MCCRAY
CAREER TARGETS:
SENIOR CONSTRUCTION PROJECT MANAGER / PROJECT DIRECTOR
Over 30 years of progressively responsible leadership and project management experience,
directing full cycle of new building and infrastructure projects in U.S. and global locations. Proven
success in achieving safety, time, budget, and quality goals on multiple multimillion-dollar
projects around the world.
Capability to lead multi-use facilities, high-rise, large infrastructure and heavy civil projects.
Secret Security Clearance Capable of working with U.S. State Department and U.S. Embassies
Equally experienced working on Owners side or as General Contractor
Maintain an excellent record of safety on all projects, with an impressive record of zero lost time accidents.
Expertise in managing multi-national teams of contractors, engineers, government entities and consultants.
Proficient in providing constructability reviews during the pre-construction process to reduce time and costs.
P ROFESSIONAL E XPERIENCE
PARSONS CORPORATION Pasadena, CA 2013 2015 (Projects in Madinat Yanbu al Sinaiyah, Kingdom of Saudi
Arabia) on behalf of the Royal Commission (RC) for Jubail and Yanbu, (A Kingdom of Saudi Arabia governmental
agency) as a seconded manager.
Senior Resident Construction Manager and Authorized Representative Saudi Arabian Parsons LTD
Responsible to lead a staff of sixteen (16) engineers of various trades and seven (7) administrative secretaries in the
oversight of projects ranging from waterfront projects to heavy infrastructure for 19 projects simultaneously,
worth $800 million (3 Billion Saudi Riyals). These projects included:
Dredging and landfill of areas designated to be transformed from virgin sea shore areas along the Red
Sea to recreational areas for beaches, promenades, sports facilities, infrastructure for future hotels and
residential facilities, marinas, shore protection, hardscape, landscape and irrigation, islands, sea walls, and
sea wall erosion control systems for 13 kilometers of waterfront.
Medium voltage power (13.8 & 34.5 Kv) distribution from existing substations through duct-bank
construction systems.
Construction of all facility buildings, including washrooms, police stations, first aid stations, life guard
stations, and information kiosks.
Power distribution substations for power usage by major industrial customers, such as YASREF and
ARAMCO.
Industrial infrastructure to transform desert land into shovel ready sites, including roadways, street
lighting, sanitary sewer systems, industrial waste water sewer systems, waste water lift stations, process
water, irrigation distribution.
Coordinate with internal and external partners, including outside 3rd party utility organizations,
including MARAFIQ (provider of power, water, and waste water systems), ARAMCO, SWCC (Saline Water
Conversion Corporation), STC (Saudi Telecom Company, Mobily, Saudi Ministries of Transportation, Roads,
and Housing, Saudi Ministry of Interior (Coast Guard and Army).
(continued)
ROBERT B. MCCRAY,
PAGE 2
630-709-2834
RBMcCray@AOL.COM
PARSONS CORPORATION Pasadena, CA 2012 (Job in Madinat Yanbu al Sinaiyah, Kingdom of Saudi Arabia)
Senior Project Manager (Senior Resident Construction Manager Saudi Arabian Parsons Ltd)
Provided leadership in early stages of 20 story high-rise building (443 Million Saudi Riyals or $118 Million) - on the
Red Sea for the future headquarters of the Royal Commission of Jubail and Yanbu in Yanbu, KSA, including:
Interviewed, made recommendations for hire, and managed a group of 17 engineers, administrators,
cost engineers, schedulers, and construction professionals. Together this core group supervised third party
general contractor (Beijing Construction and Engineering Group BCEG) in the performance of the Contract
Created all new policies and procedures to fit the contractual obligations between BCEG and the
Royal Commission of Jubail and Yanbu.
Coordinated with all Saudi department heads, directors and His Excellency, the Executive
President and made recommendations for construction and engineering modifications.
Coordinated with Parsons Engineers & Architects in the creation of a BIM Model, using architectural,
structural, civil and MEP Revit models. Made recommendations on changes to building to avoid clashes and
to correct design deficiencies.
Made recommendations to the Royal Commission relative to LEED Silver requirements, both for
construction and design issues, but also for future building operations issues.
Worked with Parsons stateside engineers to correct many deficiencies created by original middle
eastern A/E firm.
KBR Houston, TX 2009-2011
Project Leader
Hired as Technical Professional and earned promotion in 6 months to Project Leader position (3rd highest civilian rank
on military base) in supporting military bases throughout Iraq. Oversaw all engineering and new construction
activities, coordinating efforts with Contracting Officer and military Garrison Command. Supervised employees
assigned to wastewater treatment plant, water purification facility, dining facilities, and other areas. Held
responsibility for 1,400 KBR employees at Camp Taji. Oversaw project controls, accounting, HSE, and HR matters.
Chaired semi-weekly senior staff meetings on site as well as weekly Job Progress meetings with camp commanders.
Managed completion of over 30 projects in 9 months, with each valued at over $1 million.
Achieved time and budget goals on each project with a minimal project workforce.
Drove turnaround for 10 open, late projects at Camp Al Asad, redirecting work and achieving project
completion within revised objectives. Projects included rehabilitation of existing hard-stand buildings on flight
line, installation of new trucking fuel tank farm, restoration of 2 entry control gates, and medical clinic
update.
Set procedures for reducing civilian foot print on camp by relocating all civilian contractors, including
administrative offices, living quarters, solid waste incinerators, light and heavy vehicle maintenance and
water purification units.
Directed team in on-time, on-budget installation of 100 containerized housing units within a 2month period at Camp Garry Owen near the Iranian border.
Coordinated efforts to bring Equipment Collection and Redistribution Site facility to Camp Taji,
working directly with 3-Star Generals, property managers, and maintenance persons operations-wide to
insure a proper transition of equipment to the U.S. or to the Government of Iraq.
Engineered and guided construction tasks for relocation of ROWPU facility (Reverse Osmosis Water
Purification Units), including all purification units, wells, and discharge through Iraqi Occupied territory.
MCSHANE CONSTRUCTION COMPANY Rosemont, IL 2007-2009
Senior Project Manager
Directed team of 2 project engineers, assistant project manager, superintendent, 2 labor foremen, and over 40
subcontractors in construction of $60 million senior housing facility with 271 assisted and independent living units.
Held signatory authority on all subcontracts, engineering change orders, and purchases. Worked with staff in creating
detailed schedule, procuring all subcontracts and materials, coordinating and monitoring all on-site subcontractors,
ensuring compliance for materials, and overseeing all changes to contract. Maintained and submitted cost reports.
Built positive relationships with the owner, subcontractors, local village officials, and consultants.
(continued)
ROBERT B. MCCRAY,
PAGE 3
630-709-2834
RBMcCray@AOL.COM
Added 7% to original fee of $420,000 through series of initiatives, including creating proactive
buyout schedule, locating appropriate subcontractors, and adding fee to changes in scope of work.
Maintained record of zero accidents on 25-month project due to proactive, site-specific safety plans
and frequent interactions/communications with subcontractors to ensure safety compliance.
Corrected major deficiencies jointly with architect and MEP consultants relative to ADA
requirements, fire separation issues, plumbing code deficiencies, electrical requirements, and HVAC issues.
Led project to on-time completion despite shift in ownership midway through the project and major
changes required based on above mentioned deficiencies.
Generated $200,000 savings and 3 months in schedule time savings by proposing pre-cast concrete
basement wall and first floor deck in lieu of cast-in-place concrete methods.
(continued)
ROBERT B. MCCRAY,
PAGE 4
630-709-2834
RBMcCray@AOL.COM
E DUCATION
Bachelor of Science in Civil Engineering
University of Illinois
All coursework completed for Masters of Science in Civil Engineering (Structural and Construction
Management Engineering specialty)
Marquette University
Certifications/Licenses
OSHA Certificate (30 hours),
Engineer-in-Training (EIT), State of Wisconsin
Secret Security Clearance with U.S. Federal Construction Projects
Advanced Open Water Scuba Diver
Community Affiliations
Glenbard West High School Boosters: President, VP, Membership Director
Glen Ellyn Boys Baseball: Board of Directors (15 yrs), Coach (17 years); Coach, Glen Ellyn Girls Softball (5 years);
BR Ryall YMCA: Board of Directors
Technology Skills Summary
MS Office Suite; Access Database Programming; Crystal Reports; Primavera P3 and P6 Scheduling and SureTrack
Scheduling; MS Project Scheduling; AutoCAD; TurboCADD; Prolog; Network Set-Up; Management of BIM