> L3_33_Good_Practices_A_01
1.1) Introduction
What is a Good Practices ?
What is NOT Good Practices ?
> L3_33_Good_Practices_A_01
1.2) Introduction
What is a Good Practices ?
GOOD PRACTICE IS A
METHOD
TO SOLVE ONE
SPECIAL PROBLEM
If there is no problem
no Cooking Recipe
no Good Practice
Question
> L3_33_Good_Practices_A_01
by Stages
1.
Design / Engineering
2.
Configuration / Installation
3.
Validation
4.
Commissioning / Maintenance
Blocking
Major
Minor
> L3_33_Good_Practices_A_01
Non Applicable
Acceptable
Fully mandatory,
no derogation
70
Mandatory,
50
Recommended
30
Optional
Obsolete GP,
Not applicable
in business case
0
n.a.
5
> L3_33_Good_Practices_A_01
(when solved)
Capitalize experience
> L3_33_Good_Practices_A_01
Good Practices
On Design
On Configuration
On Installation
> L3_33_Good_Practices_A_01
B) Data List
Policies
SWR
> L3_33_Good_Practices_A_01
Classification of Configuration GP
A) Naming
B) Data Base
C) Profiles / Archive
D) Electric
E) Scs
F) Graphic
> L3_33_Good_Practices_A_01
Profiles
SCS
Graphics
Electric
Automations
UserFunction, input/output
B) Data Base
10
Version
Check
> L3_33_Good_Practices_A_01
10
MV
transmission
Profile
Split Electric/Scs
No toggling/FSS/log
Boolean (same for all, DPS motion, FSS)
logging => archive, archive one state => all states
alarm is archived, audible if set
NO alarm / logging unknown
for FAT C264=OI, all DP on State panel
for SAT optimization
11
> L3_33_Good_Practices_A_01
11
GroupSPS
DP
xPC
xPS/xPC
no wiring/profile inversion
MV
acquisition 20%
AI
Synchrocheck
PSL
no loop, 3 blocks,
SPS output (arch) + Control on State change
12
Isagraf
Uniqueness
> L3_33_Good_Practices_A_01
12
toggling/transmission/acquisition
Systrap policy
LBUS
Port
T103 Acq
IED
TBUS
F) Graphic
User rights
Win/mimic
no resize
ActiveX
Use GIF
13
> L3_33_Good_Practices_A_01
13
5) GP3 Install
A) Commissioning Forms
PACiS devices C264 upgrade, OI
External devices
B) PC
Directories manual, tools, sharing
saving installation
reg, dat,
DCOM config
Remote OI
VNC or equivalent
C) Ethernet
cable/wiring
SWx
D) Extern devices
C264
printer, modem
Hopf
RuggedCom
14
> L3_33_Good_Practices_A_01
14
6) Conclusion
Good Practice
Addressed to special problem
Application Ratio
Process on GP
Created when facing problem
Evolution with product and business
ongoing listing of the practices (tool)
COE
Specification DCSR audit
Data Base audit
Manufacturing audit
Site audit
15
> L3_33_Good_Practices_A_01
15