You are on page 1of 2

Federal Register / Vol. 71, No.

128 / Wednesday, July 5, 2006 / Notices 38207

DEPARTMENT OF TRANSPORTATION in this proposal. A series of public 15/U.S. 395 interchange to Farmington
meetings and a public hearing will be Road. The proposed U.S. 395
Federal Highway Administration held. The Draft EIS will be available for Realignment Freeway/Expressway
public and agencies review and corridor to be evaluated is located either
Environmental Impact Statement; comments prior to the public hearing. on existing U.S. 395 or west of existing
Cobb, Fulton, and DeKalb Counties, To ensure that the full range of issues U.S. 395, through the cities of Oak Hills,
Georgia related to this proposed project is Hesperia, Victorville, Adelanto and
AGENCY: Federal Highway addressed and all significant issues are incorporated areas of San Bernardino
Administration (FHWA), DOT. identified, formal scoping will be County. The entire proposed project
ACTION: Notice of Intent. initiated. In addition, we invite all length is approximately 45.0 miles long.
interested parties to submit comments A preferred alternative has not been
SUMMARY: The FHWA is issuing this and suggestions. Comments or questions selected at this point. All build
notice to advise the public that an concerning this proposed action should alternatives begin at the I–15 U.S. 395
Environmental Impact Statement (EIS) be directed to the FHWA at the address interchange and would extend to
will be prepared for a proposed provided above. Farmington Road.
combined highway and transit project The viable alternatives in the
(Catalog of Federal Domestic Assistance
on I–285 in Cobb, Fulton, and DeKalb Program Number 20.205, Highway Research,
environmental analysis consist of an
Counties, Georgia. Planning and Construction. The regulations existing alignment and two
FOR FURTHER INFORMATION CONTACT: Mr. implementing Executive Order 12372 realignments upgrading U.S. 395 from a
Wayne Fedora, P.E., Urban regarding intergovernmental consultation on two-lane highway to a six-lane freeway/
Transportation Engineer, FHWA, 61 Federal programs and activities apply to this four-lane expressway configuration. The
Forsyth Street, SW., Suite 17T100, program. Georgia’s approved clearinghouse six-lane freeway portion of the proposed
Atlanta, Georgia 30303, Telephone: review procedures apply to this program.) existing alignment/realignments would
(404) 562–3651; Mrs. Myra R. Immings, Issued On: June 29, 2006. start at the I–15/U.S. 395 junction and
Community Planner, Federal Transit Ghasson Shanine, ends at Purple Sage Street. The
Administration, 61 Forsyth Street, SW., Transportation Administrator, FHWA,
expressway portion for the proposed
Suite 17T50, Atlanta, Georgia 30303, Atlanta, Georgia. action would continue from Purple Sage
Telephone (404) 562–3508; Mr. Harvey [FR Doc. 06–5974 Filed 7–3–06; 8:45 am]
Street to Farmington Road. The build
Keepler, State Environmental/Location alternatives will include construction of
BILLING CODE 4910–22–M
Engineer, Georgia Department of new interchanges. For consideration in
Transportation, 3993 Aviation Circle, the EIS, the following four alternatives
Atlanta, Georgia 30336, Telephone: DEPARTMENT OF TRANSPORTATION will be analyzed:
(404) 699–4401; or Mr. Marvin • Alternate A: No Build. This
Woodward, Director of Projects and Federal Highway Administration Alternative consists of no change to
Planning, Georgia Regional existing facilities along the proposed
Transportation Authority, 245 Peachtree Environmental Impact Statement; San project portion of the U.S. 395 corridor.
Bernardino County, CA • Alternative D: Existing Alignment.
Center Avenue, NE., Suite 900, Atlanta,
The Existing Alignment Alternative
Georgia 30303, Telephone: (404) 463– AGENCY: Federal Highway follows the existing alignment or a
3099. Administration (FHWA), DOT. slightly offset alignment throughout the
SUPPLEMENTARY INFORMATION: The ACTION: Notice of intent. project limits.
FHWA, in cooperation with the Federal • Alternative F: Realignment West of
Transit Administration (FTA), Georgia SUMMARY: The FHWA is issuing this Existing Corridor. This Alternative
Department of Transportation, and the notice to advise the public of its intent proposes to realign the corridor from the
Georgia Regional Transportation to prepare an Environmental Impact I–15/U.S. 395 interchange to
Authority, will prepare an EIS on a Statement (EIS) for the proposed U.S. Farmington Road. This realignment
combined highway and transit proposal 395 Realignment Freeway/Expressway heads northwest in the vicinity of the
along I–285 from I–75 in Cobb County project on U.S. 395 from the Interstate Oak Hills Community and the Union
to I–85 in DeKalb County, a length of 15 (I–15)/U.S. 395 interchange to Pacific Railroad, and then continues in
approximately 17 miles. Alternatives Farmington Road. Part of the a northerly direction just west of
under consideration include (1) No realignment would go through the cities Caughlin Road within San Bernardino
Action or No-Build, (2) transportation of Oak Hills, Hesperia, Victorville, County limits and traversing the
systems management (TSM), (3) using Adelanto and incorporated areas of San western portions of the City of
alternate modes, and (4) various Bernardino County, California. Adelanto, where it converges back to
highway and transit build alternatives FOR FURTHER INFORMATION CONTACT: Tay paralleling the existing U.S. 395
including high occupancy vehicle Dam, Senior Project Development alignment for the remainder of the
(HOV) lanes, bus rapid transit (BRT), Engineer, Federal Highway project limits.
truck only lanes, auxiliary lanes, Administration, 888 South Figueroa, • Alternative G: Realignment West of
collector-distributor lanes, and Suite 1850, Los Angeles, CA, 90017. Existing Corridor along Oro Grande
interchange improvements along I–285, Telephone: (213) 202–3954. Boniface Wash. This alternative consists of a
as well as various improvements on Udotor, California Department of realignment detaching from existing the
adjacent and intersecting routes along Transportation District 8, 464 W. Fourth I–15/U.S. 395 interchange, where
the corridor. Street, San Bernardino, CA 92401. immediately crosses the Union Pacific
Letters describing the proposed action Telephone: (909) 383–1387. Railroad within the first 11⁄2 miles
rwilkins on PROD1PC63 with NOTICES

and soliciting comments will be sent to SUPPLEMENTARY INFORMATION: The heading northeast along the Oro Grande
appropriate Federal, State, and local FHWA, in cooperation with the Wash. the realignment continues
agencies and to private organizations California Department of northeasterly throughout the western
and citizens who have previously Transportation, District 8, will prepare portions of the Cities of Hesperia and
expressed or are known to have interest an EIS to realign U.S. 395 from the I– Victorville and follows in a northerly

VerDate Aug<31>2005 19:34 Jul 03, 2006 Jkt 205001 PO 00000 Frm 00080 Fmt 4703 Sfmt 4703 E:\FR\FM\05JYN1.SGM 05JYN1
38208 Federal Register / Vol. 71, No. 128 / Wednesday, July 5, 2006 / Notices

direction just west of Cuaghlin Road DEPARTMENT OF TRANSPORTATION Class III rail carrier, has filed a verified
within San Bernardino County limits notice of exemption under 49 CFR
and traversing the western portions of Surface Transportation Board 1150.41 to acquire from Dickinson
the City of Adelanto where it converges [STB Finance Docket No. 34895] Osceola Railroad Association (DORA)
back to paralleling the existing U.S. 395 approximately 37.30 miles of rail line in
alignment for the remainder of the Knoxville and Holston River Railroad Osceola and Dickinson Counties,
project limits. Company, Inc.—Lease and Operation extending from milepost 215.00 at a
Exemption—CSX Transportation, Inc. point west of Superior, IA, to milepost
The alternatives described above will 252.30 at a point west of Allendorf, IA.1
be further refined through efforts Knoxville and Holston River Railroad GRC certifies that its projected annual
conducted under the National Company, Inc. (KHR), a Class III rail revenues as a result of this transaction
Environmental Policy Act (40 CFR parts carrier, has filed a verified notice of will not result in the creation of a Class
1500–1508, and 23 CFR part 771), the exemption under 49 CFR 1150.41 to I or Class II rail carrier, and further
1990 Clear Air Act Amendments, lease and operate approximately 1.9 certifies that its projected annual
section 404 of the Clean Water Act, miles of rail line owned by CSX revenues will not exceed $5 million.
Executive Order 12898 regarding Transportation, Inc. The line runs from By decision served on May 25, 2006,
environmental justice, the National Third Creek Spur in Knoxville, TN, at the Board’s Chairman issued a
Historic Preservation Act, the approximately V.S. 1+50, to the end of ‘‘housekeeping’’ stay of the effective
Endangered Species Act, the section 4(f) the line at approximately V.S. 101+68. date of the notice of exemption in this
KHR certifies that its projected proceeding to permit full consideration
of the U.S. Department of
revenues as a result of the transaction of the issues presented in a petition
Transportation Act, and other Federal
will not result in the creation of a Class filed by DORA and Iowa Central
environmental protection laws, II or Class I rail carrier, and further Railroad Company to reject or revoke
regulations, policies, and executive certifies that its projected annual the exemption or to stay its
orders. The EIS will incorporate revenues will not exceed $5 million. effectiveness.2 This notice is subject to
comments from the public scoping The transaction was scheduled to be the housekeeping stay and cannot take
process as well as analysis in technical consummated on or after June 23, 2006. effect until further order of the Board.
studies. Other alternatives suggested If the notice contains false or misleading If the notice contains false or
during scoping process would be information, the exemption is void ab misleading information, the exemption
considered during the development of initio. Petitions to revoke the exemption is void ab initio. Petitions to revoke the
the EIS. The EIS will consider any under 49 U.S.C. 10502(d) may be filed exemption under 49 U.S.C. 10502(d)
additional reasonable alternatives at any time. The filing of a petition to may be filed at any time. The filing of
identified during scoping process. revoke will not automatically stay the a petition to revoke will not
Letters describing the proposed action transaction. automatically stay the transaction.
and soliciting comments will be sent to An original and 10 copies of all An original and 10 copies of all
appropriate Federal, State, regional and pleadings, referring to STB Finance pleadings, referring to STB Finance
local agencies, and to private Docket No. 34895, must be filed with Docket No. 34867, must be filed with
organizations and citizens who the Surface Transportation Board, 1925 the Surface Transportation Board, 1925
previously have expressed, or are K Street, NW., Washington, DC 20423– K Street, NW., Washington, DC 20423–
known to have, an interest in this 0001. In addition, one copy of each 0001. In addition, one copy of each
pleading must be served on Rose- pleading must be served on Edward J.
project. Location and details of the
Michele Nardi, Esq., Weiner Brodsky Fishman, Kirkpatrick & Lockhart
public scoping meeting for the proposed
Sidman Kider PC, 1300 19th Street, 5th Nicholson Graham LLP, 1601 K Street,
project will be advertised in local NW., Washington, DC 20006.
Floor, Washington, DC 20036.
newspapers and other media and will be Board decisions and notices are Board decisions and notices are
hosted by the California Department of available on our Web site at http:// available on our Web site at http://
Transportation, District 8. www.stb.dot.gov. www.stb.dot.gov.
(Catalog of Federal Domestic Assistance Decided: June 26, 2006. Decided: June 27, 2006.
Program Number 20.205, Highway Research, By the Board, David M. Konschnik, By the Board, David M. Konschnik,
Planning and Construction. The regulations Director, Office of Proceedings. Director, Office of Proceedings.
implementing Executive Order 12372 Vernon A. Williams, Vernon A. Williams,
regarding intergovernmental consultation Secretary. Secretary.
Federal programs and activities apply to this
[FR Doc. 06–5913 Filed 7–3–06; 8:45 am] [FR Doc. E6–10432 Filed 7–3–06; 8:45 am]
program)
BILLING CODE 4915–01–P BILLING CODE 4915–01–P
Dated: June 27, 2006.
1 Due to an inadvertent oversight, GRC states that
Gene K. Fong,
DEPARTMENT OF TRANSPORTATION it obtained Board authority to operate the subject
Division Administrator, California Division, line in 2001 but did not obtain authority to acquire
Federal Highway Administration. it. GRC filed this notice of exemption to correct the
Surface Transportation Board error. See General Railway Corporation d/b/a Iowa
[FR Doc. 06–5987 Filed 7–3–06; 8:45 am]
Northwestern Railroad Corporation—Operation
BILLING CODE 4910–22–M
[STB Finance Docket No. 34867] Exemption—Line of Dickinson Osceola Railroad
Association, STB Finance Docket No. 34037 (STB
General Railway Corporation, d/b/a served and published May 11, 2001).
Iowa Northwestern Railroad— 2 See General Railway Corporation, d/b/a Iowa
rwilkins on PROD1PC63 with NOTICES

Exemption for Acquisition of Railroad Northwestern Railroad—Exemption for Acquisition


of Railroad Line—In Osceola and Dickinson
Line—In Osceola and Dickinson Counties, IA, STB Finance Docket No. 34867 (STB
Counties, IA served May 25, 2006). In this decision, the
Chairman also directed GRC to file an amended
General Railway Corporation (GRC), notice of exemption under 49 CFR 1150.41. This
d/b/a Iowa Northwestern Railroad, a notice was filed pursuant to that directive.

VerDate Aug<31>2005 19:34 Jul 03, 2006 Jkt 205001 PO 00000 Frm 00081 Fmt 4703 Sfmt 4703 E:\FR\FM\05JYN1.SGM 05JYN1