You are on page 1of 2

39090 Federal Register / Vol. 71, No.

132 / Tuesday, July 11, 2006 / Notices

FERCOnlineSupport@ferc.gov. For TTY, of a development application to DEPARTMENT OF ENERGY


call (202) 502–8659. A copy is also construct and operate the project.
available for inspection and Federal Energy Regulatory
r. Comments, Protests, or Motions To
reproduction at the address in item h Commission
Intervene: Anyone may submit
above. comments, a protest, or a motion to
m. Individuals desiring to be included Notice of Application Accepting for
intervene in accordance with the Filing and Soliciting Motions To
on the Commission’s mailing list should
requirements of Rules of Practice and Intervene, Protests and Comments
so indicate by writing to the Secretary
Procedure, 18 CFR 385.210, 385.211,
of the Commission. July 3, 2006.
385.214. In determining the appropriate
n. Competing Preliminary Permit: Take notice that the following
Anyone desiring to file a competing action to take, the Commission will
consider all protests or other comments hydroelectric application has been filed
application for preliminary permit for a with the Commission and is available
proposed project must submit the filed, but only those who file a motion
to intervene in accordance with the for public inspection:
competing application itself, or a notice a. Type of Application: Preliminary
of intent to file such an application, to Commission’s Rules may become a
Permit.
the Commission on or before the party to the proceeding. Any comments,
b. Project No.: 12693–000.
specified comment date for the protests, or motions to intervene must c. Date Filed: June 16, 2006.
particular application (see 18 CFR 4.36). be received on or before the specified d. Applicant: Sutton Hydroelectric
Submission of a timely notice of intent comment date for the particular Company LLC.
allows an interested person to file the application. e. Name of Project: Sutton
competing preliminary permit Comments, protests and interventions Hydroelectric Project.
application no later than 30 days after may be filed electronically via the f. Location: On Elk River, in Sutton,
the specified comment date for the Internet in lieu of paper; See 18 CFR Braxton County, West Virginia. The
particular application. A competing 385.2001 (a)(1)(iii) and the instructions Sutton Dam is owned and operated by
preliminary permit application must on the Commission’s Web site under the U.S. Army Corps of Engineers.
conform with 18 CFR 4.30(b) and 4.36. ‘‘e-filing’’ link. The Commission g. Filed Pursuant to: Federal Power
o. Competing Development strongly encourages electronic filing. Act, 16 U.S.C. 791(a)–825(r).
Application: Any qualified development h. Applicant Contacts: Mr. M. Clifford
applicant desiring to file a competing s. Filing and Service of Responsive Phillips, Advanced Hydro Solutions
development application must submit to Documents: Any filings must bear in all LLC, 150 North Miller Road, Suite 450
the Commission, on or before a capital letters the title ‘‘COMMENTS’’, C, Fairlawn, OH 44333, (330) 869–8451.
specified comment date for the ‘‘RECOMMENDATIONS FOR TERMS i. FERC Contact: Etta Foster, (202)
particular application, either a AND CONDITIONS’’, ‘‘PROTEST’’, 502–8769.
competing development application or a ‘‘COMPETING APPLICATION’’ OR j. Deadline for filing comments,
notice of intent to file such an ‘‘MOTION TO INTERVENE’’, as protests, and motions to intervene: 60
application. Submission of a timely applicable, and the Project Number of days from the issuance date of this
notice of intent to file a development the particular application to which the notice.
application allows an interested person filing refers. Any of the above-named All documents (original and eight
to file the competing application no documents must be filed by providing copies) should be filed with Magalie R.
later than 120 days after the specified the original and the number of copies Salas, Secretary, Federal Energy
comment date for the particular provided by the Commission’s Regulatory Commission, 888 First
application. A competing license regulations to: The Secretary, Federal Street, NE., Washington, DC 20426.
application must conform with 18 CFR Energy Regulatory Commission, 888 Please include the project number (P–
4.30(b) and 4.36. First Street, NE., Washington, DC 20426. 12693–000) on any comments, protests,
p. Notice of Intent: A notice of intent A copy of any motion to intervene must or motions filed.
must specify the exact name, business also be served upon each representative k. Description of Project: The
address, and telephone number of the of the Applicant specified in the proposed project would utilize the
prospective applicant, and must include existing U.S. Army Corps of Engineers’
particular application.
an unequivocal statement of intent to Sutton Dam and would consist of: (1) A
submit, if such an application may be t. Agency Comments: Federal, State, proposed powerhouse containing 2 or 3
filed, either a preliminary permit and local agencies are invited to file vertical turbine/generating units with a
application or a development comments on the described application. nominal total generating capacity of 12
application (specify which type of A copy of the application may be MW; (2) a 10-foot-diameter penstock; (3)
application). A notice of intent must be obtained by agencies directly from the a proposed 3⁄4 mile-long, 14.7 kV
served on the applicant(s) named in this Applicant. If an agency does not file transmission line; (4) a tailrace, and (5)
public notice. comments within the time specified for appurtenant facilities.
q. Proposed Scope of Studies under filing comments, it will be presumed to The project would have an estimated
Permit: A preliminary permit, if issued, have no comments. One copy of an annual generation of approximately
does not authorize construction. The agency’s comments must also be sent to 50,000 MWH. The applicant plans to
term of the proposed preliminary permit the Applicant’s representatives. sell the generated energy.
would be 36 months. The work l. Location of Application: A copy of
proposed under the preliminary permit Magalie R. Salas, the application is available for
would include economic analysis, Secretary. inspection and reproduction at the
sroberts on PROD1PC70 with NOTICES

preparation of preliminary engineering [FR Doc. E6–10802 Filed 7–10–06; 8:45 am] Commission in the Public Reference
plans, and a study of environmental BILLING CODE 6717–01–P Room, located at 888 First Street, NE.,
impacts. Based on the results of these Room 2A, Washington, DC 20426, or by
studies, the Applicant would decide calling (202) 502–8371. This filing may
whether to proceed with the preparation also be viewed on the Commission’s

VerDate Aug<31>2005 16:49 Jul 10, 2006 Jkt 208001 PO 00000 Frm 00042 Fmt 4703 Sfmt 4703 E:\FR\FM\11JYN1.SGM 11JYN1
Federal Register / Vol. 71, No. 132 / Tuesday, July 11, 2006 / Notices 39091

Web site at http://www.ferc.gov using preparation of preliminary engineering DEPARTMENT OF ENERGY


the ‘‘eLibrary’’ link. Enter the docket plans, and a study of environmental
number excluding the last three digits in impacts. Based on the results of these Federal Energy Regulatory
the docket number field to access the studies, the Applicant would decide Commission
document. For assistance, call toll-free whether to proceed with the preparation
1–866–208–3676 or e-mail of a development application to Notice of Application Accepted for
FERCOnlineSupport@ferc.gov. For TTY, construct and operate the project. Filing and Soliciting Motions To
call (202) 502–8659. A copy is also r. Comments, Protests, or Motions to Intervene, Protests, and Comments
available for inspection and Intervene: Anyone may submit July 3, 2006.
reproduction at the address in item h. comments, a protest, or a motion to Take notice that the following
above. intervene in accordance with the
m. Individuals desiring to be included hydroelectric application has been filed
requirements of Rules of Practice and with the Commission and is available
on the Commission’s mailing list should Procedure, 18 CFR 385.210, 385.211,
so indicate by writing to the Secretary for public inspection:
385.214. In determining the appropriate a. Type of Application: Preliminary
of the Commission. action to take, the Commission will
n. Competing Preliminary Permit: Permit.
consider all protests or other comments b. Project No.: 12698–000.
Anyone desiring to file a competing filed, but only those who file a motion
application for preliminary permit for a c. Date Filed: June 15, 2006.
to intervene in accordance with the d. Applicant: Public Utility District
proposed project must submit the Commission’s Rules may become a
competing application itself, or a notice No. 1 of Snohomish County,
party to the proceeding. Any comments, Washington.
of intent to file such an application, to protests, or motions to intervene must
the Commission on or before the e. Name of Project: Guemes Channel
be received on or before the specified Tidal Energy Project.
specified comment date for the
comment date for the particular f. Location: The project would be
particular application (see 18 CFR 4.36).
application. located in a section of Guemes Channel
Submission of a timely notice of intent
allows an interested person to file the Comments, protests and interventions between Guemes Island and Fidalgo
competing preliminary permit may be filed electronically via the Island in San Juan County, Washington.
application no later than 30 days after Internet in lieu of paper; See 18 CFR g. Filed Pursuant to: Federal Power
the specified comment date for the 385.2001 (a)(1)(iii) and the instructions Act, 16 U.S.C. 791(a)–825(r).
particular application. A competing on the Commission’s Web site under ‘‘e- h. Applicant Contacts: Mr. Steven
preliminary permit application must filing’’ link. The Commission strongly Klein, General Manager, P.O. Box 1107,
conform with 18 CFR 4.30(b) and 4.36. encourages electronic filing. 2320 California Street, Everett, WA
o. Competing Development s. Filing and Service of Responsive 98206, (425) 783–8473.
Application: Any qualified development Documents: Any filings must bear in all i. FERC Contact: Chris Yeakel, (202)
applicant desiring to file a competing capital letter the title ‘‘COMMENTS’’, 502–8132.
development application must submit to ‘‘RECOMMENDATIONS FOR TERMS j. Deadline for filing comments,
the Commission, on or before a AND CONDITIONS’’, ‘‘PROTEST’’, protests, and motions to intervene: 60
specified comment date for the ‘‘MOTION TO INTERVENE’’, ‘‘NOTICE days from the issuance date of this
particular application, either a OF INTENT’’, or ‘‘COMPETING notice.
competing development application or a APPLICATION’’, as applicable, and the The Commission’s Rules of Practice
notice of intent to file such an Project Number of the particular and Procedure require all intervenors
application. Submission of a timely application to which the filing refers. filing documents with the Commission
notice of intent to file a development Any of the above-named documents to serve a copy of that document on
application allows an interested person must be filed by providing the original each person in the official service list
to file the competing application no and the number of copies provided by for the project. Further, if an intervenor
later than 120 days after the specified the Commission’s regulations to: The files comments or documents with the
comment date for the particular Secretary, Federal Energy Regulatory Commission relating to the merits of an
application. A competing license Commission, 888 First Street, NE., issue that may affect the responsibilities
application must conform with 18 CFR Washington, DC 20426. A copy of any of a particular resource agency, they
4.30(b) and 4.36. motion to intervene must also be served must also serve a copy of the document
p. Notice of Intent: A notice of intent upon each representative of the on that resource agency.
must specify the exact name, business Applicant specified in the particular k. Description of Project: The
address, and telephone number of the application. proposed project would consist of: (1)
prospective applicant, and must include t. Agency Comments: Federal, state, 166 Tidal In Stream Energy Conversion
an unequivocal statement of intent to and local agencies are invited to file (TISEC) devices consisting of, (2)
submit, if such an application may be comments on the described application. rotating propeller blades 10 meters in
filed, either a preliminary permit A copy of the application may be diameter, (3) integrated generators with
application or a development obtained by agencies directly from the a capacity of 66 kW, (4) anchoring
application (specify which type of applicant. If an agency does not file systems, (5) mooring lines, and (6)
application). A notice of intent must be comments within the time specified for interconnection transmission lines. The
served on the applicant(s) named in this filing comments, it will be presumed to project is estimated to have an annual
public notice. have no comments. One copy of an generation of 28.5 gigawatt-hours per-
q. Proposed Scope of Studies under agency’s comments must also be sent to year, which would be distributed by the
Permit: A preliminary permit, if issued, Snohomish County Public Utility
sroberts on PROD1PC70 with NOTICES

the Applicant’s representatives.


does not authorize construction. The District.
term of the proposed preliminary permit Magalie R. Salas, l. Locations of Applications: A copy of
would be 36 months. The work Secretary. the application is available for
proposed under the preliminary permit [FR Doc. E6–10803 Filed 7–10–06; 8:45 am] inspection and reproduction at the
would include economic analysis, BILLING CODE 6717–01–P Commission in the Public Reference

VerDate Aug<31>2005 16:49 Jul 10, 2006 Jkt 208001 PO 00000 Frm 00043 Fmt 4703 Sfmt 4703 E:\FR\FM\11JYN1.SGM 11JYN1