Project Team
Project Site Location
Project Brief
Structural Design
Challenges
Steel Composite Design
Offsite Fabrication &
Logistic
Construction Methodology
Progress Photos
Project Team
Project Team
Client
Architect
C&S Engineer
M&E Engineer
Contractor
Project Manager
Project Brief
62,000m2
24,000m2
38,000m2
810
269
263
278
5142
1903
1808
1431
55m x 20m
85.70m
Building function
Cultural use
Retail
Car parking
Building function
Building function
Auditorium
Building function
Outdoor Amphitheatre
Building function
Building function
Structural system
Steel Trusses
(Auditorium)
Composite Slab
(Offices /
auditorium)
RC Beam & Slab
(Retail)
RC Flat Slab
(Car park)
RC Columns
Core Walls
Bored Pile
Diaphragm Wall
1. Deep excavation
adjacent Railway
Protection Zone
2. Excavation below
MRT viaduct
3. Inclined columns
and lateral forces
4. Complex connection
details
5. Sky bridge Design
6. Vibration design of
auditorium
1. Deep excavation
adjacent Railway
Protection Zone
2. Excavation below
MRT viaduct
3. Inclined columns
and lateral forces
4. Complex connection
details
5. Sky bridge Design
6. Vibration design of
auditorium
Rochester Drive
Tilt meter
Inclinometer
Settlement Marker
Vibration meter
2.1mm
9.6mm
9.6mm
6.7mm
2.7mm
7.3mm
8.5mm
1. Deep excavation
adjacent Railway
Protection Zone
2. Excavation below
MRT viaduct
3. Inclined columns
and lateral forces
4. Complex connection
details
5. Sky bridge Design
6. Vibration design of
auditorium
SECTION D-D
STEP 2
STEP 1
STEP 4
STEP 3
STEP 5
STEP 6
Excavate down 1m
Expose Pilecap
1. Deep excavation
adjacent Railway
Protection Zone
2. Excavation below
MRT viaduct
3. Inclined columns
and lateral forces
4. Complex connection
details
5. Sky bridge Design
6. Vibration design of
auditorium
TEKLA Model
ETABS Model
1st Mode
MODAL Analysis
2nd Mode
Design loads
Lateral forces due to Inclined
column at random direction
Disproportionate collapse load
Horizontal and vertical load
3rd Mode
L5
B1
Elevation
Plan view
1. Deep excavation
adjacent Railway
Protection Zone
2. Excavation below
MRT viaduct
3. Inclined columns
and lateral forces
4. Complex connection
details
5. Sky bridge Design
6. Vibration design of
auditorium
Typical Tube
connection Detail
Without strengthening
With strengthening
Raker Truss
Roof Truss
1. Deep excavation
adjacent Railway
Protection Zone
2. Excavation below
MRT viaduct
3. Inclined columns
and lateral forces
4. Complex connection
details
5. Sky bridge design
6. Vibration design of
auditorium
Support 1
70mm
60mm
Support 2
Location 2
90mm
Support 2
Location 1
110mm
Support 1
Support 3
1. Deep excavation
adjacent Railway
Protection Zone
2. Excavation below
MRT viaduct
3. Inclined columns
and lateral forces
4. Complex connection
details
5. Sky bridge Design
6. Vibration design of
auditorium
Main Floor
Fastrak Model
Composite deck
Fireproofing
Storage Yard
Truss joints
Cast-in plates
Tube connection
PPBW Preparation
Welding Preparation
Welding preparation
Welding process
Welding
Testing welds
Construction Methodology
Excavation to B2 level
Column Casting
Setting up of Jacking
Frame
Progress Photos
Aug 09
Dec 09
May 10
Sep 10
Mar 11
Jun 11
Jan 12
Mar 12
Aug 12
Thank You