You are on page 1of 3

ABDUL SABOOR MARWAT

House # 51,Strt 35,Sector I-9-4,Islamabad Pakistan .


Mob# 03458504013 Email: saboormarwat@gmail.com
Email: saboormarwat@yahoo.com
Email: saboor.marwat@telenor.com.pk

CAREER SUMMMARY
Telecom professional with over 7 years of multi-vendor & multi-discipine experience.
Experience in 2G and 3G. Worked in Nokia, Siemens, Huawei, ZTE network environment.
In depth experience in new site planning, In-building solutions, pre-launch optimization,
redesign & parameter tuning, and post-launch optimization. Worked in Telenor Pakistan,
LCC, MTN Iran Cell, and ACE Telecom.

PRACTICAL EXPERIENCE :

Telenor Pakistan

(Dec-11 - to date )

Working as RF Planning Executive Engineer in Telenor Pakistan as Permanent employee ,Responsiable for
Planning and Optimizating of New sites.
Roll-Out

Mangaging Team of 11 Peoples for Rollout of 1000 New Sites

Planned over 200 sites for providing coverage to new areas and offloading existing sites to their
required traffic.

Nominal site design using ASSET planning tool and Map info/Google earth.

Conducted nominal site surveys/TSS for macro/ micro sites in different terrains including urban,
suburban, rural and hilly.

Verifying TSS data of team member, verifying site acquisition report (SAR).

USF Project

USF Chitral Project Currently managing Rollout of 127 sites of USF project.This includes

USF Shangla Project Planning phase of 80+ sites for USF Shanagla is completed and
subimitted for Approval to USF authorities. 2G+3G Coverage will be provided to about 400+
Muzas of the area.

Planning of sites for providing 2G coverage to the 1100 Muzas(villages) of different area.This
project is already KO

Prelaunch Optimization

Pre-launch Optimization and Integration of new Sites and ensuring they meet the GOS
requirements.

Daily monitoring of CSSR,DCR,INCHOSR,MPD,,SD blocking and TCH blocking of pre-launch


sites and their improvement by HOC, POC,ADJC and other parameter modifications, redesigns
and coordination with respective departments.

Drive Testing to identify problematic areas and issues. Optimization and troubleshooting using
Stats, DT tools and Analyzers.

IBS(Indoor Building Solution)

Conducts technical site survey for GSM In-Building Solutions (IBS)

Calculates power budget to ensure optimum design of Distributed Antenna System (DAS)

Prepares antenna and cabling layout, schematic diagram, BOQ/BOM.

Designing the In-Building Sectorization Plan

Conduct Frequency Planning and other parameters required for the IBS DataFill Preparation.

Handles the In Building Walktest using Nemo Handy and Nemo Outdoor/Indoor Drivetest Tool

Abdul Saboor Marwat 2

LCC International

(May-11 to Dec-11 )

(Huawei Mobilink PK Swap project)

Working as optimization engineer on Huawei-Mobilink PK swap Project


My responsibility includes pre and post swap KPI monitoring and ensuring improvement in KPI.

LCC International

(Feb-08 to April-11)

(NSN Telenor Pakistan)

RF Optimization Engineeer

Improve Quality of Service (QoS) of assigned area through resolution of worst performing cells
and cluster optimization.

Monitoring daily KPIs that include HOSR, DCR, DL/UL Quality, CSSR, TCH/SD blocking
using Nokia Report Suite and Nokias Network Doctor and carrying out the necessary optimization
and parameter tuning for further improvement.

Perform monthly drive test and quarterly network benchmarking on assigned routes, immediate
resolution of problems encountered during the test, using TEMS Investigation 8.0 for analysis.

Validate through drive test to ensure changes affected from BSC and BTS re-homing,
implementation of new frequency plan and activation of new BSS features doesnt hamper network
quality.

Responsible for the GPRS/EDGE data traffic monitoring and optimization to ensure seamless data
availability & high throughput.

Drive tests for Providing In-Building Solutions which include Coverage with Macro/Micro Cell
Nokia BTS, Repeater and various in building Omni & Directional Antennas.

Perform Frequency Planning and Adjacency Optimization through weekly KPI measurements and
MIPT tool in Mapinfo.

The Optimization activities post drive test included foot printing of all the sites in order to control
the site overshoot, cell dragging, interference elimination, monitoring of RX Quality, layer 3
messages, two way neighbor relations, locating handover failures, call drops, call blocks, coverage
holes, improving and expanding coverage areas after comparing the prediction and its
measurement, taking the terrain conditions into consideration.

Expertise in handling capacity, coverage & quality issues in the network.

MTN IRAN Cell

(Sep-06 to Jan-07)

(NSN)

RF Optimization/Planning Engineeer
My work experience includes:

ACE Telecom

Area profiling and Nominal planning for location of new sites


Initial Fequency & BSIC planning for radio network.
Site search
Technical site survey (TSS)
Pre-Launch Optimization of network
Optimizing the network after analyzing the network KPIs & stats.
Diagnose the problems of the network and suggest changes in RF frequencies/hopping
sequence/neighbors and tilts to improve the end user quality.
(Jun, 06 to Sep-06 & Jan-07 to Feb-08)

RF Optimization Engineeer

(NSN Telenor Pakistan)

Abdul Saboor Marwat 3


My resposibilites included:

Site Verifications using TEMS Investigation 5.1.1


Cluster Drive Testing using short and long call sequence for site acceptance.
Area drive testing and coverage of the sites
Participation in BTS/BSC Migration via drive test validation on border areas.
Interference and frequency scanning
Post processing of drive test log files using TEMS Investigation Dtata Collection 5.1.1,6.0,8.0.3,
Nemo outdoor,Actix, TEMS Investigation Route Analysis 8.0.3,And MapInfo Professional
Nemo outdoor is used with MOS equipment for conducting city level DT.
Identifying problems like Handover failures, Low power TRXs, drop/blocked calls, sector swapping
.
Site Audits
Making Site audit reports and suggesting required changes .

TECHNICAL SKILLS/TOOLS

Nokia NetAct
Network Doctor (ND)
Nokia Reporting Suite
AIRCOM Optima lite
AIRCOM Asset Enterprise 6.0
TEMS Investigation & Route Analysis 8.0.3
ACTIX (For Post Processing Analysis).
Site Master
NEMO Analyze
NEMO for MOS Testing
MapInfo Professional 8.5. (MCOM, MIPT, WFI SiteSee).
Huawei GENEX Probe & Assistant .
iManager M2000.
i Manager Performance Report System (PRS)

ACADEMICS

B.E. Computer Engineering Dec-02 to Jun-06


REFERENCES

E&ME ( NUST)

You might also like