39680 Federal Register / Vol. 71, No.

134 / Thursday, July 13, 2006 / Notices

DEPARTMENT OF ENERGY m. Copies of the PAD and Scoping there is the possibility that an
Document 1 (SD1) are available for Environmental Impact Statement (EIS)
Federal Energy Regulatory review at the Commission in the Public will be required. Nevertheless, the
Commission Reference Room or may be viewed on scoping meetings will satisfy the NEPA
[Project No. 12058–002] the Commission’s Web site (http:// scoping requirements, irrespective of
www.ferc.gov), using the ‘‘eLibrary’’ whether an EA or EIS is issued by the
Baker County; Notice of Intent to File link. Enter the docket number, Commission.
License Application, Filing of Pre- excluding the last three digits in the
docket number field to access the Scoping Meetings
Application Document,
Commencement of Licensing document. For assistance, contact FERC We will hold a daytime and night
Proceeding, Scoping Meetings, Online Support at time scoping meeting at the times and
Solicitation of Comments on the Pad FERCONlineSupport@ferc.gov or toll places noted below. We invite all
and Scoping Document, and free at 1–866–208–3676, of for TTY, interested individuals, organizations,
Identification of Issues and Associated (202) 502–8659. A copy is also available and agencies to attend one or both of the
Study Requests for inspection and reproduction at the meetings, and to assist staff in
address in paragraph n. identifying particular study needs, as
June 27, 2006. Register online at http://ferc.gov/ well as the scope of environmental
a. Type of Filing: Notice of Intent to esubscribenow.htm to be notified via e- issues to be addressed in the
File License Application for an original mail of new filing and issuances related environmental document. The time and
License and Pre-Application Document. to this or other pending projects. For location of these meetings are as
b. Project No.: 12058–002. assistance, contact FERC Online follows:
c. Dated Filed: April 27, 2006. Support. Date and Time: Wednesday, July 26,
d. Submitted By: Baker County. n. With this notice, we are soliciting 2006, 1 p.m. (PDT).
e. Name of Project: Mason Dam comments on the PAD and SD1 as well Location: Baker County’s Extension
Hydroelectric Project. as study requests. All comments on the Building, 2610 Grove Street, Baker City,
f. Location: The proposed Mason Dam PAD and SD1, and study requests Oregon.
Hydroelectric Project would be located should be sent to the address above in Date and Time: Wednesday, July 26,
on the Powder River in Baker County, paragraph h. In addition, all comments 2006, 7 p.m. (PDT).
Oregon. The proposed project would on the PAD and SD1, study requests, Location: Baker County’s Extension
likely occupy lands of the United States requests for cooperating agency status, Building, 2610 Grove Street, Baker City,
within the jurisdiction of the U.S. Forest and all communications to Commission Oregon.
Service and the Bureau of Reclamation. staff related to the merits of the For Directions: Please call Robin
g. Filed Pursuant to: 18 CFR part 5 of potential application (original and eight Nudd, of Baker County Board of
the Commission’s Regulations. copies) must be filed with the Commissioners at (541) 523–8200.
h. Potential Applicant Contact: Fred Commission at the following address: Scoping Document 1 (SD1), which
Warner Jr., County Commission Chair, Magalie R. Salas, Secretary, Federal outlines the subject areas to be
1995 3rd Street, Baker City, OR, 97814, Energy Regulatory Commission, 888 addressed in the environmental
(541) 523–8200. First Street, NE., Washington, DC 20426. document, has been mailed to the
i. FERC Contact: Kenneth Hogan (202) All filings with the Commission must individuals and entities on the
502–8434 or via e-mail at include on the first page, the project Commission’s mailing list. Copies of
Kenneth.Hogan@ferc.gov. name (Mason Dam Hydroelectric SD1 will be available at the scoping
j. We are asking Federal, State, local, Project) and number (P–12058–002), meetings, or may be viewed on the Web
and tribal agencies with jurisdiction and bear the heading ‘‘Comments on at http://www.ferc.gov, using the
and/or special expertise with respect to Pre-Application Document,’’ ‘‘Study ‘‘eLibrary’’ link. Follow the directions
environmental issues to cooperate with Requests,’’ ‘‘Comments on Scoping for accessing information in paragraph
us in the preparation of the Document 1,’’ ‘‘Request for Cooperating p. Depending on the extent of comments
environmental document. Agencies who Agency Status,’’ or ‘‘Communications to received, a Scoping Document 2 (SD2)
would like to request cooperating status and from Commission Staff.’’ Any may or may not be issued.
should follow the instructions for filing individual or entity interested in
comments described in paragraph n submitting study requests, commenting Site Visit
below. on the PAD or SD1, and any agency The potential applicant and
k. With this notice, we are initiating requesting cooperating status must do so Commission staff will conduct a site
informal consultation with: (a) The U.S. by August 25, 2006. visit of the proposed project on
Fish and Wildlife Service and/or NOAA Comments on the PAD and SD1, Tuesday, July 25, 2006, starting at 1
Fisheries under section 7 of the study requests, requests for cooperating p.m. All participants should meet at the
Endangered Species Act and the joint agency status, and other permissible Baker County Courthouse, located at
agency regulations there under at 50 forms of communications with the 1995 3rd Street, Baker City, Oregon,
CFR Part 402; and (b) the State Historic Commission may be filed electronically 97184. All participants are responsible
Preservation Officer, as required by via the Internet in lieu of paper. The for their own transportation. Anyone
section 106, National Historical Commission strongly encourages with questions about the site visit
Preservation Act, and the implementing electronic filings. See 18 CFR should contact Ms. Robin Nudd of Baker
regulations of the Advisory Council on 385.2001(a)(1)(iii) and the instructions County Board of Commissioners at (541)
Historic Preservation at 36 CFR 800.2. on the Commission’s Web site (http:// 523–8200 on or before July 4, 2006.
l. Baker County filed a Pre- www.ferc.gov) under the ‘‘e-filing’’ link.
sroberts on PROD1PC70 with NOTICES

Application Document (PAD); including o. At this time, Commission staff Scoping Meeting Objectives
a proposed process plan and schedule intends to prepare an Environmental At the scoping meeting, staff will: (1)
with the Commission, pursuant to 18 Assessment for the project, in Present the proposed list of issues to be
CFR 5.6 of the Commission’s accordance with the National addressed in the EA; (2) review and
regulations. Environmental Policy Act. However, discuss existing conditions and resource

VerDate Aug<31>2005 17:46 Jul 12, 2006 Jkt 208001 PO 00000 Frm 00026 Fmt 4703 Sfmt 4703 E:\FR\FM\13JYN1.SGM 13JYN1
Federal Register / Vol. 71, No. 134 / Thursday, July 13, 2006 / Notices 39681

agency management objectives; (3) Company, 101 Madison Street, P.O. Box filing refers. All documents (original
review and discuss existing information 780 MC–CP850, Jefferson City, MO and eight copies) should be filed with:
and identify preliminary information 65102, telephone: (573) 681–7246. Magalie R. Salas, Secretary, Federal
and potential study needs; (4) review i. FERC Contact: Any questions on Energy Regulatory Commission, 888
and discuss the process plan and this notice should be addressed to Mr. First Street, NE., Washington DC 20426.
schedule for pre-filing activity that Robert Bell at (202) 502–6062. A copy of any motion to intervene must
incorporates the time frames provided j. Deadline for filing comments and or also be served upon each representative
for in Part 5 of the Commission’s motions: July 27, 2006. of the Applicant specified in the
regulations and, to the extent possible, k. Description of Request: In the filing, particular application.
maximizes coordination of federal, state, Missouri Ameren Union Electric p. Agency Comments—Federal, State,
and tribal permitting and certification Company, (Ameren) requests and local agencies are invited to file
processes; and (5) discuss requests by Commission approval to remove 180.22 comments on the described application.
any federal or state agency or Indian acres of land from the project boundary, A copy of the application may be
tribe acting as a cooperating agency for and to revise the Exhibit G to show the obtained by agencies directly from the
development of an environmental revised project boundary. Applicant. If an agency does not file
document. l. Locations of the Application: A comments within the time specified for
Meeting participants should come copy of the application is available for filing comments, it will be presumed to
prepared to discuss their issues and/or inspection and reproduction at the have no comments. One copy of an
Commission’s Public Reference Room,
concerns. Please review the Pre- agency’s comments must also be sent to
located at 888 First Street, NE., Room
Application Document in preparation the Applicant’s representatives.
2A, Washington, DC 20426, or by calling
for the scoping meeting. Directions on q. Comments, protests and
(202) 502–8371. Information about this
how to obtain a copy of the PAD and interventions may be filed electronically
filing may also be viewed on the
SD1 are included in item m of this via the Internet in lieu of paper. See, 18
Commission’s Web site at http://
document. CFR 385.2001(a)(1)(iii) and the
www.ferc.gov using the ‘‘eLibrary’’ link.
instructions on the Commission’s Web
Scoping Meeting Procedures Enter the docket number excluding the
site at http://www.ferc.gov under the ‘‘e-
The scoping meeting will be recorded last three digits in the docket number
Filing’’ link.
by a stenographer and will become part field to access the document. You may
of the formal Commission record on the also register online at http:// Magalie R. Salas,
project. www.ferc.gov/docs-filing/ Secretary.
esubscription.asp to be notified via e- [FR Doc. E6–10989 Filed 7–12–06; 8:45 am]
Magalie R. Salas, mail of new filings and issuances BILLING CODE 6717–01–P
Secretary. related to this or other pending projects.
[FR Doc. E6–10988 Filed 7–12–06; 8:45 am] For assistance, call 1–866–208–3676 or
BILLING CODE 6717–01–P e-mail FERCOnlineSupport@ferc.gov, DEPARTMENT OF ENERGY
for TTY, call (202) 502–8659. A copy is
also available for inspection and Federal Energy Regulatory
DEPARTMENT OF ENERGY reproduction at the address in item (h) Commission
above.
Federal Energy Regulatory [Docket No. RP01–245–016]
m. Individuals desiring to be included
Commission on the Commission’s mailing list should Transcontinental Gas Pipe Line
[Project No. 459–158] so indicate by writing to the Secretary Corporation; Notice of Technical
of the Commission. Conference
Missouri Ameren Union Electric n. Comments, Protests, or Motions to
Company; Notice of Application for Intervene—Anyone may submit June 27, 2006.
Amendment of License and Soliciting comments, a protest, or a motion to Take notice that the Commission will
Comments, Motions to Intervene, and intervene in accordance with the convene a technical conference on
Protests requirements of Rules of Practice and Monday, July 24, 2006, at 9 a.m. (EDT),
Procedure, 18 CFR 385.210, .211, .214. in a room to be designated at the offices
June 27, 2006. In determining the appropriate action to of the Federal Energy Regulatory
Take notice that the following take, the Commission will consider all Commission, 888 First Street, NE.,
application has been filed with the protests or other comments filed, but Washington DC 20426.
Commission and is available for public only those who file a motion to The Commission’s May 30, 2006 order
inspection: intervene in accordance with the in this proceeding established a
a. Application Type: Amendment of Commission’s Rules may become a technical conference to address the
License. party to the proceeding. Any comments, issue of the appropriate method of
b. Project No.: 459–158. protests, or motions to intervene must conducting pooling in Transco’s Zone
c. Date Filed: May 15, 2006. be received on or before the specified 4.1 The order found that there are
d. Applicant: Missouri Ameren Union comment date for the particular certain aspects of the operation of the
Electric Company. application. current Zone 4 pool at Station 85 that
e. Name of Project: Osage Project. o. Filing and Service of Responsive were unclear from the present record.
f. Location: The project is located on Documents—Any filings must bear in The Commission found that a technical
the Osage River, Benton, and Camden all capital letters the title conference will provide an opportunity
Counties, Missouri. ‘‘COMMENTS’’,
sroberts on PROD1PC70 with NOTICES

to clarify the present operation of the


g. Filed Pursuant to: Federal Power ‘‘RECOMMENDATIONS FOR TERMS Station 85 pooling point and consider
Act, 16 U.S.C. 791a—825r. AND CONDITIONS’’, ‘‘PROTEST’’, OR whether improvements could be made
h. Applicant Contact: Mr. Mark C. ‘‘MOTION TO INTERVENE’’, as
Jordan, General Supervisor Real Estate, applicable, and the Project Number of 1 Transcontinental Gas Pipe Line Corporation,

Missouri Ameren Union Electric the particular application to which the 115 FERC ¶ 61, 268 (2006).

VerDate Aug<31>2005 17:46 Jul 12, 2006 Jkt 208001 PO 00000 Frm 00027 Fmt 4703 Sfmt 4703 E:\FR\FM\13JYN1.SGM 13JYN1