RoutineTestofCircuitBreakers
UnderElectricalSwitchgear
Thispageisallabout:
PowerFrequencyOverVoltageWithstandTest
OneMinuteDryPowerFrequencyVoltageWithstandTest
Dielectrictestonauxiliaryandcontrolcircuit
Measurementoftheresistanceofmaincircuit
TightnessTest
VisualChecks
MechanicalOperationTest
Variousroutinetestsareperformedforensuringthequality,performanceofacircuit
breakerandtheseare
http://www.electrical4u.com/routinetestofcircuitbreakers/
1/8
9/13/2015
RoutineTestofCircuitBreakers|Electrical4u
1.PowerFrequencyOverVoltagewithstandtest
2.Dielectrictestonauxiliarycircuitandcontrolcircuit
3.Measurementofresistanceofmaincircuitorcontactresistancetest
4.TightnesstestorSF6gasleakagetest
5.Designandvisualchecks
6.Mechanicaloperationtests.
CB Lockout Rings
Only FAA-PMA-Authorized CB Rings From FAA 8130-3 Certificate Holder
Letusdiscussthemonebyone.
PowerFrequencyOverVoltageWithstandTest
Thepowersystemmayexperiencedifferenttemporarypowerovervoltageconditions
maybeduetosuddencutofloadfromthesystem,wrongoperationofonlinetap
changer,insufficientshuntcompensationinthesystem,etc.Powerfrequencyover
voltagewithstandtestofcircuitbreakerisperformedtoverifysufficiencyofinsulation
strengthofthemaincircuittowithstandthiskindofabnormalovervoltageconditions
ofthesystem.Thecircuitbreakershouldalsobedesignedtobecapableofwithstanding
overvoltagesduetolightningandswitchingimpulses.Acircuitbreakerlikeother
costlyengineeringequipment,aredesignedforsafelyfacingallkindofabnormal
situations,butatthesametime,thedesignerscannotsacrificeeconomicalaspects.To
verifythecapabilityofwithstandingallkindsofovervoltagesconditionswithout
sacrificingtheeconomicalaspectsofmanufacturing,acircuitbreakerhastogothrough
andpassdifferentdielectrictests.Butonlypowerfrequencyovervoltagewithstandtest
comesunderthecategoryofroutinetestofcircuitbreakers
OneMinuteDryPowerFrequencyVoltageWithstandTest
Itisassumedthatovervoltageconditions,atpowerfrequencycannotbesustained
beyondoneminutetimemoreoveritisactuallysustainedformuchlesstimethanone
minuteduration.Thistestiscarriedouttoverifywhethertheinsulationprovidedinthe
http://www.electrical4u.com/routinetestofcircuitbreakers/
2/8
9/13/2015
RoutineTestofCircuitBreakers|Electrical4u
maincircuitofbreakeriscapableofwithstandingpowerfrequencyovervoltagesfor
longoneminutedurationornot.Thetestisperformedindryconditionsofthebreaker.
Thepowerfrequencyvoltages,appliedtothebreakerduringthetest,arespecifiedinthe
standardasperthenominalvoltagelevelofthesystem.
LetusdiscussonecommonexampleofOneMinuteDryPowerFrequencyVoltage
WithstandTestofSF6CircuitBreaker.Herenormallytopofallpolesofallcircuit
breakersofsamevoltageratingtobetested,areconnectedtogetherpreferablybycopper
conductor.Thisconnectionthenisearthedproperly.Similarlybaseofallcircuit
breakersundertesttobeproperlyconnectedtoearth.Thebuttonofallpolesofallcircuit
breakersundertest,areconnectedtogetherpreferablybycopperconductor.This
connectionthenisconnectedtothephaseterminalofsinglephasehighvoltagecascaded
transformer.Highvoltagetransformerusedhereisancascadedautotransformerwhere
inputvoltagecanbevariedfromzerotoseveralhundredvoltsandcorresponding
secondaryvoltagewouldbezerotoseveralhundredkilovolts.Duringtestthevoltageis
appliedatthebuttonterminalofbreakersbyhighvoltagecascadedtransformer,and
variedfrom0tospecifiedvalueslowlyandgentlythenstaytherefor60secondand
http://www.electrical4u.com/routinetestofcircuitbreakers/
3/8
9/13/2015
RoutineTestofCircuitBreakers|Electrical4u
thenslowlydecreasedtozero.Duringtesttheleakagecurrenttothegroundtobe
measuredandtheleakagecurrentshouldnotcrossthespecifiedmaximumallowed
limit.Anyfailureofinsulationduringtestindicatestheinsufficiencyofinsulationused
inbreaker.
Dielectrictestonauxiliaryandcontrolcircuit
Theremaybeabnormalovervoltageconditionintheauxiliaryandcontrolsupply
circuits,too.Hence,theauxiliaryandcontrolcircuitsofbreakersshouldalsobegone
throughshortdurationpowerfrequencyvoltagewithstandtest.Heretestvoltageof2000
Visappliedfordurationofoneminute.Theinsulationofauxiliaryandcontrolcircuit
shouldpassthistest,andthereshouldnotbeanydestructivedischargeduringthetest.
Measurementoftheresistanceofmaincircuit
TheresistanceofmaincircuitismeasuredfromDCvoltagedropacrossthecircuit.In
thistest,directcurrentisinjectedtothecircuitandcorrespondingvoltagedropis
measuredandfromtheseresistanceofthecircuitismeasured.Theinjectedcurrent
wouldbefrom100Atomaximumratedcurrentofthecircuitbreaker.Themaximum
measuredvaluecanbe1.2timesthevalueobtainedatthetemperaturerisetest.
TightnessTest
Thistestiscarriedoutonmainlygasinsulatedswitchgear.Inthistest,leakagerateis
measured.Thistestensuresthedesiredlifespanoftheswitchgear.Hereallthejointing
pointsinthegascontainingpathsarecoveredairtightlywiththinsheetsofpolythene
(preferablytransparent)formorethan8hoursandthenthegasdensityinsidethiscovers
ismeasuredbyinsertinggasdetectingportofagasdetectorthroughaholenowcreated
onthecovers.Themeasurementistakeninppmunitandshouldbewithinthespecified
limit.Maximumlimitofgasleakage3ppm/8hours,istakenasstandard.
http://www.electrical4u.com/routinetestofcircuitbreakers/
4/8
9/13/2015
RoutineTestofCircuitBreakers|Electrical4u
VisualChecks
Thecircuitbreakershouldbevisuallycheckedforlanguageanddataonthetemplates,
properidentificationmarkofanyauxiliaryequipment,colorandqualityofpaintand
corrosiononmetallicsurface,etc.
MechanicalOperationTest
http://www.electrical4u.com/routinetestofcircuitbreakers/
5/8
9/13/2015
RoutineTestofCircuitBreakers|Electrical4u
Thecircuitbreakermustbesmoothlyoperatedatmaximumaswellasminimum
allowableauxiliaryandcontrolcircuitsupplyvoltage.Closingandtrippingoperation
shouldbeperformedatleast5timesforspecifiedmaximumallowablecontrolcircuit
supplyvoltageaswellasspecifiedminimumallowablecontrolcircuitsupplyvoltage.
Theclosingandopeningoperationofcircuitbreakerarealsobecheckedforrated
supplyvoltageofcontrolcircuit.110%ofcontrolvoltageistakenasmaximumlimitfor
closingandopeningoperationofcircuitbreaker.85%ofcontrolvoltageistakenas
minimumlimitforclosingoperationofcircuitbreakerand70%ofcontrolvoltageis
takenasminimumlimitforopeningortrippingoperationofcircuitbreaker.During
maximumandminimumcontrolvoltageoperationitwouldbefoundthatoperating
timesarelessandmorerespectivelythanthatinratedcontrolvoltagebutallthetimes
shouldbewithinspecifiedtimeslimits.Ifitisapplicable,suchasinthecaseof
pneumaticcircuitbreakers,thebreakershouldalsobeoperatedatleast5timesin
specifiedmaximumallowableoperatingpressure,inspecifiedminimumallowable
operatingpressureandinspecifiedratedoperatingpressure.Acircuitbreakerisalso
intendedforrapidautoreclosingatleast5opencloseoperatingcyclesshouldbe
checkedagainstspecificationgivenontheratingplate.Theactualtimeintervalbetween
openandcloseoperationsshouldbetalliedwiththetimeintervalgivenintheoperating
cyclespecification.Whenthecircuitbreakersareshippedasseparateunitsand
reassembledatsite,themanufacturershouldparticipateincommissioningtesttogive
confirmationaboutcompatibilityofsuchseparateunitsandcomponentswhen
assembledasacompletecircuitbreaker.Forallrequiredoperationsequences,thetest
shouldbeconductedandallclosingandopeningoperatingtimesalongwithintervals
betweentwoconjugativeoperationsarerecorded.Whereapplicable,themeasurements
offluidcompression(pressuredifference)duringcircuitbreakeroperationarealso
recorded.
Noloadoperatingcyclecanbeperformedonthecircuitbreakertodrawthenoload
travelcurve.Thecurveshouldbewithintheprescribedenvelopeofthereference
mechanicaltravelcharacteristics.
NB:Theparametersshouldbemeasuredandrecordedduringoperationtestof
circuitbreaker,aregivenbelow
Closingtimeofeachpole
http://www.electrical4u.com/routinetestofcircuitbreakers/
6/8
9/13/2015
RoutineTestofCircuitBreakers|Electrical4u
Closingtimedifferencebetweenpolesorclosingmismatchtime
Openingtimeofeachpole
Openingtimedifferencebetweenpolesoropeningmismatchtime
CloseOpentimeofeachpole
Timedifferencebetweentwoconjugativeopeningoperation(OCO)
Maximumbounceofmovingcontactduringclosingoperation
Totalbounceofmovingcontactduringclosingoperation
Overtravelofmovingcontact
Contactspeedforclosingindeg/ms(astransducerisofrotarytype)
Contactspeedforopeningindeg/ms(astransducerisofrotarytype)
Dampingtimeduringopening
Springchargingtime
Whensubassembliesofcircuitbreakerarefittedtogetheratsite,themechanicaltravel
characteristicsofthebreakershouldconfirmthecorrectnessattheendofthe
commissioningtestonsite.Ifthisisdoneonsite,themanufacturershouldprescribethe
exactprocedureofdoingthatotherwisetheresultmaybedifferentandthecomparison
oftheinstantaneouscontactstrokemaybeimpossibletoachieve.Themechanicaltravel
characteristicsofcircuitbreakercontactsareproducedbyusingtraveltransduceror
similardeviceconnectedtothecircuitbreakercontactsmechanism.
Inadditiontothis,eachconnectioninthecontrolandauxiliarycircuitinthecircuit
breakerkioskshouldbechecked.Itshouldalsobecheckedwhethercontroland/or
auxiliaryswitchescorrectlyindicatetheopenandclosepositionofcircuitbreaker.All
auxiliaryequipmentsshouldalsobeoperatedcorrectlyandsmoothlyforspecified
maximumandminimumallowablecontrolvoltagesupply.
http://www.electrical4u.com/routinetestofcircuitbreakers/
7/8
9/13/2015
RoutineTestofCircuitBreakers|Electrical4u
Like
Share 29,895peoplelikethis.
Enteryoursuggestion/commenthere
Name:
Enteryournamehere
Email:
Enteryouremailhere
Location:
Enteryourlocationhere
Suggestion/Comment:
Enteryourcomments/suggestionhere
Entertheabovecodehere
Regenerate
Submit
Reset
20112015electrical4u.Thecontentiscopyrightedtoelectrical4uandmaynotbereproducedonother
websites.
http://www.electrical4u.com/routinetestofcircuitbreakers/
8/8