Professional Documents
Culture Documents
5 APR 1991
HQ AFCESA/EN
139 Barnes Drive, Suite 1
Tyndall AFB FL 322403-5319
SUBJECT:
Effective Date.
Immediately.
REFERENCED PUBLICATIONS.
Distribution Is Unlimited.
DISTRIBUTION LIST
AIR FORCE
HQ AFMC/CEC
(3)
4225 Logistics Ave
Wright-Patterson AFB OH 45433-5739
HQ AIA/LEE
102 Hall Boulevard, Suite 241
San Antonio TX 78243-7030
(1)
HQ AFRES/CEM
155 2nd Street
Robins AFB GA 31098-l635
(2)
HQ AFCC/CEM
203 W Losey Street, Rm 1020
Scott AFB IL 62225-5219
(2)
HQ AETC/CEM
Bldg 661, 73 Main Circle
Randolph AFB TX 78150-4549
(3)
HQ AU/DEE
400 Cannot Street
Maxwell AFB AL: 36112-6523
(1)
HQ PACAF/CEM
25 E Street, Suite D-302
Hickam AFB HI 96853-5412
(3)
HQ USAFE/RSIO
Unit 3050, Box 10
APO AE 09094-5010
(3)
HQ USAFA/CEE
8120 Edgerton Dr, Suite 40
USAF Academy CO 80840-2400
(1)
CETSO/ESOF
(1)
11817 Canon Boulevard, Suite 500
Crestar Bank Building
Newport News VA 23606-2558
11 SPT GP/CEM
1 McChord Street, Suite 208
Bolling AFB DC 20332-5109
(1)
HQ AMC/CES
507 A Street
Scott AFB IL 62225-5001
AFIT/DEE
(1)
2950 P Street
Wright-Patterson AFB OH, 45433-7765
(3)
HQ AFSPC/CEO
(3)
150 Vandenberg Street, Suite 1105
Peterson AFB CO 80914-4150
HQ ACC/CEM
129 Andrews Street, Suite 346
Langley AFB VA 23665-2769
(3)
SSC/SBEE
(1)
201 East Moore Drive (Gunter Annex)
Maxwell AFB FL 36114-3005
H Q A F S O C / D E
301 Cody Avenue, Bldg T-206
Hurlburt Field FL 32544-5273
(1)
NGB/CEP/CEO
2500 Army Pentagon (20369)
Washington DC 20331
HQ USAF/CEC
1260 Air Force Pentagon
Washington DC 20330-l260
(1)
(1)
Atch 1
(1 of 3)
(1)
HQ A F S V A / S V Q F
Randolph AFB TX 78150-6001
(1)
HQAFSA/SEGS
AFCEE/CM/DG
8106 Chennault Road
Brooks AFB TX 78235-5318
(2
HQ AF Safety Agency/SEGS
9700 G Avenue SE, Suite 240
Kirtland AFB TX 87117-5664
(1)
7 CG/XPGF
1600 Air Force Pentagon
Washington DC 20330-l600
(1)
HQ A F O M S / S G S
Brooks AFB TX 78235-5000
(1)
HQ AFOTEC/DE
8500 Gibson Boulevard SE
Kirtland AFB NM 87117-5558
(1)
HQ AF Inspection Agency/lGSE
Norton AFB CA 92409-7001
(1)
(1)
ARMY
Chief of Engineers
Department of the Army
Attn: CEMP-EA
20 Massachusetts Avenue
Washington DC 20314-l000
(2)
NAVY
LANTNAVFACENGCOM
Code 04C
1510 Gilbert St
Norfolk VA 2351l-2699
(1)
NORTHNAVENGCOM
Code 406
10 Industrial Hwy
Mail Stop 82
Lester PA 19113-2090
PACNAVFACENGCOM
Code 406
Bldg 258 Makalapa
Pearl Harbor HI 9686O-7300
(1)
SOUTHNAVFACENGCOM
(1)
Code 406 DPD
1255 Eagle D r
North Charleston SC 29419-9010
WESTNAVFACENGCOM
Code 406
900 Commodore Dr
San Bruno CA 94066-2402
(1)
SOUTHWESTNAVFACENGCOM
Code 406
1220 Pacific Hwy Bldg 130
San Diego CA 92132-5188
Atch 1
(2 of 3)
(1)
(1)
ENGFLDACT NW
Code 04B
3505 NW Anderson Hill Rd
Silverdale WA 98383-2366
(1)
ENGFLDACT MED
Code N4
PSC 810 Box 51
FPO AE 09619-9951
ENGFLDACT MW
Code 420
Bldg 1 A
Great Lakes IL 60088-5600
DEPARTMENT OF DEFENSE
Defense Technical Information
Center
ATTN: DTIC-FDA
Alexandria VA 22034-6145
(1)
(1)
(1)
Atch 1
(3 of 3)
4.
DEFINITIONS.
5.
SPECIFIC REQUIREMENTS.
See Attachment 3.
Attachments:
1. Distribution List
2. ETL Index
3. Technical Details
83-3
83-4
83-7
83-8
83-9
84-2
84-7
84-10
86-2
86-4
86-5
86-8
86-9
86-10
86-14
86-l 6
87-l
87-2
87-4
87-5
87-9
88-2
88-3
88-4
88-6
88-9
Title
Energy Efficient Equipment
Design of Control Systems for HVAC
Change No. 1 to ETL 83-1, U.S. Air Force
Standardized Heating, Ventilating & Air
Conditioning (HVAC) Control Systems
Interior Wiring Systems, AFM 88-l5, Para 7-3
EMCS Data Transmission Media (DTM)
Considerations
Plumbing, AFM 88-8, Chapter 4
Use of Air-to-Air Unitary Heat Pumps
Insulation
Computer Energy Analysis
C h a n g e 1 R e f : H Q U S A F / L E E E U M s g 0 3 1 6 0 02
MAY 84
MCP Energy Conservation Investment Program
(ECIP)
Air Force Building Construction and the Use of
Termiticides
Energy Management and Control Systems (EMCS)
Paints and Protective Coatings
Fuels Use Criteria for Air Force Construction
Aqueous Film Forming Foam Waste Discharge
Retention and Disposal
Lodging Facility Design Guide
Antiterrorism Planning and Design Guidance
Solar Applications
Direct Digital Control Heating, Ventilation,
and Air Conditioning Systems
Lead Ban Requirements of Drinking Water
Volatile Organic Compounds
Energy Budget Figures (EBFs) for Facilities in the
Military Construction Program
Utility Meters in New and Renovated Facilities
Prewiring
Photovoltaic Applications
Design Standards for Critical Facilities
Reliability & Maintainability (R&M). Design Checklist
Heat Distribution Systems Outside of Buildings
Radon Reduction in New Facility Construction
Atch 2
(1 of 5)
Date Issued
10 Nov 82
16 Feb 83
22 Jul 87
2 Mar 83
3 Apr 83
3 0 Aug 83
1 5 Sep 83
1 4 Nov 83
2 7 Mar 84
1 Jun 84
13 Jun 84
1 Aug 84
5 Feb 86
1 2 May 86
2 2 May 86
4 Jun 86
4 Jun 86
13 Jun 86
15 Oct 86
9 Dec 8 6
1 5 Jan 8 7
4 Mar 8 7
13 Mar 87
13 Jul 87
21 Oct 87
21 Jan 88
15 Jun 88
24 Jun 88
1 Aug 88
7 Oct 88
89-7
90-l
90-2
90-3
90-4
90-5
90-6
90-7
90-8
90-9
90-l0
91-l
91-2
91-4
91-5
Title
Prewired Workstations Guide Specification
Standard Guidelines for Submission of Facility
Operating and Maintenance Manuals
Facility Fire Protection Criteria for Electronic
Equipment Installations
Systems Furniture Guide Specification
Power Conditioning and Continuation Interfacing
Equipment (PCCIE) in the Military Construction
Program (MCP)
Design of Air Force Courtrooms
Built-Up Roof (BUR) Repair/Replacement
Guide Specification
General Policy for Prewired Workstations
and Systems Furniture
TEMPEST Protection for Facilities
Change 1 Ref: HQ USAF/LEEDE Ltr dated 20 April 90,
Same Subject
1990 Energy Prices and Discount Factors
for Life-Cycle Cost Analysis
Fuel and Lube Oil Bulk Storage Capacity
for Emergency Generators
Electrical System Grounding, Static Grounding
and Lightning Protection
Air Force Interior Design Policy
Guide Specifications for Ethylene Propylene
Diene Monomer (EPDM) Roofing
Fire Protection Engineering Criteria for Aircraft
Maintenance, Servicing, and Storage Facilities
Commissioning of Heating, Ventilating, and
Air Conditioning (HVAC) Systems Guide
S p e c i f i c a t i o n
Fire Protection Engineering Criteria
Testing Halon Fire Suppression Systems
High Altitude Electromagnetic Pulse (HEMP)
Hardening in Facilities
Site Selection Criteria for Fire Protection
Training Areas
Fire Protection Engineering Criteria Emergency Lighting and Marking of Exits
Atch 2
(2 of 5)
Date Issued
29 Dec 88
23 May 89
9 Jun 89
6 Jul 89
7 Sep 89
29 Sep 89
23 Jan 90
26 Jan 90
23 Mar 90
24 May 90
26 Jul 90
3 Oct 90
12 Oct 90
17 Oct 90
2 Nov 90
17 Oct 90
2 Jan 91
4 Mar 91
14 Jun 91
18 Jun 91
93-5
94-l
94-2
94-3
94-4
Title
Cathodic Protection
Chlorofluorocarbon (CFC) Limitation in \Heating,
Ventilating and Air-Conditioning (HVAC) Systems
Construction Signs
Dormitory Criteria for Humid Areas
Inventory, Screening, Prioritization, and Evaluation
of Existing Buildings for Seismic Risk
Fire Protection Engineering Criteria Automatic Sprinkler Systems in Military
Family Housing (MFH)
Fire Protection Engineering Criteria Electronic Equipment Installations
Standard Airfield Pavement Marking Schemes
Utility Meters in New and Renovated Facilities
Air Force Carpet Standard
Energy Usage Criteria for Facilities in the Military
Construction Program
Atch 2
(3 of 5)
Date Issued
3 Jul 91
21 Aug 91
11 Mar 93
13 Jul 93
18 Aug 93
11 Aug 93
22
5
10
10
Dec 93
Apr 94
Jun 94
Jun 94
? Aug 94
Date
82-l
82-3
82-4
82-5
82-6
82-7
83-2
83-5
83-6
83-l0
84-l
84-3
84-4
84-5
10 Nov 82
10 Nov 82
10 Nov 82
10 Nov 82
30 Dec 82
30 Nov 82
16 Feb 83
5 May 83
24 May 83
28 Nov 83
18 Jan 84
21 Mar 84
lO Apr 84
7 May 84
84-6
84-8
84-9
88-5
86-l
86-3
86-6
86-7
86-l1
86-l2
86-l3
86-l5
86-17
86-l8
87-3
87-6
87-7
87-8
88-l
88-5
88-7
88-8
89-l
89-5
91-8
91-3
Not Issued
19 Jun 84
5 Jul 84
2 Aug 88
3 Feb 86
21 Feb 86
3 Jun 86
3 Jun 86
3 Jul 86
3 Jul 86
18 Aug 86
13 Nov 86
17 Dec 86
18 Dec 86
12 Mar 87
21 Aug 87
14 Oct 87
19 Oct 87
5 Jan 88
2 Aug 88
24 Aug 88
4 Oct 88
6 Feb 89
24 Sep 91
14 Jun 91
Status
Superseded b y E T L s 8 3 - l 0 , 8 6 - 1 , 8 7 - 4
Superseded b y ETLs 83-5, 84-2
Superseded by ETL 84-7
Superseded b y E T L s 8 4 - 1 , 8 6 - l 3 , 8 6 - 1 4
Cancelled
Cancelled
Superseded by ETL 84-3
Superseded by ETL 84-2
Cancelled
Superseded by ETL 86-l
Superseded by ETL 86-14
Cancelled
Superseded b y E T L s 8 6 - 7 , 8 6 - l 5 , 8 7 - 5
Superseded b y E T L s 8 4 - 8 , 8 6 - l 1 , 8 6 - l 8 ,
88-6
Cancelled/Not Used
Superseded by ETL 86-l1
Superseded by ETL 88-7
Superseded by ETL 91-6
Superseded by ETL 87-7
Superseded by ETL 86-4
Superseded b y E T L s 8 6 - 1 1 , 8 6 - l 8 , 8 8 - 6
Superseded by ETL 86-15
Superseded by ETL 88-6
Superseded by ETL 90-2
Superseded by ETL 86-14
Superseded by ETL 87-5
Superseded by ETL 89-6
Superseded by ETL 88-6
Superseded b y ETLs 87-6, ETL 88-5
Superseded by ETL-88-5
Superseded by ETL 89-l
Superseded by ETL 90-l
Superseded by ETL 89-2
Superseded by ETL 91-6
Superseded b y ETLs 90-3, 91-2
Superseded by ETL 91-7
Superseded b y ETL 90-4
Issued as ETL 90-7
Cancelled
Superseded by MiL HDBK 1008B, Jan 94
Atch 2
(4 of 5)
Title
DD Form 1354 Checklist
Constructibility Review Checklist
Thirty-Percent Design Submittal
MAJCOM Construction Management
Warranty and Guarantee Program
Management of the MILCON Planning
and Execution Process
Definitions for Design Milestones
Date Issued
6 Jan 88
1 Nov 88
lO Apr 89
30 May 89
22 Sep 89
6 Mar 90
13 Mar 90
Status
Superseded by CTL 88-3
Superseded by CTL 90-l
Superseded by ETL
Replaced by Electronic Data File and Documentation in PDC/WIMS
Superseded by CTL 90-2
Issuance Cancelled
Atch 2
(5 of 5)
General Information.
Page 1
Runway Markings.
Page 2
Page 3
Page 4
..
.
I - . F
I
I
I
---F
I
Figure 2.2. Threshold, Designation Number, Edge Stripe, and Centerline Layout.
7
STANDARD
THRESHOLD
MARKINGS
THRESHOLD
DISPLACEMENT
MARKINGS
CENTERLINE MARKING
DIMENSION
METERS
42.672
1.830
3.660
1.220
3.648
6.100
4.876
30.500
32.308
18.288
0.152
0.460 - 0.920
. 9.150
C
D
E
F
H
J
K
L
M
N
P
R
0.914
FEET
140.0
1
!
6.0
12.0
4.0
10.0
20.0
16.0
100.0
106.0
60.0
0.5
1.5 - 3.0
30.0
3.0
Figure 2.3. Typical Displaced Threshold Layout on 150 feet wide Runway.
8
STANDARD THRESHOLD
MARKINGS
(a)
DISPLACED
THRESHOLD
MARKINGS
STANDARD THRESHOLD
MARKINGS
(b)
RUNWAY HOLDING
POSITION
STANDARD THRESHOLD
MARKINGS
(c)
SIDE STRIPES
42.672 m (140)
.CC
914 400 m (3000) FROF
STdRT OF THRESHOLD -
A
El
457200 m
S T A R T THRESHOLD
0 -gg
M
304.800 m (1000) FROM ,
START OF THRESHOLD -
9.-m
(301
11
3.048 m
(10)
1.524 m
5 RADIUS SEMI-CIRCLES
2.286 m(7.5)
3.048 m
(10')
13
3.
Page 14
Page 15
Page 16
RUNWAY
-HOLD
LINE
152.400 m
152.400 m
(500'
975.360 m
(3200')
60.960 m
(200')
- - - -
RUNWAY CENTERLINE
IDENTIFICATlON WILL BE
1.829 m (6) HIGH BLOCK
LETTERS OR NUMBERS USING
A 152 mm (6) STROKE.
TAXIWAY
- CENTERLINE
STRIPE
TAXI WAY
D
SHOULDER
TAXIWAY A
TO RUNWAY END25
19
4.
Helipads
Page 20
3.048 m
(l0)
RED
RED-
-RED
RED
457 mm (18)
-152 mm (St)
152 mm (6)
152 mm (6)-+
457 mm (18)
457 mm (18)
CROSS AND PAD BOUNDARY MARKINGS ARE WHITE AND MAY BE OUTLINED
WITH A 152 mm (6) WIDE RED BORDER TO IMPROVE CONTRAST.
PAD BOUNDARY MARKlNGS MAY BE EITHER A SOLID OR SEGMENTED LINE.
5.
Page 24
Page 25
Page 26
CENTERLINE
TAXIWAY
CENTERLINE
31
6.
Page 34
Page 35
Page-36