18364 Federal Register / Vol. 71, No.

69 / Tuesday, April 11, 2006 / Notices

NUCLEAR REGULATORY The NRC staff has prepared an EA in [ML032461491]; Request for Additional
COMMISSION support of the license amendment. The Information (RAI) dated September 11,
facility was remediated and surveyed 2003 [ML032541251]; Gibraltar
[Docket No. 030–34998]
prior to the licensee requesting the Laboratories, Inc.’s response dated
Notice of Availability of Environmental license amendment. The NRC staff has November 13, 2003 [ML033370153];
Assessment and Finding of No reviewed the information and final Facsimile from Gibraltar Laboratories,
Significant Impact for License status survey submitted by Gibraltar Inc., received November 14, 2003, with
Amendment for Gibraltar Laboratories, Laboratories, Inc. Based on its review, additional information concerning
Inc.’s Facility in Fairfield, NJ the staff has determined that there are survey instruments [ML033380939];
no additional remediation activities Voidance of Licensing Action by U.S.
AGENCY: Nuclear Regulatory necessary to complete the proposed NRC pending submission of required
Commission. action. Therefore, the staff considered information [ML033240028]; and Final
ACTION: Notice of availability. the impact of the residual radioactivity Status Survey Results for Gibraltar
at the facility and concluded that since Laboratories, Inc., 122 Fairfield Road,
FOR FURTHER INFORMATION CONTACT: the residual radioactivity meets the Fairfield, New Jersey, dated October 11,
Steven Courtemanche, Commercial and requirements in subpart E of 10 CFR 2005 [ML052940339]. Persons who do
R&D Branch, Division of Nuclear part 20, a Finding of No Significant not have access to ADAMS or who
Materials Safety, Region I, 475 Impact is appropriate. encounter problems in accessing the
Allendale Road, King of Prussia, documents located in ADAMS, should
Pennsylvania, 19406, telephone (610) III. Finding of No Significant Impact
contact the NRC PDR Reference staff by
337–5075, fax (610) 337–5269; or by e- The staff has prepared the EA telephone at (800) 397–4209 or (301)
mail: src@nrc.gov. (summarized above) in support of the 415–4737, or by e-mail to pdr@nrc.gov.
SUPPLEMENTARY INFORMATION: license amendment to terminate the Documents related to operations
license and release the facility for conducted under this license not
I. Introduction unrestricted use. The NRC staff has specifically referenced in this Notice
The U.S. Nuclear Regulatory evaluated Gibraltar Laboratories, Inc.’s may not be electronically available and/
Commission (NRC) is considering the request and the results of the surveys or may not be publicly available.
issuance of a license amendment to and has concluded that the completed Persons who have an interest in
Gibraltar Laboratories, Inc., for Materials action complies with the criteria in reviewing these documents should
License No. 29–30516–01, to authorize subpart E of 10 CFR part 20. The staff
submit a request to NRC under the
release of its facility in Fairfield, New has found that the radiological
Freedom of Information Act (FOIA).
Jersey for unrestricted use and terminate environmental impacts from the action
Instructions for submitting a FOIA
the license. NRC has prepared an are bounded by the impacts evaluated
request can be found on the NRC’s Web
Environmental Assessment (EA) in by NUREG–1496, Volumes 1–3,
site at http://www.nrc.gov/reading-rm/
support of this proposed action in ‘‘Generic Environmental Impact
foia/foia-privacy.html.
accordance with the requirements of 10 Statement in Support of Rulemaking on
CFR part 51. Based on the EA, the NRC Radiological Criteria for License Dated at King of Prussia, Pennsylvania, this
has concluded that a Finding of No Termination of NRC-Licensed 28th day of March, 2006.
Significant Impact (FONSI) is Facilities’’ (ML042310492, For the Nuclear Regulatory Commission.
appropriate. The amendment will be ML042320379, and ML042330385). James P. Dwyer,
issued following the publication of this Additionally, no non-radiological or Chief, Commercial and R&D Branch, Division
Notice. cumulative impacts were identified. On of Nuclear Materials Safety Region I.
the basis of the EA, the NRC has [FR Doc. E6–5213 Filed 4–10–06; 8:45 am]
II. EA Summary
concluded that there are no significant BILLING CODE 7590–01–P
The purpose of the proposed action is environmental impacts from the
to authorize the release of the licensee’s proposed action, and has determined
Fairfield, New Jersey facility for not to prepare an environmental impact NUCLEAR REGULATORY
unrestricted use and terminate the statement for the proposed action. COMMISSION
license. Gibraltar Laboratories, Inc., was
authorized by NRC from 1999 to use IV. Further Information
[Docket No. 030–33468]
radioactive materials for research and Documents related to this action,
development purposes at the site. On including the application for the license Notice of Availability of Environmental
August 27, 2003, Gibraltar Laboratories, amendment and supporting Assessment and Finding of No
Inc., requested that NRC release the documentation, are available Significant Impact for License
facility for unrestricted use. This electronically at the NRC’s Electronic Amendment for Multipixel Systems,
licensing action was voided because Reading Room at http://www.nrc.gov/ Inc.’s Facility in Ramsey, NJ
insufficient information was provided reading-rm/adams.html. From this site,
by Gibraltar Laboratories, Inc., to allow you can access the NRC’s Agencywide AGENCY: Nuclear Regulatory
for the release of the facility for Document Access and Management Commission.
unrestricted use. On October 11, 2005, System (ADAMS), which provides text ACTION: Notice of availability.
Gibraltar Laboratories, Inc., provided and image files of NRC’s public
the additional information requested on documents. The ADAMS accession FOR FURTHER INFORMATION CONTACT:
August 27, 2003. Gibraltar Laboratories, numbers for the documents related to Steve Hammann, Commercial and R&D
Inc., has conducted surveys of the this Notice are: Environmental Branch, Division of Nuclear Materials
wwhite on PROD1PC61 with NOTICES

facility and provided information to the Assessment [ML060830021]; Initial Safety, Region I, 475 Allendale Road,
NRC to demonstrate that the site meets request for termination of license with King of Prussia, Pennsylvania 19406,
the license termination criteria in survey results for Gibraltar Laboratories, telephone (610) 337–5399, fax (610)
subpart E of 10 CFR part 20 for Inc., 122 Fairfield Road, Fairfield, New 337–5269; or by e-mail: sth2@nrc.gov.
unrestricted release. Jersey, dated August 27, 2003 SUPPLEMENTARY INFORMATION:

VerDate Aug<31>2005 19:37 Apr 10, 2006 Jkt 208001 PO 00000 Frm 00097 Fmt 4703 Sfmt 4703 E:\FR\FM\11APN1.SGM 11APN1
Federal Register / Vol. 71, No. 69 / Tuesday, April 11, 2006 / Notices 18365

I. Introduction by NUREG–1496, Volumes 1–3, NUCLEAR REGULATORY


The U.S. Nuclear Regulatory ‘‘Generic Environmental Impact COMMISSION
Commission (NRC) is considering the Statement in Support of Rulemaking on
Radiological Criteria for License [Docket No. 030–32749]
issuance of a license amendment to
Multipixel Systems, Inc. for Materials Termination of NRC-Licensed Notice of Availability of Environmental
License No. 45–25288–01, to authorize Facilities’’ (ML042310492, Assessment and Finding of No
release of its facility in Ramsey, New ML042320379, and ML042330385). Significant Impact for License
Jersey for unrestricted use. NRC has Additionally, no non-radiological or Amendment for Neose Technology,
prepared an Environmental Assessment cumulative impacts were identified. On Inc’s Facility in Horsham, PA
(EA) in support of this proposed action the basis of the EA, the NRC has
in accordance with the requirements of concluded that there are no significant AGENCY: Nuclear Regulatory
10 CFR Part 51. Based on the EA, the environmental impacts from the Commission.
NRC has concluded that a Finding of No proposed action, and has determined ACTION: Notice of availability.
Significant Impact (FONSI) is not to prepare an environmental impact
appropriate. The amendment will be statement for the proposed action. FOR FURTHER INFORMATION CONTACT:
issued following the publication of this Steve Hammann, Commercial and R&D
IV. Further Information
Notice. Branch, Division of Nuclear Materials
Documents related to this action, Safety, Region I, 475 Allendale Road,
II. EA Summary King of Prussia, Pennsylvania, 19406,
including the application for the license
The purpose of the proposed action is amendment and supporting telephone (610) 337–5399, fax (610)
to authorize the release of the licensee’s documentation, are available 337–5269; or by e-mail: sth2@nrc.gov.
Ramsey, New Jersey facility for electronically at the NRC’s Electronic SUPPLEMENTARY INFORMATION:
unrestricted use. Multipixel Systems, Reading Room at http://www.nrc.gov/
Inc. was authorized by NRC from 1999 I. Introduction
reading-rm/adams.html. From this site,
to use radioactive materials for research you can access the NRC’s Agencywide The U.S. Nuclear Regulatory
and development and instrument Document Access and Management Commission (NRC) is considering the
calibration purposes at the site. On System (ADAMS), which provides text issuance of a license amendment to
November 23, 2005, Multipixel Systems, and image files of NRC’s public Neose Technology, Inc. for Materials
Inc. requested that NRC release the documents. The ADAMS accession License No. 37–28751–01, to authorize
facility for unrestricted use. Multipixel numbers for the documents related to release of its facility in Horsham,
Systems, Inc. has conducted surveys of this Notice are: Environmental Pennsylvania for unrestricted use. NRC
the facility and provided information to Assessment ML060860071; Letter dated has prepared an Environmental
the NRC to demonstrate that the site August 23, 2004 [ML042470096]; Assessment (EA) in support of this
meets the license termination criteria in Amendment Request Letter dated proposed action in accordance with the
Subpart E of 10 CFR Part 20 for November 23, 2005 [ML053460312]; requirements of 10 CFR part 51. Based
unrestricted release. Phone Log dated December 19, 2005 on the EA, the NRC has concluded that
The NRC staff has prepared an EA in [ML060240513]; and Additional a Finding of No Significant Impact
support of the license amendment. The Information Letter dated January 12, (FONSI) is appropriate. The amendment
facility was remediated and surveyed 2006 [ML060240285]. Persons who do will be issued following the publication
prior to the licensee requesting the not have access to ADAMS or who of this Notice.
license amendment. The NRC staff has encounter problems in accessing the II. EA Summary
reviewed the information and final documents located in ADAMS, should
status survey submitted by Multipixel The purpose of the proposed action is
contact the NRC PDR Reference staff by
Systems, Inc. Based on its review, the to authorize the release of the licensee’s
telephone at (800) 397–4209 or (301)
staff has determined that there are no Horsham, Pennsylvania facility for
415–4737, or by e-mail to pdr@nrc.gov.
additional remediation activities unrestricted use. Neose Technology, Inc.
necessary to complete the proposed Documents related to operations was authorized by NRC from 1992 to
action. Therefore, the staff considered conducted under this license not use radioactive materials for research
the impact of the residual radioactivity specifically referenced in this Notice and development purposes at the site.
at the facility and concluded that since may not be electronically available and/ On August 1, 2005, Neose Technology,
the residual radioactivity meets the or may not be publicly available. Inc. requested that NRC release the
requirements in Subpart E of 10 CFR Persons who have an interest in facility for unrestricted use. Neose
Part 20, a Finding of No Significant reviewing these documents should Technology, Inc. has conducted surveys
Impact is appropriate. submit a request to NRC under the of the facility and provided information
Freedom of Information Act (FOIA). to the NRC to demonstrate that the site
III. Finding of No Significant Impact Instructions for submitting a FOIA meets the license termination criteria in
The staff has prepared the EA request can be found on the NRC’s Web Subpart E of 10 CFR part 20 for
(summarized above) in support of the site at http://www.nrc.gov/reading-rm/ unrestricted release.
license amendment to release the foia/foia-privacy.html. The NRC staff has prepared an EA in
facility for unrestricted use. The NRC Dated at King of Prussia, Pennsylvania this support of the license amendment. The
staff has evaluated Multipixel Systems, 28th day of March, 2006. facility was remediated and surveyed
Inc.’s request and the results of the prior to the licensee requesting the
For the Nuclear Regulatory Commission.
surveys and has concluded that the license amendment. The NRC staff has
wwhite on PROD1PC61 with NOTICES

completed action complies with the James P. Dwyer, reviewed the information and final
criteria in Subpart E of 10 CFR Part 20. Chief, Commercial and R&D Branch, Division status survey submitted by Neose
The staff has found that the radiological of Nuclear Materials Safety, Region I. Technology, Inc. Based on its review,
environmental impacts from the action [FR Doc. E6–5257 Filed 4–10–06; 8:45 am] the staff has determined that there are
are bounded by the impacts evaluated BILLING CODE 7590–01–P no additional remediation activities

VerDate Aug<31>2005 19:37 Apr 10, 2006 Jkt 208001 PO 00000 Frm 00098 Fmt 4703 Sfmt 4703 E:\FR\FM\11APN1.SGM 11APN1