You are on page 1of 2

26956 Federal Register / Vol. 71, No.

89 / Tuesday, May 9, 2006 / Notices

issue that may affect the responsibilities to file the competing application no provided by the Commission’s
of a particular resource agency, they later than 120 days after the specified regulations to: The Secretary, Federal
must also serve a copy of the document comment date for the particular Energy Regulatory Commission, 888
on that resource agency. application. A competing license First Street, NE., Washington, DC 20426.
k. Description of Project: The application must conform with 18 CFR A copy of any motion to intervene must
proposed project would consist of: (1) 4.30(b) and 4.36. also be served upon each representative
50 to 150 Tidal In Stream Energy p. Notice of Intent—A notice of intent of the Applicant specified in the
Conversion (TISEC) devices consisting must specify the exact name, business particular application.
of, (2) rotating propeller blades, (3) address, and telephone number of the t. Agency Comments—Federal, state,
integrated generators with a capacity of prospective applicant, and must include and local agencies are invited to file
0.5 to 2.0 MW, (4) anchoring systems, an unequivocal statement of intent to comments on the described application.
(5) mooring lines, and (6) submit, if such an application may be A copy of the application may be
interconnection transmission lines. The filed, either a preliminary permit obtained by agencies directly from the
project is estimated to have an annual application or a development Applicant. If an agency does not file
generation of 8.76 gigawatt-hours per- application (specify which type of comments within the time specified for
unit per-year, which would be sold to a application). A notice of intent must be filing comments, it will be presumed to
local utility. served on the applicant(s) named in this have no comments. One copy of an
l. Locations of Applications: A copy public notice. agency’s comments must also be sent to
of the application is available for q. Proposed Scope of Studies under the Applicant’s representatives.
inspection and reproduction at the Permit—A preliminary permit, if issued,
Commission in the Public Reference does not authorize construction. The Magalie R. Salas,
Room, located at 888 First Street, NE., term of the proposed preliminary permit Secretary.
Room 2A, Washington, DC 20426, or by would be 36 months. The work [FR Doc. E6–6948 Filed 5–8–06; 8:45 am]
calling (202) 502–8371. This filing may proposed under the preliminary permit BILLING CODE 6717–01–P
also be viewed on the Commission’s would include economic analysis,
Web site at http://www.ferc.gov using preparation of preliminary engineering
the ‘‘eLibrary’’ link. Enter the docket plans, and a study of environmental DEPARTMENT OF ENERGY
number excluding the last three digits in impacts. Based on the results of these
the docket number field to access the studies, the Applicant would decide Federal Energy Regulatory
document. For assistance, call toll-free whether to proceed with the preparation Commission
1–866–208–3676 or e-mail of a development application to
FERCOnlineSupport@ferc.gov. For TTY, construct and operate the project. Notice of Application Accepted for
call (202) 502–8659. A copy is also r. Comments, Protests, or Motions to Filing and Soliciting Motions To
available for inspection and Intervene—Anyone may submit Intervene, Protests, and Comments
reproduction at the address in item h comments, a protest, or a motion to May 2, 2006.
above. intervene in accordance with the Take notice that the following
m. Individuals desiring to be included requirements of Rules of Practice and hydroelectric application has been filed
on the Commission’s mailing list should Procedure, 18 CFR 385.210, .211, .214. with the Commission and is available
so indicate by writing to the Secretary In determining the appropriate action to for public inspection:
of the Commission. take, the Commission will consider all a. Type of Application: Preliminary
n. Competing Preliminary Permit — protests or other comments filed, but Permit.
Anyone desiring to file a competing only those who file a motion to b. Project No.: 12666–000.
application for preliminary permit for a intervene in accordance with the c. Date filed: March 27, 2006.
proposed project must submit the Commission’s Rules may become a d. Applicant: Maine Tidal Energy
competing application itself, or a notice party to the proceeding. Any comments, Company.
of intent to file such an application, to protests, or motions to intervene must e. Name of Project: Kennebec Tidal
the Commission on or before the be received on or before the specified Energy Hydroelectric Project .
specified comment date for the comment date for the particular f. Location: The project would be
particular application (see 18 CFR 4.36). application. located in the Kennebec River between
Submission of a timely notice of intent Comments, protests and interventions Chops Point and West Chops Point, in
allows an interested person to file the may be filed electronically via the Sagadahoc County, Maine.
competing preliminary permit Internet in lieu of paper; See 18 C.F.R. g. Filed Pursuant to: Federal Power
application no later than 30 days after 385.2001(a)(1)(iii) and the instructions Act, 16 U.S.C. 791(a)–825(r)
the specified comment date for the on the Commission’s Web site under ‘‘e- h. Applicant Contacts: Joseph A.
particular application. A competing filing’’ link. The Commission strongly Cannon, Pillsbury Winthrop Shaw
preliminary permit application must encourages electronic filing. Pittman LLP, 2300 N Street, NW.,
conform with 18 CFR 4.30(b) and 4.36. s. Filing and Service of Responsive Washington, DC 20037, phone: (202)–
o. Competing Development Documents—Any filings must bear in 663–8000, and Charles B. Cooper, TRC
Application—Any qualified all capital letters the title Environmental, Boott Mills South, 116
development applicant desiring to file a ‘‘COMMENTS’’, John St., Lowell, MA 01852, phone:
competing development application ‘‘RECOMMENDATIONS FOR TERMS (978)-656–3567.
must submit to the Commission, on or AND CONDITIONS’’, ‘‘PROTEST’’, i. FERC Contact: Chris Yeakel, (202)
before a specified comment date for the ‘‘COMPETING APPLICATION’’ or 502–8132.
mstockstill on PROD1PC68 with NOTICES

particular application, either a ‘‘MOTION TO INTERVENE’’, as j. Deadline for filing comments,


competing development application or a applicable, and the Project Number of protests, and motions to intervene: 60
notice of intent to file such an the particular application to which the days from the issuance date of this
application. Submission of a timely filing refers. Any of the above-named notice.
notice of intent to file a development documents must be filed by providing The Commission’s Rules of Practice
application allows an interested person the original and the number of copies and Procedure require all intervenors

VerDate Aug<31>2005 15:42 May 08, 2006 Jkt 208001 PO 00000 Frm 00037 Fmt 4703 Sfmt 4703 E:\FR\FM\09MYN1.SGM 09MYN1
Federal Register / Vol. 71, No. 89 / Tuesday, May 9, 2006 / Notices 26957

filing documents with the Commission competing development application or a applicable, and the Project Number of
to serve a copy of that document on notice of intent to file such an the particular application to which the
each person in the official service list application. Submission of a timely filing refers. Any of the above-named
for the project. Further, if an intervenor notice of intent to file a development documents must be filed by providing
files comments or documents with the application allows an interested person the original and the number of copies
Commission relating to the merits of an to file the competing application no provided by the Commission’s
issue that may affect the responsibilities later than 120 days after the specified regulations to: The Secretary, Federal
of a particular resource agency, they comment date for the particular Energy Regulatory Commission, 888
must also serve a copy of the document application. A competing license First Street, NE., Washington, DC 20426.
on that resource agency. application must conform with 18 CFR A copy of any motion to intervene must
k. Description of Project: The 4.30(b) and 4.36. also be served upon each representative
proposed project would consist of: (1) p. Notice of Intent—A notice of intent of the Applicant specified in the
50 Tidal In Stream Energy Conversion must specify the exact name, business particular application.
(TISEC) devices consisting of, (2) address, and telephone number of the t. Agency Comments—Federal, state,
rotating propeller blades, (3) integrated prospective applicant, and must include and local agencies are invited to file
generators with a capacity of 0.5 to 2.0 an unequivocal statement of intent to comments on the described application.
MW, (4) anchoring systems, (5) mooring submit, if such an application may be A copy of the application may be
lines; and (6) interconnection filed, either a preliminary permit obtained by agencies directly from the
transmission lines. The project is application or a development Applicant. If an agency does not file
estimated to have an annual generation application (specify which type of comments within the time specified for
of 8.76 gigawatt-hours per-unit per-year, application). A notice of intent must be filing comments, it will be presumed to
which would be sold to a local utility. served on the applicant(s) named in this have no comments. One copy of an
l. Locations of Applications: A copy of public notice. agency’s comments must also be sent to
the application is available for q. Proposed Scope of Studies under the Applicant’s representatives.
inspection and reproduction at the Permit—A preliminary permit, if issued,
Commission in the Public Reference does not authorize construction. The Magalie R. Salas,
Room, located at 888 First Street NE., term of the proposed preliminary permit Secretary.
Room 2A, Washington DC 20426, or by would be 36 months. The work [FR Doc. E6–6949 Filed 5–8–06; 8:45 am]
calling (202) 502–8371. This filing may proposed under the preliminary permit BILLING CODE 6717–01–P
also be viewed on the Commission’s would include economic analysis,
website at http://www.ferc.gov using the preparation of preliminary engineering
‘‘eLibrary’’ link. Enter the docket plans, and a study of environmental DEPARTMENT OF ENERGY
number excluding the last three digits in impacts. Based on the results of these
the docket number field to access the studies, the Applicant would decide Federal Energy Regulatory
document. For assistance, call toll-free whether to proceed with the preparation Commission
1–866–208–3676 or e-mail of a development application to [Docket No. RP96–312–156]
FERCOnlineSupport@ferc.gov. For TTY, construct and operate the project.
call (202) 502–8659. A copy is also r. Comments, Protests, or Motions to Tennessee Gas Pipeline Company;
available for inspection and Intervene—Anyone may submit Notice of Negotiated Rate Filing
reproduction at the address in item h comments, a protest, or a motion to
above. intervene in accordance with the May 2, 2006.
m. Individuals desiring to be included requirements of Rules of Practice and Take notice that on April 28, 2006,
on the Commission’s mailing list should Procedure, 18 CFR 385.210, .211, .214. Tennessee Gas Pipeline Company
so indicate by writing to the Secretary In determining the appropriate action to (Tennessee) tendered for filing
of the Commission. take, the Commission will consider all Negotiated Rate Arrangement.
n. Competing Preliminary Permit— protests or other comments filed, but Tennessee states that the filed
Anyone desiring to file a competing only those who file a motion to Negotiated Rate Arrangement reflects an
application for preliminary permit for a intervene in accordance with the agreement between Tennessee and
proposed project must submit the Commission’s Rules may become a Public Service Electric and Gas
competing application itself, or a notice party to the proceeding. Any comments, Company (PSE&G) for transportation
of intent to file such an application, to protests, or motions to intervene must under Rate Schedule FT–A pursuant to
the Commission on or before the be received on or before the specified Tennessee’s Northeast ConneXion NY/
specified comment date for the comment date for the particular NJ Project. Tennessee requests that the
particular application (see 18 CFR 4.36). application. Commission accept and approve the
Submission of a timely notice of intent Comments, protests and interventions Negotiated Rate Arrangement to be
allows an interested person to file the may be filed electronically via the effective on the commencement date of
competing preliminary permit Internet in lieu of paper; See 18 CFR the FT–A Agreement.
application no later than 30 days after 385.2001(a)(1)(iii) and the instructions Any person desiring to intervene or to
the specified comment date for the on the Commission’s web site under ‘‘e- protest this filing must file in
particular application. A competing filing’’ link. The Commission strongly accordance with Rules 211 and 214 of
preliminary permit application must encourages electronic filing. the Commission’s Rules of Practice and
conform with 18 CFR 4.30(b) and 4.36. s. Filing and Service of Responsive Procedure (18 CFR 385.211 and
o. Competing Development Documents—Any filings must bear in 385.214). Protests will be considered by
mstockstill on PROD1PC68 with NOTICES

Application—Any qualified all capital letters the title the Commission in determining the
development applicant desiring to file a ‘‘COMMENTS’’, appropriate action to be taken, but will
competing development application ‘‘RECOMMENDATIONS FOR TERMS not serve to make protestants parties to
must submit to the Commission, on or AND CONDITIONS’’, ‘‘PROTEST’’, the proceeding. Any person wishing to
before a specified comment date for the ‘‘COMPETING APPLICATION’’ or become a party must file a notice of
particular application, either a ‘‘MOTION TO INTERVENE’’, as intervention or motion to intervene, as

VerDate Aug<31>2005 15:42 May 08, 2006 Jkt 208001 PO 00000 Frm 00038 Fmt 4703 Sfmt 4703 E:\FR\FM\09MYN1.SGM 09MYN1