You are on page 1of 2

Federal Register / Vol. 71, No.

151 / Monday, August 7, 2006 / Notices 44687

comments in response to this Notice of comments, orders, notices and f. Location: The project would be
Intent. For information on electronically rulemakings. Once on the FERC Web located in the Pacific Ocean about 3
filing comments, please see the site, click on the ‘‘eLibrary link,’’ select miles off shore in Douglas County,
instructions on the Commission’s Web ‘‘General Search’’ and in the ‘‘Docket Oregon.
site at www.ferc.gov. Number’’ field enter the project docket g. Filed Pursuant to: Federal Power
The public scoping meetings are number excluding the last three digits Act, 16 U.S.C. 791(a)–825(r).
designed to provide another opportunity (PF06–28). When researching h. Applicant Contacts: Charles F.
to offer comments on the proposed information be sure to select an Dunleavy, Reedsport OPT Wave Park,
project. Interested groups and appropriate date range. In addition, the LLC, 1590 Reed Road, Pennington, NJ
individuals are encouraged to attend the FERC now offers a free e-mail service 08534, phone: (609)–730–0400.
meetings and to present comments on called eSubscription that allows you to i. FERC Contact: Robert Bell, (202)
the environmental issues they believe keep track of all formal issuances and 502–6062.
should be addressed in the EIS. A submittals in specific dockets. This can j. Deadline for filing comments,
transcript of each meeting will be reduce the amount of time you spend protests, and motions to intervene: 60
generated so that your comments will be researching proceedings by days from the issuance date of this
accurately recorded. automatically providing you with notice.
Once SESH formally files its The Commission’s Rules of Practice
notification of these filings, document
application with the Commission, you and Procedure require all intervenors
summaries and direct links to the
may want to become an official party to filing documents with the Commission
documents. To register for this service,
the proceeding known as an to serve a copy of that document on
go to www.ferc.gov/esubscribenow.htm.
‘‘intervenor.’’ Intervenors play a more Public meetings or site visits will be each person in the official service list
formal role in the process and are able posted on the Commission’s calendar for the project. Further, if an intervenor
to file briefs, appear at hearings, and be located at www.ferc.gov/EventCalendar/ files comments or documents with the
heard by the courts if they choose to EventsList.aspx along with other related Commission relating to the merits of an
appeal the Commission’s final ruling. information. issue that may affect the responsibilities
An intervenor formally participates in a For assistance with the FERC Web site of a particular resource agency, they
Commission proceeding by filing a or with eSubscription, please contact must also serve a copy of the document
request to intervene. Instructions for FERC Online Support at on that resource agency.
becoming an intervenor are included in FERCOnlineSupport@ferc.gov or toll k. Description of Project: The
the User’s Guide under the ‘‘e-filing’’ free at 1–866–208–3676, or TTY, contact proposed project would consist of: (1)
link on the Commission’s Web site. (202) 502–8659. 200 Power Buoys having a total
Please note that you may not request Finally, SESH has established an installed capacity of 50 megawatts, (2) a
intervenor status at this time. You must Internet Web site for this project at proposed 13.8 kilovolt transmission
wait until a formal application is filed www.duke-energy.com/companies/degt/ line; and (3) appurtenant facilities. The
with the Commission. projects/sesh/. The Web site includes a project is estimated to have an annual
description of the project, a map of the generation of 153.3 gigawatt-hours per-
Environmental Mailing List unit per-year, which would be sold to a
proposed pipeline route, and answers to
An effort is being made to send this frequently asked questions. You can local utility.
notice to all individuals, organizations, also request additional information or l. Locations of Applications: A copy of
and government entities interested in provide comments directly to SESH at the application is available for
and/or potentially affected by the 1–888–312–7374. inspection and reproduction at the
proposed project. This includes all Commission in the Public Reference
landowners who are potential right-of- Magalie R. Salas, Room, located at 888 First Street, NE.,
way grantors, whose property may be Secretary. Room 2A, Washington, DC 20426, or by
used temporarily for project purposes, [FR Doc. E6–12720 Filed 8–4–06; 8:45 am] calling (202) 502–8371. This filing may
or who own homes within distances BILLING CODE 6450–01–P also be viewed on the Commission’s
defined in the Commission’s regulations Web site at http://www.ferc.gov using
of certain aboveground facilities. the ‘‘eLibrary’’ link. Enter the docket
If you received this notice, you are on DEPARTMENT OF ENERGY number excluding the last three digits in
the environmental mailing list for this the docket number field to access the
project. If you do not want to send Federal Energy Regulatory document. For assistance, call toll-free
comments at this time, but still want to Commission 1–866–208–3676 or e-mail
remain on our mailing list, please return FERCOnlineSupport@ferc.gov. For TTY,
the Information Request (Appendix 3). If Notice of Application Accepted for call (202) 502–8659. A copy is also
you do not return the Information Filing and Soliciting Motions To available for inspection and
Request, you will be removed from the Intervene, Protests, and Comments reproduction at the address in item h
Commission’s environmental mailing July 28, 2006. above.
list. Take notice that the following m. Individuals desiring to be included
hydroelectric application has been filed on the Commission’s mailing list should
Availability of Additional Information so indicate by writing to the Secretary
with the Commission and is available
Additional information about the for public inspection: of the Commission.
project is available from the a. Type of Application: Preliminary n. Competing Preliminary Permit:
Commission’s Office of External Affairs, Permit. Anyone desiring to file a competing
at 1–866–208–FERC (3372). Additional application for preliminary permit for a
sroberts on PROD1PC70 with NOTICES

b. Project No.: 12713–000.


information can also be found on the c. Date filed: July 14, 2006. proposed project must submit the
Internet at www.ferc.gov. The ‘‘eLibrary d. Applicant: Reedsport OPT Wave competing application itself, or a notice
link’’ on the FERC Web site provides Park, LLC. of intent to file such an application, to
access to documents submitted to and e. Name of Project: Reedsport OPT the Commission on or before the
issued by the Commission, such as Wave Park Project. specified comment date for the

VerDate Aug<31>2005 17:19 Aug 04, 2006 Jkt 208001 PO 00000 Frm 00083 Fmt 4703 Sfmt 4703 E:\FR\FM\07AUN1.SGM 07AUN1
44688 Federal Register / Vol. 71, No. 151 / Monday, August 7, 2006 / Notices

particular application (see 18 CFR 4.36). comment date for the particular the Brush Hollow Creek of the Arkansas
Submission of a timely notice of intent application. River in Fremont County in Penrose,
allows an interested person to file the Comments, protests and interventions Colorado.
competing preliminary permit may be filed electronically via the f. Filed Pursuant to: Federal Power
application no later than 30 days after Internet in lieu of paper; See 18 CFR. Act, 16 U.S.C. 791(a)–825(r).
the specified comment date for the 385.2001(a)(1)(iii) and the instructions g. Applicant contact: Mark Morley, 15
particular application. A competing on the Commission’s Web site under ‘‘e- North Nevada Ave., Colorado Springs,
preliminary permit application must filing’’ link. The Commission strongly CO 80903, (719) 499–4390.
conform with 18 CFR 4.30(b) and 4.36. encourages electronic filing. h. FERC Contact: Tom Papsidero,
o. Competing Development s. Filing and Service of Responsive (202) 502–6002.
Application: Any qualified development Documents: Any filings must bear in all i. Deadline for filing comments,
applicant desiring to file a competing capital letters the title ‘‘COMMENTS’’, protests, and motions to intervene: 60
development application must submit to ‘‘RECOMMENDATIONS FOR TERMS days from the issuance date of this
the Commission, on or before a AND CONDITIONS’’, ‘‘PROTEST’’, notice.
specified comment date for the ‘‘COMPETING APPLICATION’’ or All documents (original and eight
particular application, either a ‘‘MOTION TO INTERVENE’’, as copies) should be filed with Magalie R.
competing development application or a applicable, and the Project Number of Salas, Secretary, Federal Energy
notice of intent to file such an the particular application to which the Regulatory Commission, 888 First
application. Submission of a timely filing refers. Any of the above-named Street, NE., Washington, DC 20426.
notice of intent to file a development documents must be filed by providing Comments, protests and interventions
application allows an interested person the original and the number of copies may be filed electronically via the
to file the competing application no provided by the Commission’s Internet in lieu of paper; see 18 CFR
later than 120 days after the specified regulations to: The Secretary, Federal 385.2001(a)(1)(iii) and the instructions
comment date for the particular Energy Regulatory Commission, 888 on the Commission’s Web site under the
application. A competing license First Street, NE., Washington, DC 20426. ‘‘e-Filing’’ link. The Commission
application must conform with 18 CFR A copy of any motion to intervene must strongly encourages electronic filings.
§ 4.30(b) and 4.36. also be served upon each representative Please include the project number (P–
p. Notice of Intent: A notice of intent of the Applicant specified in the 12714–000) on any comments or
must specify the exact name, business particular application. motions filed.
address, and telephone number of the t. Agency Comments: Federal, State, The Commission’s Rules of Practice
prospective applicant, and must include and local agencies are invited to file and Procedure require all intervenors
an unequivocal statement of intent to comments on the described application. filing documents with the Commission
submit, if such an application may be A copy of the application may be to serve a copy of that document on
filed, either a preliminary permit obtained by agencies directly from the each person in the official service list
application or a development Applicant. If an agency does not file for the project. Further, if an intervenor
application (specify which type of comments within the time specified for files comments or documents with the
application). A notice of intent must be filing comments, it will be presumed to Commission relating to the merits of an
served on the applicant(s) named in this have no comments. One copy of an issue that may affect the responsibilities
public notice. agency’s comments must also be sent to of a particular resource agency, they
q. Proposed Scope of Studies under the Applicant’s representatives. must also serve a copy of the document
Permit: A preliminary permit, if issued, Magalie R. Salas, on that resource agency.
does not authorize construction. The Secretary. j. Description of Existing Facilities
term of the proposed preliminary permit [FR Doc. E6–12713 Filed 8–4–06; 8:45 am] and Proposed Project: The proposed
would be 36 months. The work BILLING CODE 6450–01–P
project would consist of the following
proposed under the preliminary permit new facilities: (1) An upper reservoir
would include economic analysis, with a maximum storage capacity of
preparation of preliminary engineering DEPARTMENT OF ENERGY 58,000 acre-feet and a surface area of
plans, and a study of environmental 1,114 acres at normal water surface
impacts. Based on the results of these Federal Energy Regulatory elevation of 5,600 feet above mean sea
studies, the Applicant would decide Commission level (msl), impounded by an earthen
whether to proceed with the preparation dam, 70-foot-high and 1,400-foot-long;
of a development application to Notice of Application Accepted for (2) a 38,000-foot-long, 4-foot-diameter
construct and operate the project. Filing and Soliciting Comments, reservoir river diversion concrete-
r. Comments, Protests, or Motions To Protests, and Motions To Intervene reinforced pipeline; (3) a 21,750 or
Intervene: Anyone may submit July 28, 2006. 17,825-foot-long, 4-foot-diameter steel
comments, a protest, or a motion to Take notice that the following pipe and/or steel- or concrete-lined
intervene in accordance with the hydroelectric application has been filed penstock; (4) a powerhouse with two
requirements of Rules of Practice and with the Commission and is available 180–220-megawatt pump/turbines; (5) a
Procedure, 18 CFR 385.210, .211, .214. for public inspection: lower reservoir with a maximum storage
In determining the appropriate action to a. Type of Application: Preliminary capacity of 10,000 acre-feet and a
take, the Commission will consider all Permit. surface area of 200 acres at maximum
protests or other comments filed, but b. Project No.: 12714–000. water surface elevation of 5,175 feet
only those who file a motion to c. Date filed: July 14, 2006. msl, impounded by a 140-foot-high,
sroberts on PROD1PC70 with NOTICES

intervene in accordance with the d. Applicant: H2O Providers L.L.C. 3,800-foot-long earthen dam; (8) a 9-
Commission’s Rules may become a e. Name and Location of Project: The mile-long, 115-kilovolt transmission
party to the proceeding. Any comments, proposed Phantom Canon Hydroelectric line. The proposed project would have
protests, or motions to intervene must Pumped Back Storage/Hydroelectric an annual generation of 280,800–
be received on or before the specified Generation Project would be located on 457,600 MWh.

VerDate Aug<31>2005 17:19 Aug 04, 2006 Jkt 208001 PO 00000 Frm 00084 Fmt 4703 Sfmt 4703 E:\FR\FM\07AUN1.SGM 07AUN1

You might also like