16134 Federal Register / Vol. 71, No.

61 / Thursday, March 30, 2006 / Notices

Number of responses per Average burden hours per


Number of respondents annually Total annual burden hours
respondent response
(1) (1)×(2)×(3)
(2) (3)

215 1 50 10,750

The estimated total annual cost to e.g., permitting electronic submission of There is an ‘‘eSubscription’’ link on the
respondents is $606,347. (10,750 burden responses. Web site that enables subscribers to
hours/2080 work hours per year × Magalie R. Salas,
receive e-mail notification when a
$117,321 annual average salary per document is added to a subscribed
Secretary. docket(s). For assistance with any FERC
employee). The estimated annual cost
[FR Doc. E6–4592 Filed 3–29–06; 8:45 am] Online service, please e-mail
per respondent is $2,820.
BILLING CODE 6717–01–P FERCOnlineSupport@ferc.gov, or call
The reporting burden includes the
(866) 208–3676 (toll free). For TTY, call
total time, effort, or financial resources (202) 502–8659.
expended to generate, maintain, retain, DEPARTMENT OF ENERGY Comment Date: 5 p.m. Eastern Time
disclose, or provide the information on April 6, 2006.
including: (1) Reviewing instructions; Federal Energy Regulatory
(2) developing, acquiring, installing, and Commission Magalie R. Salas,
utilizing technology and systems for the [Docket No. ER05–849–003] Secretary.
purposes of collecting, validating, [FR Doc. E6–4590 Filed 3–29–06; 8:45 am]
verifying, processing, maintaining, California Independent System BILLING CODE 6717–01–P
disclosing and providing information; Operator Corporation; Notice of
(3) adjusting the existing ways to Compliance Filing
comply with any previously applicable DEPARTMENT OF ENERGY
March 23, 2006.
instructions and requirements; (4) Take notice that on March 16, 2006, Federal Energy Regulatory
training personnel to respond to a the California Independent System Commission
collection of information; (5) searching Operator Corporation tendered for filing
data sources; (6) completing and [Docket No. CP03–41–003]
in compliance with Commission Order
reviewing the collection of information; issued June 22, 2005, Amendment No. Dominion Transmission, Inc.; Notice of
and (7) transmitting, or otherwise 68 that allows generators operating Filing
disclosing the information. under the ISO tariff to self-supply their
The estimate of cost for respondents Station Power requirements from either March 23, 2006.
is based upon salaries for professional on-site or remote supply. Take notice that on March 15, 2006,
and clerical support, as well as direct Any person desiring to intervene or to Dominion Transmission, Inc.
and indirect overhead costs. Direct costs protest this filing must file in (Dominion), 120 Tredegar Street,
include all costs directly attributable to accordance with Rules 211 and 214 of Richmond, Virginia 23219, filed an
providing this information, such as the Commission’s Rules of Practice and abbreviated application pursuant to
administrative costs and the cost for Procedure (18 CFR 385.211, 385.214). section 7 of the Natural Gas Act (NGA)
Protests will be considered by the and Part 157 of the Commission’s Rules
information technology. Indirect or
Commission in determining the and Regulations, seeking to clarify the
overhead costs are costs incurred by an
appropriate action to be taken, but will nameplate horsepower ratings for the
organization in support of its mission.
not serve to make protestants parties to turbine engine/compressor units at
These costs apply to activities, which the proceeding. Any person wishing to Mockingbird Hill and Quantico
benefit the whole organization rather become a party must file a notice of compressor stations in Wetzel County,
than any one particular function or intervention or motion to intervene, as West Virginia and Fauquier County,
activity. appropriate. Such notices, motions, or Virginia, respectively. This filing is
Comments are invited on: (1) Whether protests must be filed on or before the available for review at the Commission
the proposed collection of information comment date. Anyone filing a motion in the Public Reference Room or may be
is necessary for the proper performance to intervene or protest must serve a copy viewed on the Commission’s Web site at
of the functions of the Commission, of that document on the Applicant and http://www.ferc.gov using the
including whether the information will all the parties in this proceeding. ‘‘eLibrary’’ link. Enter the docket
have practical utility; (2) the accuracy of The Commission encourages number excluding the last three digits in
the agency’s estimate of the burden of electronic submission of protests and the docket number field to access the
the proposed collection of information, interventions in lieu of paper using the document. For assistance, please contact
including the validity of the ‘‘eFiling’’ link at http://www.ferc.gov. FERC Online Support at
methodology and assumptions used; (3) Persons unable to file electronically FERCOnlineSupport@ferc.gov or toll
ways to enhance the quality, utility and should submit an original and 14 copies free at (866) 208–3676, or for TTY,
of the protest or intervention to the contact (202) 502–8659.
clarity of the information to be
Federal Energy Regulatory Commission, On September 11, 2003, the
collected; and (4) ways to minimize the
888 First Street, NE., Washington, DC Commission issued a certificate in
cprice-sewell on PROD1PC66 with NOTICES

burden of the collection of information


20426. Docket No. CP03–41–000 authorizing
on those who are to respond, including This filing is accessible on-line at Dominion to construct, install, own,
the use of appropriate automated, http://www.ferc.gov, using the operate, and maintain the Mockingbird
electronic, mechanical, or other ‘‘eLibrary’’ link and is available for Hill compressor station with a 5,000
technological collection techniques or review in the Commission’s Public nominal horsepower (HP) turbine
other forms of information technology Reference Room in Washington, DC. engine/compressor unit; and the

VerDate Aug<31>2005 15:32 Mar 29, 2006 Jkt 208001 PO 00000 Frm 00022 Fmt 4703 Sfmt 4703 E:\FR\FM\30MRN1.SGM 30MRN1
Federal Register / Vol. 71, No. 61 / Thursday, March 30, 2006 / Notices 16135

Quantico compressor station with a DEPARTMENT OF ENERGY Comment Date: 5 p.m. Eastern Time
6,000 nominal HP turbine engine/ on March 30, 2006.
compressor unit. In the September 11, Federal Energy Regulatory
Magalie R. Salas,
2003 application, Dominion proposed to Commission
Secretary.
refurbish and install the units from
[FR Doc. E6–4655 Filed 3–29–06; 8:45 am]
Dominion’s existing Crayne compressor [Docket No. CP04–365–002]
BILLING CODE 6717–01–P
station, at Mockingbird Hill and
Quantico. After refurbishing, the units Dominion Transmission, Inc.; Notice of
have the nameplate HP ratings of 5,800 Proposed Changes in FERC Gas Tariff
DEPARTMENT OF ENERGY
HP and 6,100 HP, respectively. March 24, 2006.
Dominion does not request an increase Federal Energy Regulatory
Take notice that on March 22, 2006, Commission
in capacity, or any other certificated Dominion Transmission, Inc. (DTI)
level. The units were placed in service tendered for filing as part of its FERC [Docket No. OR06–6–000 and Enbridge
on November 1, 2004. Gas Tariff, Third Revised Volume No. 1, Offshore Facilities, LLC]
Any questions regarding the the following tariff sheets, to become
Notice of Petition for Declaratory Order
application are to be directed to effective the later of April 1, 2006, or the
Matthew R. Bley, Manager, Gas commencement date of incremental March 24, 2006.
Transmission Certificates, Dominion storage services offered as part of its Take notice that on March 17, 2006,
Transmission, Inc., 120 Tredegar Street, Northeast Storage Project: Enbridge Offshore Facilities, LLC
Richmond, Virginia 23219; phone Fifth Revised Sheet No. 36 (Enbridge) filed in Docket No. OR06–6–
number (804) 819–2877. First Revised Sheet No. 36A 000, a petition for declaratory order,
Any person wishing to obtain legal Original Sheet No. 41 pursuant to Rule 207(a)(2) of the
Sheet Nos. 42–99 Commission’s Rules of Practice and
status by becoming a party to the
Procedure (18 CFR 385.207(a)(2)).
proceedings for this project should, on The proposed changes would increase Enbridge requests that the Commission
or before the below listed comment revenues from jurisdictional issue an expedited decision on this
date, file with the Federal Energy incremental storage service by petition no later than mid-June 2006.
Regulatory Commission, 888 First approximately $2 million based on the Enbridge states that it is planning to
Street, NE., Washington, DC 20426, a 12-month period ending March 31, construct a 20-inch diameter, 26-mile
motion to intervene in accordance with 2007, as adjusted. crude oil pipeline Enbridge Oil Pipeline
the requirements of the Commission’s Any person desiring to protest this from production facilities servicing the
Rules of Practice and Procedure (18 CFR filing must file in accordance with Rule Neptune oil field in the Atwater Valley
385.214 or 385.211) and the Regulations 211 of the Commission’s Rules of area approximately 170 miles south of
under the NGA (18 CFR 157.10). A Practice and Procedure (18 CFR New Orleans, Louisiana in the
person obtaining party status will be 385.211). Protests to this filing will be deepwater Gulf of Mexico, to Caesar Oil
placed on the service list maintained by considered by the Commission in Pipeline. Enbridge Oil Pipeline is
the Secretary of the Commission and determining the appropriate action to be expected to commence service in 2007.
will receive copies of all documents taken, but will not serve to make Enbridge Oil Pipeline will also be
filed by the applicant and by all other protestants parties to the proceeding. available to serve fields to be developed
parties. A party must submit 14 copies Such protests must be filed on or before in the future in the western Atwater
of filings made with the Commission the date as indicated below. Anyone Valley and eastern Green Canyon areas.
filing a protest must serve a copy of that Enbridge states that the Enbridge Oil
and must mail a copy to the applicant
document on all the parties to the Pipeline will function in effect as an
and to every other party in the extension of Caesar Oil Pipeline. The
proceeding.
proceeding. Only parties to the Commission has approved contract
proceeding can ask for court review of The Commission encourages
electronic submission of protests in lieu carriage on Caesar Oil Pipeline,1 and
Commission orders in the proceeding. Caesar Oil Pipeline has entered into
of paper using the ‘‘eFiling’’ link at
Motions to intervene, protests and http://www.ferc.gov. Persons unable to transportation agreements with
comments may be filed electronically file electronically should submit an producers in the Neptune Field under
via the Internet in lieu of paper, see, 18 original and 14 copies of the protest to which Caesar Oil Pipeline has agreed to
CFR 385.2001 (a)(1)(iii) and the the Federal Energy Regulatory transport up to 60,000 barrels of oil per
instructions on the Commission’s Web Commission, 888 First Street, NE., day from the Neptune Field on contract
site under the ‘‘e-Filing’’ link. The Washington, DC 20426. carriage terms. Enbridge asserts that if
Commission strongly encourages those shippers and others who may ship
This filing is accessible on-line at on Enbridge Oil Pipeline in the future
electronic filings. http://www.ferc.gov, using the are to be assured that they can take
Comment Date: 5 p.m. Eastern Time ‘‘eLibrary’’ link and is available for advantage of their full contract rights to
on April 12, 2006. review in the Commission’s Public ship on Caesar Oil Pipeline, they must
Reference Room in Washington, DC. also be able to contract for rights to ship
Magalie R. Salas, There is an ‘‘eSubscription’’ link on the on Enbridge Oil Pipeline. Without such
Secretary. Web site that enables subscribers to complementary contractual rights to
[FR Doc. E6–4594 Filed 3–29–06; 8:45 am] receive e-mail notification when a
cprice-sewell on PROD1PC66 with NOTICES

ship on Enbridge Oil Pipeline, shippers


BILLING CODE 6717–01–P document is added to a subscribed will be concerned about the possibility
docket(s). For assistance with any FERC that common-carrier type pro rata
Online service, please e-mail allocation might be required on
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call 1 Caesar Oil Pipeline, 102 FERC ¶ 61,339 at PP 1,

(202) 502–8659. 37–38 (2003).