year (FY) 2006 (to be (6) The use, as appropriate, of
anticipated regional growth. The project awarded in FY 2007) scientifically-based research and
includes the construction of a collection instruction.
system for the Route 611 Corridor. The Catalog of Federal Domestic Assistance Estimated Average Size of Awards:
WWTP will discharge via an (CFDA) Number: 84.323A. $1,020,000, excluding outlying areas.
approximately 6-mile forcemain to the Dates: Applications Available:
sroberts on PROD1PC70 with NOTICES

Estimated Number of Awards: 28.


Brodhead Creek, a tributary to the November 27, 2006.
Middle Delaware River Special Note: The Department is not bound by any
Deadline for Transmittal of
estimates in this notice.
Protection Waters. The facility will be Applications: May 29, 2007.
located in Pocono Township, Monroe Deadline for Intergovernmental Project Period: Not less than one year
County, Pennsylvania. Review: May 29, 2007. and not more than five years.

VerDate Aug<31>2005 16:58 Nov 24, 2006 Jkt 211001 PO 00000 Frm 00043 Fmt 4703 Sfmt 4703 E:\FR\FM\27NON1.SGM 27NON1

You might also like