Federal Register / Vol. 71, No.

196 / Wednesday, October 11, 2006 / Notices 59775

0.5 to 2.0 MW, (4) anchoring systems, an unequivocal statement of intent to A copy of the application may be
(5) mooring lines, and (6) submit, if such an application may be obtained by agencies directly from the
interconnection transmission lines. The filed, either a preliminary permit Applicant. If an agency does not file
project is estimated to have an annual application or a development comments within the time specified for
generation of 8.76 gigawatt-hours per- application (specify which type of filing comments, it will be presumed to
unit per-year, which would be sold to a application). A notice of intent must be have no comments. One copy of an
local utility. served on the applicant(s) named in this agency’s comments must also be sent to
l. Locations of Applications: A copy of public notice. the Applicant’s representatives.
the application is available for q. Proposed Scope of Studies under
inspection and reproduction at the Permit: A preliminary permit, if issued, Magalie R. Salas,
Commission in the Public Reference does not authorize construction. The Secretary.
Room, located at 888 First Street NE., term of the proposed preliminary permit [FR Doc. E6–16791 Filed 10–10–06; 8:45 am]
Room 2A, Washington DC 20426, or by would be 36 months. The work BILLING CODE 6717–01–P
calling (202) 502–8371. This filing may proposed under the preliminary permit
also be viewed on the Commission’s would include economic analysis,
Web site at http://www.ferc.gov using preparation of preliminary engineering DEPARTMENT OF ENERGY
the ‘‘eLibrary’’ link. Enter the docket plans, and a study of environmental
number excluding the last three digits in impacts. Based on the results of these Federal Energy Regulatory
the docket number field to access the studies, the Applicant would decide Commission
document. For assistance, call toll-free whether to proceed with the preparation
Notice of Application Accepted for
1–866–208–3676 or e-mail of a development application to
Filing and Soliciting Motions To
FERCOnlineSupport@ferc.gov. For TTY, construct and operate the project.
r. Comments, Protests, or Motions to Intervene, Protests, and Comments
call (202) 502–8659. A copy is also
available for inspection and Intervene: Anyone may submit October 4, 2006.
reproduction at the address in item h comments, a protest, or a motion to Take notice that the following
above. intervene in accordance with the hydroelectric application has been filed
m. Individuals desiring to be included requirements of Rules of Practice and with the Commission and is available
on the Commission’s mailing list should Procedure, 18 CFR 385.210, 385.211, for public inspection:
so indicate by writing to the Secretary 385.214. In determining the appropriate a. Type of Application: Preliminary
of the Commission. action to take, the Commission will Permit.
n. Competing Preliminary Permit: consider all protests or other comments b. Project No: 12696–000.
Anyone desiring to file a competing filed, but only those who file a motion c. Date filed: June 15, 2006.
application for preliminary permit for a to intervene in accordance with the d. Applicant: Alaska Tidal Energy
proposed project must submit the Commission’s Rules may become a Company.
competing application itself, or a notice party to the proceeding. Any comments, e. Name of Project: Gastineau Channel
of intent to file such an application, to protests, or motions to intervene must Tidal Energy Hydroelectric Project.
the Commission on or before the be received on or before the specified f. Location: The project would be
specified comment date for the comment date for the particular located in Gastineau Channel, between
particular application (see 18 CFR 4.36). application. Douglas Island and the Alaskan
Submission of a timely notice of intent Comments, protests and interventions mainland near the city of Juneau, in
allows an interested person to file the may be filed electronically via the Juneau Borough, Alaska.
competing preliminary permit Internet in lieu of paper; See 18 CFR g. Filed Pursuant to: Federal Power
application no later than 30 days after 385.2001 (a)(1)(iii) and the instructions Act, 16 U.S.C. 791(a)—825(r).
the specified comment date for the on the Commission’s Web site under ‘‘e- h. Applicant Contacts: Joseph A.
particular application. A competing filing’’ link. The Commission strongly Cannon, Pillsbury Winthrop Shaw
preliminary permit application must encourages electronic filing. Pittman LLP, 2300 N Street, NW.,
conform with 18 CFR 4.30(b) and 4.36. s. Filing and Service of Responsive Washington, DC 20037, phone: (202)–
o. Competing Development Documents: Any filings must bear in all 663–8000, and Charles B. Cooper, TRC
Application: Any qualified development capital letters the title ‘‘COMMENTS’’, Environmental, Boott Mills South, 116
applicant desiring to file a competing ‘‘RECOMMENDATIONS FOR TERMS John St., Lowell, MA 01852, phone:
development application must submit to AND CONDITIONS’’, ‘‘PROTEST’’, (978)–656–3567.
the Commission, on or before a ‘‘COMPETING APPLICATION’’ OR i. FERC Contact: Chris Yeakel, (202)
specified comment date for the ‘‘MOTION TO INTERVENE’’, as 502–8132.
particular application, either a applicable, and the Project Number of j. Deadline for filing comments,
competing development application or a the particular application to which the protests, and motions to intervene: 60
notice of intent to file such an filing refers. Any of the above-named days from the issuance date of this
application. Submission of a timely documents must be filed by providing notice.
notice of intent to file a development the original and the number of copies The Commission’s Rules of Practice
application allows an interested person provided by the Commission’s and Procedure require all intervenors
to file the competing application no regulations to: The Secretary, Federal filing documents with the Commission
later than 120 days after the specified Energy Regulatory Commission, 888 to serve a copy of that document on
comment date for the particular First Street, NE., Washington, DC 20426. each person in the official service list
application. A competing license A copy of any motion to intervene must for the project. Further, if an intervenor
application must conform with 18 CFR also be served upon each representative files comments or documents with the
pwalker on PRODPC60 with NOTICES

4.30(b) and 4.36. of the Applicant specified in the Commission relating to the merits of an
p. Notice of Intent: A notice of intent particular application. issue that may affect the responsibilities
must specify the exact name, business t. Agency Comments: Federal, State, of a particular resource agency, they
address, and telephone number of the and local agencies are invited to file must also serve a copy of the document
prospective applicant, and must include comments on the described application. on that resource agency.

VerDate Aug<31>2005 16:53 Oct 10, 2006 Jkt 211001 PO 00000 Frm 00061 Fmt 4703 Sfmt 4703 E:\FR\FM\11OCN1.SGM 11OCN1
59776 Federal Register / Vol. 71, No. 196 / Wednesday, October 11, 2006 / Notices

k. Description of Project: The application must conform with 18 CFR also be served upon each representative
proposed project would consist of: (1) 4.30(b) and 4.36. of the Applicant specified in the
50 to 200 Tidal In Stream Energy p. Notice of Intent: A notice of intent particular application.
Conversion (TISEC) devices consisting must specify the exact name, business t. Agency Comments: Federal, state,
of, (2) rotating propeller blades, (3) address, and telephone number of the and local agencies are invited to file
integrated generators with a capacity of prospective applicant, and must include comments on the described application.
0.5 to 2.0 MW, (4) anchoring systems, an unequivocal statement of intent to A copy of the application may be
(5) mooring lines, and (6) submit, if such an application may be obtained by agencies directly from the
interconnection transmission lines. The filed, either a preliminary permit Applicant. If an agency does not file
project is estimated to have an annual application or a development comments within the time specified for
generation of 8.76 gigawatt-hours per- application (specify which type of filing comments, it will be presumed to
unit per-year, which would be sold to a application). A notice of intent must be have no comments. One copy of an
local utility. served on the applicant(s) named in this agency’s comments must also be sent to
l. Locations of Applications: A copy public notice. the Applicant’s representatives.
of the application is available for q. Proposed Scope of Studies under
inspection and reproduction at the Permit: A preliminary permit, if issued, Magalie R. Salas,
Commission in the Public Reference does not authorize construction. The Secretary.
Room, located at 888 First Street NE., term of the proposed preliminary permit [FR Doc. E6–16792 Filed 10–10–06; 8:45 am]
Room 2A, Washington DC 20426, or by would be 36 months. The work BILLING CODE 6717–01–P
calling (202) 502–8371. This filing may proposed under the preliminary permit
also be viewed on the Commission’s would include economic analysis,
Web site at http://www.ferc.gov using preparation of preliminary engineering DEPARTMENT OF ENERGY
the ‘‘eLibrary’’ link. Enter the docket plans, and a study of environmental
number excluding the last three digits in impacts. Based on the results of these Federal Energy Regulatory
the docket number field to access the studies, the Applicant would decide Commission
document. For assistance, call toll-free whether to proceed with the preparation
of a development application to Notice of Application Accepted for
1–866–208–3676 or e-mail
construct and operate the project. Filing and Soliciting Motions to
FERCOnlineSupport@ferc.gov. For TTY,
r. Comments, Protests, or Motions to Intervene, Protests, and Comments
call (202) 502–8659. A copy is also
available for inspection and Intervene: Anyone may submit October 4, 2006.
reproduction at the address in item h comments, a protest, or a motion to Take notice that the following
above. intervene in accordance with the hydroelectric application has been filed
m. Individuals desiring to be included requirements of Rules of Practice and with the Commission and is available
on the Commission’s mailing list should Procedure, 18 CFR 385.210, 385.211, for public inspection:
so indicate by writing to the Secretary 385.214. In determining the appropriate a. Type of Application: Preliminary
of the Commission. action to take, the Commission will Permit.
n. Competing Preliminary Permit: consider all protests or other comments b. Project No.: 12697–000.
Anyone desiring to file a competing filed, but only those who file a motion c. Date filed: June 15, 2006.
application for preliminary permit for a to intervene in accordance with the d. Applicant: Alaska Tidal Energy
proposed project must submit the Commission’s Rules may become a Company.
competing application itself, or a notice party to the proceeding. Any comments, e. Name of Project: Wrangell Narrows
of intent to file such an application, to protests, or motions to intervene must Tidal Energy Hydroelectric Project
the Commission on or before the be received on or before the specified f. Location: The project would be
specified comment date for the comment date for the particular located in Wrangell Narrows, between
particular application (see 18 CFR 4.36). application. Mitkof Island and the Lindenberg
Submission of a timely notice of intent Comments, protests and interventions Peninsula and Woewodski Island, in
allows an interested person to file the may be filed electronically via the Wrangell-Petersburg Borough, Alaska.
competing preliminary permit Internet in lieu of paper; See 18 CFR g. Filed Pursuant to: Federal Power
application no later than 30 days after 385.2001 (a)(1)(iii) and the instructions Act, 16 U.S.C. 791(a)–825(r).
the specified comment date for the on the Commission’s Web site under ‘‘e- h. Applicant Contacts: Joseph A.
particular application. A competing filing’’ link. The Commission strongly Cannon, Pillsbury Winthrop Shaw
preliminary permit application must encourages electronic filing. Pittman LLP, 2300 N Street, NW.,
conform with 18 CFR 4.30(b) and 4.36. s. Filing and Service of Responsive Washington, DC 20037, phone: (202)
o. Competing Development Documents: Any filings must bear in all 663–8000, and Charles B. Cooper, TRC
Application: Any qualified development capital letters the title ‘‘COMMENTS’’, Environmental, Boott Mills South, 116
applicant desiring to file a competing ‘‘RECOMMENDATIONS FOR TERMS John St., Lowell, MA 01852, phone:
development application must submit to AND CONDITIONS’’, ‘‘PROTEST’’, (978) 656–3567.
the Commission, on or before a ‘‘COMPETING APPLICATION’’ OR i. FERC Contact: Chris Yeakel, (202)
specified comment date for the ‘‘MOTION TO INTERVENE’’, as 502–8132.
particular application, either a applicable, and the Project Number of j. Deadline for filing comments,
competing development application or a the particular application to which the protests, and motions to intervene: 60
notice of intent to file such an filing refers. Any of the above-named days from the issuance date of this
application. Submission of a timely documents must be filed by providing notice.
notice of intent to file a development the original and the number of copies The Commission’s Rules of Practice
pwalker on PRODPC60 with NOTICES

application allows an interested person provided by the Commission’s and Procedure require all intervenors
to file the competing application no regulations to: The Secretary, Federal filing documents with the Commission
later than 120 days after the specified Energy Regulatory Commission, 888 to serve a copy of that document on
comment date for the particular First Street, NE., Washington, DC 20426. each person in the official service list
application. A competing license A copy of any motion to intervene must for the project. Further, if an intervenor

VerDate Aug<31>2005 16:53 Oct 10, 2006 Jkt 211001 PO 00000 Frm 00062 Fmt 4703 Sfmt 4703 E:\FR\FM\11OCN1.SGM 11OCN1