26498 Federal Register / Vol. 71, No.

87 / Friday, May 5, 2006 / Notices

herbicides within the Wildland Urban as proposed because of potential megawatts {MW}) and Biglow Canyon
Interface, and impacts to late- impacts to water quality and the lack of Wind Farm (400 megawatts {MW})
successional forest species, and comprehensive information regarding Intragration Project, Construction and
recommended consideration of the incorporation of drainage management Operation of a Double-Circut 230-
alternatives that eliminate group plans. EPA requested the contract Kilovolt (kV) Transmission, Sherman
selection harvests in watersheds that renewals not be finalized until after the County, OR,
exceed the Threshold of Concern for Record of Decision for the Drainage Re- Comment Period Ends: 06/19/2006,
cumulative watershed effects. evaluation Plan is completed. Contact: Gene Lynard 503–230–3790.
Rating EC2. Rating EO2. EIS No. 20060161, Draft EIS, BLM, AK,
EIS No. 20060067, ERP No. D–GSA–
Final EISs Kobuk-Seward Pennsula Resource
K80046–CA, Los Angeles Federal
Management Plan, from Point Lay to
Bureau of Investigation (FBI) Federal EIS No. 20060094, ERP No. F–AFS–
the North Sound and from the Bering
Building, Consolidation of FBI Field F65053–IN, Hoosier National Forest
and Chuckchi Ses east to the Kobuk
Office Headquarters and 11 other Land and Resource Management Plan,
River, AK,
Satellite Offices, Federal Central Implementation, Brown, Crawford,
District, Los Angeles, CA. Dubois, Jackson, Lawrence, Martin, Comment Period Ends: 08/04/2006,
SUMMARY: EPA expressed Orange, Perry Counties, IN. Contact: Jeanie Cole 907–474–2340.
environmental concerns about traffic Summary: The final EIS addressed EIS No. 20060162, Draft EIS, FHW, 00,
related air quality impacts, and EPA’s environmental concerns; TIER 1—DEIS Trans-Texas Corridor—
requested that other alternatives that therefore, EPA does not object to the 35 (TTC–35) System, Improvement to
could avoid or reduce those impacts be proposed action. International, Interstate and Intrastate
evaluated. Movement of Goods and People,
EIS No. 20060103, ERP No. F–BLM–
Rating EC2. Oklakoma-Mexico/Gulf Coast
EIS No. 20060068, ERP No. D–AFS– L65488–ID, Cotterel Wind Power
Element,
L61131–ID, Emerald Creek Garnet Project and Draft Resource
Management Plan Amendment, To Comment Period Ends: 06/19/2006,
Area, To Provide a Public Contact: Salvador Decampo 512–536–
Recreational Area for Collecting Build a 190–240 megawatt, Wind-
Powered Electrical Generation 5950.
Garnet Gemstone, US Army COE EIS No. 20060163, Third Draft
Section 404 Permit, Idaho Panhandle Facility, Right-of-Way Application,
City of Burley, Towns of Albion and Supplement, COE, CA, American
National Forest, St. Joe Ranger River Watershed Project, Post
District, Latah County, ID Malta, Cassia County, ID
Authorization Decision Document,
Summary: EPA supports the goal of Summary: The final EIS addresses Folsom Dam Raise, Folsom Bridge
reducing impacts to water resources; EPA’s request for information; therefore, Project, Propose to Construct a
however, EPA expressed environmental EPA does not object to the proposed Permanent Bridge and Roadway
concerns about impacts to water quality action. across the American River, City of
and restoring 303 (d) listed streams; the Dated: May 5, 2006. Folsom, Sacramento County, CA,
final EIS should augment information Robert W. Hargrove, Comment Period Ends: 06/21/2006,
on impacts to wetland communities. Director, NEPA Compliance Division, Office Contact: Jane Rinck 916–557–6715.
Rating EC2. of Federal Activities. EIS No. 20060164, Draft EIS, AFS, 00,
EIS No. 20060071, ERP No. D–AFS– [FR Doc. E6–6861 Filed 5–4–06; 8:45 am] Dakota Prairie Grasslands Noxious
G65100–NM, Santa Fe National Forest BILLING CODE 6560–50–P Weed Management Project,
Plan Amendment for Oil & Gas
Implementation, Billings, Slope,
Leasing and Roads Management,
Golden Valley, Sioux, Grant,
Implementation, San Juan Basin, Cuba ENVIRONMENTAL PROTECTION McHenry, Ransom and Richland
Ranger District, NM. AGENCY Counties, ND and Corson, Perkins,
Summary: EPA does not object to the and Ziebach Counties, SD,
[ER–FRL–6674–8]
preferred alternative as described in the
DEIS. Comment Period Ends: 06/19/2006,
Environmental Impacts Statements; Contact: Brenda Quale 701–250–4443.
Rating LO. Notice of Availability
EIS No. 20060074, ERP No. D–AFS– EIS No. 20060165, Draft EIS, NPS, CO,
K65300–AZ, Deep Lake Allotment Responsible Agency: Office of Federal Rocky Mountain National Park, Elk
Project, Proposes to Re-authorize Activities, General Information (202) and Vegetation Management Plan,
Grazing, Mormon Lake Ranger 564–7167 or http://www.epa.gov/ Implementation, Grand and Larimer
District, Coconino National District, compliance/nepa/. Counties, CO,
Coconino County, AZ Weekly receipt of Environmental Comment Period Ends: 07/04/2006,
Summary: EPA does not object to the Impact Statements Filed 04/24/2006 Contact: Vaughn Baker 970–586–1206.
proposed alternative. Through 04/28/2006. Pursuant to 40 EIS No. 20060166, Final Supplement,
Rating LO. CFR 1506.9. AFS, ID, Mission Brush Project,
EIS No. 20060056, ERP No. DS–IBR– EIS No. 20060159, Final EIS, NPS, AK, Additional Information, Proposes
K39095–CA, Central Valley Project, Denali National Park and Preserve, Vegetation, Wildlife Habitat,
West San Joaquin Division, Draft South Denali Implementation Recreation and Aquatic Improvement
Additional Information, San Luis Unit Plan, Matanuska-Susitna Borough, Treatments, Idaho Panhandle
Long-Term Water Service Contract AK, National Forests, Bonners Ferry
cchase on PROD1PC60 with NOTICES

Renewal, Cities of Avenal, Coalinga Wait Period Ends: 06/05/2006, Ranger District, Bounty County, ID,
and Huron, Fresno, King and Merced Contact: Miriam Valentine 907–733– Wait Period Ends: 06/05/2006,
Counties, CA 9102. Contact: Doug Nishek 208–267–5561.
Summary: EPA expressed EIS No. 20060160, Draft EIS, BPA, OR, EIS No. 20060167, Draft EIS, FHW, IL,
environmental objections to the project Klondike III Wind Project (300 Illinois Route 29 (FAP 318) Corridor

VerDate Aug<31>2005 18:48 May 04, 2006 Jkt 208001 PO 00000 Frm 00050 Fmt 4703 Sfmt 4703 E:\FR\FM\05MYN1.SGM 05MYN1
Federal Register / Vol. 71, No. 87 / Friday, May 5, 2006 / Notices 26499

Study, Transportation Improvement SUMMARY: In accordance with section Dated: April 19, 2006.
from Illinois 6 to Interstate 180, 122(i) of the Comprehensive Susan Studlien,
Funding and US Army COE Section Environmental Response, Director, Office of Site Remediation and
404 Permit, Peoria, Marshall, Putnam Compensation, and Liability Act, as Restoration.
and Bureau Counties, IL, amended (‘‘CERCLA’’), 42 U.S.C. [FR Doc. E6–6862 Filed 5–4–06; 8:45 am]
Comment Period Ends: 06/23/2006, 9622(i), notice is hereby given of a BILLING CODE 6560–50–P
Contact: Matt Fuller 217–492–4625. proposed administrative settlement for
EIS No. 20060168, Final EIS, FRC, 00, recovery of past response costs
Cove Point Expansion Project, concerning the Estate of Evelyn Porter EXPORT-IMPORT BANK
Construction and Operation of a Superfund site in Foxborough,
[Public Notice 86]
Liquefied Natural Gas (LNG) Import Massachusetts with the following
Terminal Expansion and Natural Gas settling party: the Estate of Evelyn Agency Information Collection
Pipeline Facilities, U.S. Army COE Porter. The settlement requires the Activities: Submission for OMB
Section 404 Permit, Docket Nos. settling party to pay 100% of the Net Review; Comment Request
CPO5–130–000, CP05–131–000 and Liquid Assets of the Estate of Evelyn
CP05–132–00, PA, VA, WV, NY and Porter and 100% of the Net Sales Export-Import Bank of the U.S.
AGENCY:
MD, Proceeds from the sale of the Property Notice and request for
ACTION:
Wait Period Ends: 06/05/2006, to the Hazardous Substance Superfund. comments.
Contact: Todd Sedmak 1–866–208– The settlement includes a covenant not SUMMARY: The Export-Import Bank, as a
3372. to sue the settling parties pursuant to part of its continuing effort to reduce
EIS No. 20060169, Final EIS, FRC, 00, sections 106 and 107(a) of CERCLA, 42 paperwork and respondent burden,
Crown Landing Liquefied Natural Gas U.S.C. 9506 and 42 U.S.C. 9607(a). For invites the general public and other
Terminal, Construct and Operate in thirty (30) days following the date of Federal agencies to comment on the
Gloucester County, NJ and New Castle publication of this notice, the Agency proposed information collection, as
County, DE; and Logan Lateral will receive written comments relating required by the Paperwork Reduction
Project, Construct and Operate a New to the settlement. The Agency will Act of 1995. Our customers will be able
Natural Gas Pipeline and Ancillary consider all comments received and to submit this form on paper or
Facilities in Gloucester County, NJ may modify or withdraw its consent to electronically. The form has been
and Delaware, PA, the settlement if comments received updated in order to standardize the
Wait Period Ends: 06/05/2006, disclose facts or considerations which outline of this application to those used
Contact: Todd Sedmak 1–866–208–3372 indicate that the settlement is for medium-term insurance and
Amended Notices inappropriate, improper, or inadequate. guarantees and financial institution
The Agency’s response to any comments short-term single sale insurance. The
EIS No. 20060140, Final EIS, FHW, received will be available for public application also more explicitly states
KS, Withdrawn—Adoption—Kansas inspection at Superfund Reading Room, the financial information that is
Highway 10 (commonly Known as U.S. Environmental Protection Agency required to be submitted with the
South Lawrence Trafficway), Regional Office, located at One Congress application. This form mirrors the on-
Relocation, Issuance of U.S. Army COE Street, Suite 1100, Boston, line version of the application that Ex-
Section 404 Permit, Lawrence City, Massachusetts 02114. Im Bank is developing.
Douglas County, KS, DATES: Written comments should be
Wait Period Ends: 05/31/2006, DATES: Comments must be submitted on received on or before June 5, 2006 to be
Contact: Wendall L. Meyer 785–228– or before June 5, 2006. assured of consideration.
2544. ADDRESSES: The proposed settlement is ADDRESSES: Direct all comments to
Revision of FR Notice Published 04/ available for public inspection at the David Rostker, Office of Management
21/2006. Officially withdrawn by the Superfund Reading Room, U.S. and Budget, Office of Information and
Preparing Agency. Environmental Protection Agency Regulatory Affairs, NEOB, Room 10202,
Dated: May 2, 2006. Regional Office, located at One Congress Washington, DC 20503 (202) 395–3897.
Robert W. Hargrove, Street, Suite 1100, Boston, SUPPLEMENTARY INFORMATION:
Director, NEPA Compliance Division, Office Massachusetts 02114. Title and Form Number: Application
of Federal Activities. for Exporter Short-term Single-Buyer
FOR FURTHER INFORMATION CONTACT: A
[FR Doc. E6–6859 Filed 5–4–06; 8:45 am] Insurance, EIB 92–64
copy of the proposed Agreement and OMB Number: Presently part of OMB
BILLING CODE 6560–50–P
Covenant Not to Sue can be obtained #3048–0009 collection. Going forward
from Rona H. Gregory, Senior Assistant we would like this form to have its own
ENVIRONMENTAL PROTECTION Regional Counsel, U.S. Environmental OMB number.
AGENCY Protection Agency, Region I, One Type of Review: Regular.
Congress Street, Suite 1100, Mailcode Need and Use: The information
[FRL–8167–6] RAA, Boston, Massachusetts 02214, requested enables the applicant to
(617) 918–1096. Comments should provide Ex-Im Bank with the
Proposed CERCLA Administrative reference the Estate of Evelyn Porter information necessary to obtain
Cost Recovery Settlement; Estate of Superfund Site in Foxborough, legislatively required assurance of
Evelyn Porter Superfund Site Massachusetts, and EPA Docket No. 01– repayment and fulfills other statutory
cchase on PROD1PC60 with NOTICES

AGENCY: Environmental Protection 2006–0070 and should be addressed to requirements.


Agency (EPA). Regional Hearing Clerk, U.S. Affected Public: The form affects
Environmental Protection Agency, One entities involved in the export of U.S.
ACTION: Notice; request for public
Congress Street, Suite 1100, Boston, MA goods and services.
comment.
02114. Estimated Annual Respondents: 160.

VerDate Aug<31>2005 18:48 May 04, 2006 Jkt 208001 PO 00000 Frm 00051 Fmt 4703 Sfmt 4703 E:\FR\FM\05MYN1.SGM 05MYN1

You might also like