Professional Documents
Culture Documents
Fluorescence Spectrometer
(EDX-2)
Users Manual
Global Office of Lisun Electronics Inc.
http://www.Lisungroup.com
Lisun Group (Hong Kong) Limited
Add: Room C, 15/F Hua Chiao Commercial Center, 678 Nathan Road, Mongkok, Kowloon,
Hong Kong
Tel: 00852-68852050
Fax: 00852-30785638
Email: SalesHK@Lisungroup.com
Lisun Electronics (Shanghai) Co., Ltd
Add: Room 1210, No. 9 Building, Jiangqiao Wanda Plaza, Hexuan Road, Jiading District,
Shanghai, 201803, China
Tel: +86(21)5108 3341
Fax: +86(21)5108 3342
Email: SalesSH@Lisungroup.com
Sales@Lisungroup.com
www.Lisungroup.com
For the purpose of restricting the pollution caused by the dispose of electronic and electrical
products, the RoHS or Lead Free directive was announced by EU on Feb 13th of 2003 and
became effective on Jul 1st of 2007. Lisun Group developed an high accuracy EDXRF
spectrometer. The EDX-2 can fully meet the RoHS test requirements
-Page 1 -
Sales@Lisungroup.com
www.Lisungroup.com
Part 1 Specification:
Detect and analyze more than 75 chemical elements from Sulfur to Uranium, test Range:
2ppm~99.99%
Measure the details for the 5 restricted elements in RoHS Directive: Cd/Pb/Hg/Cr/Br)
Adopt world-famous electrical cooled detector, reliable and stable, energy resolving power
is less than 160eV
High definition camera built-in; USA made high pressure module built-in; Light
enhancement system
SNR design enhanced, quick test circuit and precise numbering system
The system includes a PC and printer which have already installed the English software
Part 2 Installation
2.1 Structure
2.1.1 Front view:
: Cover
: Strut Bar
: Control Column
: Sample Hole
: Body
: Power
: Indicator
: Detector
: Collimator
-Page 2 -
Sales@Lisungroup.com
www.Lisungroup.com
2.2 Installation
2.2.1 Preparation for operation. The RoHS test system needs enough space as follows:
-Page 3 -
Sales@Lisungroup.com
2.2.2 Connection
-Page 4 -
www.Lisungroup.com
Sales@Lisungroup.com
www.Lisungroup.com
Part 3 Operation
3.1 RoHS testing process
START
CHECK
CONNECTION
FIRST TEST NO
PREHEAT 30min
YES
SET 200s
NO
TESTING
TIME 200s
YES
INITIALIZATION?
YES
CHOOSE CURVE
CHOOSE COLILIMATOR
TEST
START TO
PRINT
YES
PRINT
NO
END
-Page 5 -
NO
Sales@Lisungroup.com
www.Lisungroup.com
3.2 Preparation
Before switching on EDX, check all the connections. Then power on PC, printer, EDX-2,
and preheat 30min.Initiallize EDX-2, put in silver slice, choose 1# collimator, click
Wrong mode and collimator and too short RoHS test time lead to additional error.
Too small unknown sample or not in the center of he cross of camera lead error.
-Page 6 -
Sample BatchNo.1250
OperatorJacky Jiang
Analysis Date2010-03-14
Tube Voltage(KV) 45kV
Work Curve UsedPE
Y-
4500
4360
4000
3500
3000
2500
2000
1500
1000
Hg
As BrPb
2048
500
Cd
0
0
Element
As
Hg
Pb
Br
Cd
200
400
600
Intensity
0.0020
0.0014
0.0054
0.1454
0.0024
800
1000
1200
Content(ppm)
28.02
25.26
94.04
538.68
121.97
1400
1600
Limitation
1000
1000
1000
1000
100
1800
2000
Results
X-
Pass
Pass
Pass
Pass
False